The paper addresses modeling and analysis of a grid-connected photovoltaic generation system (PV system). PSCAD/EMIDC. an industry standard simulation tool for studying the transient behavior of electric power system and apparatus. is used to conduct all aspects of model implementation and to carry out extensive simulation study. An equivalent circuit model of a solar cell has been used for modeling solar array. A PWM voltage source inverter (VSI) and its current control scheme have been implemented. A maximum power point tracking (MPPT) technique is employed for drawing the maximum available energy from the PV array. Comprehensive simulation results are presented to examine PV array behaviors and PV system control performance in response to irradiation changes. In addition, dynamic responses of PV array and system to network fault conditions are simulated and analysed
Recently, because of the depletion of fossil fuels and the environmental pollution by using fossil fuels and harmfulness of atomic power plants. the interests concerning new and renewable energy resources are rising increasingly. And of all new and renewable energy sources the PV generation systems are recognized as the most useful and desirable renewable energy source in allowance for installation conditions. In this development, the 3kWp photovoltaic power generation system is realized to verify the performance of the 3kWp PCS developed by Hyundai Heavy Industries Co. (HHI). The photovoltaic array used in this system is composed of 60 modules of 50Wp capacity. The developed system is tested as procedures and items of test regulation recognized by governmen and the experimental results show the excellent electrical characteristics. Now, the 3kWp PCS developed is installed in the PV model house built in HHI plant and is being tested for practical use commercialization.
BIPV system not only produces electricity at building, but also acts as a material for building envelope. Thus, it can increase the economical efficiency of PV system by saving the cost for building materials. Bifacial solar cell can convert solar energy to electrical energy from both sides of the cell. In addition, it is designed as 3 busbar layout which is the same with ordinary mono-facial solar cells. Therefore, many of the module manufacturers can easily use the bifacial solar cells without changing their manufacturing equipments. Moreover, bifacial PV system has much potential in building application by utilizing glass-to-glass structure of PV module. However, the electrical generation of the bifacial PV module depends on the characteristics of the building surface which faces the module, as well as outdoor environment. Therefore, in order to apply the bifacial PV module to building envelope as BIPV system, its power generation characteristics are carefully evaluated. For this purpose this study focused on the electrical performance of the bifacial BIPV system through the comparative outdoor experiments. As a result, the power generation performance of the bifacial BIPV system was improved by up to 21% compared to that of the monofacial BIPV system. Therefore, it is claimed that the bifacial BIPV system can replace the conventional BIPV system to improve the PV power generation in buildings.
The occurrence of algae caused by eutrophication of fresh water is a pollution source to destroy the aquatic environment. When the high voltage electric field is applied in the water, When a high voltage is applied to the electric field in the water, the algae can be broken the balance of cell membranes, and is dead. In this paper, we develop a water quality improvement system for generating an electric field having a higher energy than the zeta potential when a high voltage is applied to 4,000V. To ensure the mobility of the water quality improvement system, we designed the PV generation system using the optimal size technique that is based on the model of power lack ratio. By evaluating the output characteristics of the water quality improvement system, power generation characteristics of the PV generation system, and battery charging characteristics, we can show that the proposed system can be applicable to the water quality improvement system inhibiting the growth rate of the algae in the fresh water.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.2
/
pp.14-21
/
2013
Today, energy problem has become an important issue, and a development of renewable energy is urgent. In architectural fields, a research of the energy efficient lighting system using renewable energy is in progress. The energy efficient lighting system could be realized by integrating a daylight responsive LED lighting control system and a blind PV system. This system is able to save and generate electric energy. Efficiency of this system depends on control methods of blind PV. As a preliminary research, this research analyzed power generation and inflow of available daylight according to control method of blind PV.
The paper presents a method of assessing the adequate tapaclty of photovoltaic generation systems for public buildings based on analysis of load variation patterns of customers. When PV systems are installed for supplying power for the customer load, reverse power relay is required by the guideline to be installed at the point of common coupling with the power network. The suggested method analyzes daily, weekly and monthly load demand of the customer that Irishes PV system installation, and determines the appropriate rating of the PV system for preventing PV generation from exceeding the customer demand. This work is expected to support renewable energy dissemination projects of public organizations.
Journal of Advanced Marine Engineering and Technology
/
v.32
no.8
/
pp.1123-1128
/
2008
Marine facilities like buoy, lighthouse are operated with stand alone power supply system. This power system can consist of a stand-alone type power system such as PV(Photovoltaic) system, wave system or hybrid system which is not cooperated with a commercial power system. Generally, PV power system for marine facilities can not supply a sufficient power to buoy, because it is so influenced from weather condition. For solving this problem the hybrid power system with PV and wave is studied on a various area, that is why a hybrid power system is requires to overcome these problems. This paper will describe a generation characteristic of WEC(Wave Energy Converter) for buoy, and an AFS(Anti-Fouling System) influence on WEC.
Shunt active filter can compensate harmonic current of utility results from non-linear loads such as rectifiers, cycloconverters and arc furnaces. It has the same structure as photovoltaic(PV) generation system. So, It was proposed the system that generates PV power and also has active filter function. It is called PV-AF(Photovoltaic and Active Filter) power generation system. Islanding can be occurred in an inverter based dispersed generation system, when the system disconnected from utility and loads are entirely supplied by PV system only. Islanding may result in interference to grid protection devices, equipment damage, and even personnel safety hazards. Therefore, islanding has to be detected and protected. The conventional anti-islanding methods have NDZ(None-Detection Zone) or power quality degradation. But PV-AF power generation system has the function of not only shunt active filter but also anti-islanding method without NDZ. In this paper, a novel anti-islanding method for PV-AF system is proposed and analysed in detail.
Kim, Min-Gi;Choi, Bong-Yeon;Kang, Jin-Wook;Kim, Jun-Gu;Won, Chung-Yuen
Proceedings of the KIPE Conference
/
2014.07a
/
pp.443-444
/
2014
Using the ESS(Energy Storage System) as a UPS(Uninterruptible Power Supply) is being studied recently. When the system is operating at UPS mode in integrated ESS and UPS system, the grid supplying power is disconnected and power from PV generation and battery are supplying to load. Operating in UPS mode, when PV generation power is diminished by partial or total clouded situation, DC-link voltage fluctuates. The fluctuation of DC-link voltage influences the load and system as sensitive loads may malfunction. This paper suggests the DC-link ripple voltage compensation algorithm in bi-directional converter. The algorithm stabilize the DC-link and load voltage.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.6
/
pp.70-78
/
2008
This paper deals with the simulation modeling of PV generation system for its application to utility distribution network PSCAD/EMIDC simulation model is developed for use in studying the effect of the PV generation to the distribution system. Simulation results show that the addition of the PV system improves the voltage profile of the area by decreasing the power flow from the utility substation. Case studies also show that power quality at the load side is also improved via voltage compensation at the load bus.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.