• Title/Summary/Keyword: PMS(Pavement Management System)

Search Result 41, Processing Time 0.021 seconds

A Study on Development of Pavement Management System for Cement Concrete Pavement (시멘트콘크리트포장의 유지관리체계(PMS)에 관한 연구)

  • 엄주용;김남호;임승욱
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.04a
    • /
    • pp.363-369
    • /
    • 1996
  • PMS(Pavement Management System) is the effective and efficient decision making system to provide pavements in an acceptable condition at the lowest life-cycle cost. As the highway system become larger, the necessity of the PMS in increasing. As of December 1995, the 3rd stage of PMS project was completed. The accomplishment of the research work can be itemized to the followings : $\bullet$ Calibration of PMS submodules (1) Pavement Condition Evaluation Model (2) Pavement Distress Prediction Model (3) Pavement Performance Prediction Mode (4) Selection of Pavement Rehabilitation Criteria (5) Optimization Technique for PMS Economic Analysis $\bullet$ Development of Computer Program to Implement PMS Logic $\bullet$ A Study to Implement the Automized Pavement Condition Survey Equipment to PMS $\bullet$ PMS Test Run $\bullet$ Development of PMS Operation Guideline $\bullet$ The 2nd Pavement Condition Survey for Long-Term Pavement Performance Monitoring.

  • PDF

The Program Development for Building Pavement Maintenance and Rehabilitation System (포장도로 유지관리 시스템 구축을 위한 프로그램 개발)

  • 조병완;태기호;한재호;최혜미;권병철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1009-1014
    • /
    • 2002
  • In this study, developed economical and scientific Pavement Management System(PMS) that can produce suitable maintenance method through judgement and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First, on the basis of data of the inside and outside of the country on PMS, composed logical algorithm such as pavement condition investigation and analysis, detailed naked eye investigation, whole system estimation etc., and it verified that this algorithm is suitable system through the inside and outside of the country PMS research examples and results of detailed naked eye investigation. Also, developed easily usable PMS program and PMS_GIS program with such logical algorithm.

  • PDF

The Study on PMS System Development for Effective Asphalt Pavement Maintenance & Rehabilitation (아스팔트포장 도로의 유지관리체계 개선에 관한 연구)

  • Jo, Byung-Wan;Han, Sang-Joo
    • International Journal of Highway Engineering
    • /
    • v.5 no.1 s.15
    • /
    • pp.19-34
    • /
    • 2003
  • In this study, developed economic and efficient Pavement Management System (PMS) that can produce suitable M/R method through estimation and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First on the basis of data of the inside and outside of the country on PMS and pavement condition data of Seoul metropolitan, composed logical algorithm such as pavement condition investigation and analysis, detailed eye investigation whole system estimation etc, and it verified that this algorithm is suitable system through the inside and outside of the county PMS research examples and results of detailed eye investigation. Also, Considering user interface, developed PMS program and GIS program with such logical algorithm.

  • PDF

The Study on PMS Development for Effective Asphalt Pavement Maintenance and Rehabilitation (서울시 포장도로 유지관리체계(PMS) 개선에 관한 연구)

  • Tae Ghi Ho;Jo Byung Wan;Lee Doo Hwa;Park Jong Hwa
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.432-437
    • /
    • 2004
  • In this study, Pavement Management System(PMS) was developed to overcome the unscientific pavement management limitations of the past. PMS program is economic, efficient and scientific. Also, it produces the best maintenance method through exact judgement and logical analysis of pavement condition. First of all, the logical algorithm, that is such as investigation and analysis of pavement, detailed naked eye investigation and the estimation for whole system etc., was composed on the basis of the domestic and the outside data on PMS and pavement condition data of Seoul metropolitan. And then it was verified that this algorithm is suitable through the research examples of PMS data and the results of detailed naked eye investigation. Also, Geographic Information System(GIS) was integrated on PMS program. Therefore, PMS program was developed so as to use easily on the basis of the logical algorithm.

