• Title/Summary/Keyword: PPP(Public Private Partnership)

Search Result 60, Processing Time 0.024 seconds

South-South Collaborations: A Policy Recommendation Model for Sustainable Win-Win Infrastructure Partnerships Based on Sino - Ghana and Nigeria Case.

  • Eshun, Bridget Tawiah Badu;Chan, Albert P.C.;Oteng, Daniel;Antwi-Afari, Maxwell Fordjour
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.33-41
    • /
    • 2022
  • Infrastructure procurement has been a major engagement route between China and Africa. This contributes immensely to the gradual infrastructure development seen on the continent. However, maturing discourse purports that these infrastructure collaborations lack intentionality in the continuous development of strategic guidelines and policies for effective implementation despite their uniqueness and criticality. This study proposes that an efficient approach to policy recommendations is through the political and economic analysis (PEA) of these partnerships using public-private partnership (PPP) optics. Unquestionably, these partnerships are representative of the concept of diplomatic transnational public-private partnership (DT-PPP) where infrastructure is procured through the collaboration of public (African governments) and private sector (Chinese state-owned corporations) who provide the managerial, financial, and technical resources for the project implementation. Given the quest for sustainable win-win, this study identifies strategies towards the realization of win-win in the implementation (i.e enablers of win-win) such that fairness and co-benefit, as well as interests, will be achieved. Thus, based on the PEA framework, case scenarios from Ghana and Nigeria using expert interviews identify the criticalities and best practices for the realization of these enablers at the development phase. Findings indicate more effort is required of the public sector (African host countries) in terms of people, structure/institutions, and the implementation processes. Recommendations include improvement of environmental management structures, contract administration procedures, external stakeholders/local community engagement mechanisms, knowledge and technology transfer procedures, and sector-based project operation and maintenance culture and systems. Additionally, actors must have emotional intelligence, good problem-solving abilities, and overall ensure cordial relationships for continued bilateral cooperation.

  • PDF

EXPLORING POTENTIAL SUCCESS FACTORS FOR PROCUREMENT OF PRIVATELY FINANCED INFRASTRUCTURE

  • Xiao-Hua Jin;Chunlu Liu;Jian Zuo;Guomin Zhang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.132-141
    • /
    • 2011
  • Australia has joined many governments to adopt public-private partnership (PPP) as a major strategy for procuring infrastructure for decades. However, failures have occurred although the market has been considered to be a mature and sophisticated one. Failures have typically been traced back to inappropriate economic evaluation and a lack of value-for-money. In particular, a literature review has identified that there was no holistic consideration on the evaluation of procurement transactions of PPP projects. The transaction costs of PPPs were not handled properly. In this paper, theories of transaction cost economics are proposed for the purpose of such a holistic institutional economic evaluation. These theories are analysed in order to identify potential critical success factors for a strategic infrastructure procurement framework. The potential critical success factors are identified and grouped into a number of categories that match the theories of transaction cost economics. These categories include (1) Asset Specificity, (2) Organizational Capability, (3) Transaction Frequency, (4) Behavioural Uncertainty, and (5) Environmental Uncertainty. These potential critical success factors may be subject to an empirical test in the future. The proposed framework will offer decision makers with an insight into project life cycle economic outcomes needed to successfully deliver PPPs.

  • PDF

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

A Preliminary Study on Public Private Partnership in International Forestry Sector to Climate Change Based on Awareness Analysis of Private Enterprises (민간 기업의 인식조사를 바탕으로 한 기후변화 대응 국제산림분야 민관파트너십 사업 활성화 방안 기초 연구)

  • Kim, Jiyeon;Yoon, Taekyung;Han, Saerom;Park, Chanwoo;Lee, Suekyung;Kim, Sohee;Lee, Eunae;Son, Yowhan
    • Journal of Climate Change Research
    • /
    • v.3 no.4
    • /
    • pp.281-291
    • /
    • 2012
  • Forests act as carbon sinks and also improve water resources and biodiversity to climate change. Secure funding, administrative support, and sustainable management systems are essential to conserve forests and to implement international forestry related projects to climate change. Public private partnership (PPP) could be an effective way for forestry sector in developing countries. Awareness analysis should be preceded in order to encourage participation of enterprises for the diversification of funding and the enhancing quality of projects. We conducted a survey targeting more than 129 private enterprises for awareness analysis. As a result, lack of information, complexity of processes and low profit resulted in low interest on forest projects from private enterprises. Improving awareness of recipient countries on forest resources, financial and institutional supports from the public sector, information sharing, performance management and equal partnership between sectors were suggested to encourage PPP in international forestry related projects to climate change.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

Analyzing Characteristics of the Smart City Governance (스마트시티 거버넌스 특성 분석)

  • LEE, Sang-Ho;LEEM, Youn-Taik
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.2
    • /
    • pp.86-97
    • /
    • 2016
  • This study aims to analyze the characteristics of the smart city governance through the multi-layer governance model, which includes administrative governance(AG), technological governance(TG), and global governance(GG). The results of the smart city governance are as follows. Multi-layered governance was modeled to enable cross-checking of each element of the propelling process and types of governance. AG has transitioned from a public partnership to a public-private people partnership(pppp) through a public-private partnership(ppp). TG has the characteristics of information communication technologies(ICTs) - eco technologies(EcoTs) - Spatial technology convergence including physical center, information software platforms such as the CCTV convergence center, and virtualization such as the cloud data center. GG aims at developing killer applications and ICTs-embedded space with intelligent buildings such as a smart city special zone to enable overseas exports. The smart city roadshow and forum have been developed as a platform for overseas exports with competition as well as cooperation.

Decision Support Model for Determining Public or Private Highway Investment Projects (고속도로 건설사업의 재정/민자 발주선택 의사결정 지원모델)

  • Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.381-389
    • /
    • 2009
  • Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.

Analysis of the Effects of a Health Policy Capacity Development Education Program as a Public-Private Partnership Model in Official Development Assistance for Health Policy Administrators (공적개발원조와 민관협력 사업에서의 보건정책 역량강화 교육 프로그램 효과 분석)

  • Lee, Sang Hun;Park, Kyung Min;Lee, Eunsuk
    • Korean Journal of Occupational Health Nursing
    • /
    • v.29 no.2
    • /
    • pp.140-149
    • /
    • 2020
  • Purpose: This study analyzed the effects of a health policy capacity development education program as a publicprivate partnership (PPP) model in official development assistance (ODA) for health policy administrators. Methods: Between October 2015 and September 2017, 41 participants from underdeveloped countries completed the three-week education program at K university, following the official selection process of the Korea International Cooperation Agency (KOICA) and each country's embassy. Results: The effects of the health policy capacity development education program differed significantly according to participants' age (p=.043), country region (p=.045), and academic or professional degree (p=.007). Academic or professional degree significantly predicted the effects of the program (β=.41, p=.007), explaining 21.7% of the variance in the regression model. Conclusion: The current selection process for ODA program participants considers recommendations from each country's embassy to determine eligible candidates. The hosting institution's opinions or suggestions regarding participants' professional expertise or work experience, country region, or demographic characteristics should also be considered in the participant selection process.

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

5G 코어망 기술: 소프트웨어와 콘텐트 지향 관점

  • Kim, Cheol-Hun;Lee, Seong-Won
    • Information and Communications Magazine
    • /
    • v.31 no.6
    • /
    • pp.39-45
    • /
    • 2014
  • 최근 발표된 5G PPP(Public-Private Partnership) 에서도 나타나듯이, 차세대 네트워크의 변화는 소프트웨어와 IT분야에서 발전된 기술이 Telco 사업자의 네트워크로 전이되는 현상을 보여주고 있다. 특히 망의 중립성에 대해서도 "추가적인 망 투자를 수행한 콘텐트 제공업자의 콘텐트를 차별적으로 지원하는 것은 정당하다"는 개념도 확산되면서, 콘텐트를 인식하고 차별화된 서비스를 네트워크에서 제공하는 것이 수익 증가의 수단으로 부각되고 있는 상황이다. 이에 본고에서는 5G 코어망 기술의 발전을 소프트웨어와 콘텐트 지향적인 관점에서 알아본다.