  • PDF

Performance Estimation and Maintenance Method for Road Pavement Sections (국도 포장의 장기 공용성 추정 및 유지관리 방안)

  • Lee, Young-Uk;Do, Myung-Sik;Lee, Jong-Dal;Jang, Min-Keun
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.125-129
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) application is presented to control the LCC(Life Cycle Cost) of road pavement. The aim of this paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Optimization of Municipal Pavement Management System(PMS) Components (Development of a Prototype PMS for Ansan City) (시도로 포장관리체계(PMS) 구성요소 최적화 연구 (안산시 Prototype PMS 개발사례))

  • Park, Sang-Kyu;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.111-122
    • /
    • 2000
  • PMS(Pavement Management System) has been developed and/or operated for the freeway and national highway systems in Korea. There is, however, no municipal PMS that is necessary in many cities for efficient management of their roadways. In this study, a municipal Prototype PMS is developed. The Prototype PMS is designed to be operated on PC base. It uses GIS interface for user friendliness that applies color graphics, text and distress pictures to display pavement conditions and rehabilitation information for both current and historical situations. The computer program of the prototype PMS consists of four major functions(inquiry, analysis, data management, and print). Especially, prioritization and M&R(Maintenance and Rehabilitation) alternative selection procedure is designed to be flexible so that the users can modify the decision criteria whenever it is necessary. Database items of the Prototype PMS is carefully selected for the objectives and size of municipal PMS. Reference point method is basically used for the location referencing in the Database. The unit section consists of each loom segment of the road for effective management.

  • PDF

Methodology for Benefit Evaluation according to Maintenance Method and Timing of National Highway Pavement Section (국도포장 유지보수 공법 및 시기에 따른 편익산정 방안)

  • Do, Myungsik;Kwon, Soo Ahn;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.91-99
    • /
    • 2013
  • PURPOSES : This study aims at proposing the methodology for benefit evaluations in pavement maintenance methods and timings using KoPMS(Korean Pavement Management System) software which was developed for efficient pavement management. METHODS : This study classified pavement sections into 4 clusters considering AADT(Annual Average Daily Traffic) and ESAL(Equivalent Single-Axle Load) using cluster analysis and used the deterioration models in each cluster. Increased user costs due to pavement deterioration as time goes by and agent costs for maintenance were estimated. Based on deterioration model and KoPMS software, Methodology for benefit evaluation was proposed in pavement maintenance methods and with/without implementation using real pavement section data. RESULTS : This study verified that considering agent costs only would be constrained to decide pavement maintenance methods and timings, and ascertained that decision making with agent and user costs would be effective. In addition, this study revealed that pavement maintenance methods and timings can be affected by AADT and ESAL and frequent pavement maintenances can be more efficient for benefits in pavement sections with more AADT and ESAL. Also this study found that user costs would be more affected to decision making than agent costs. Moreover, Delay of conducting pavement maintenance caused increased vehicle operating costs and environmental costs because of poor conditions of pavements. CONCLUSIONS : This study proposed LCCA and benefit estimation methodology of pavement with considering agent and user costs. The results of this study can be used for baseline data of efficient pavement asset management.

Estimation of Road Pavement Roughness using DGPS (DGPS 기법을 이용한 노면 평탄성 산정)

  • 이종출;하대환;서정훈;박규열
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.71-76
    • /
    • 2004
  • Development of industry is increased Traffic Volume and have brought increase of road. As a result, Maintenance-management expense of the whole road is rapidly increase. Operation of PMS (Pavement Management System) need that it is efficiently for maintenance-management the whole road network Into budget limited. PMS is effective management through Investigation of roughness, crack, plastic deformation, etc of road. Advanced nation recognizes necessity of maintenance-management of road, progress to investigation and research. Our country is lacking that systematic pms's application and research. Therefore, this research estimated using of surveying method of DGPS that roughness of road for investigation-step of PMS. At the future, this paper may contribute in research of automatic surveying system for road surface.

  • PDF

Development of the Decision-Making System for National Highway Pavement Management (국도 포장관리를 위한 의사결정시스템 개발)

  • Do, Myungsik;Kwon, Sooahn;Lee, Sang Hyuk;Kim, Yongjoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.645-654
    • /
    • 2014
  • PMS (Pavement Management System) of National highways in Korea has used HDM (Highway Development and Management)-4 developed by World Bank for decision-making for maintenance and rehabilitation of pavements. However using HDM-4 is not appropriate in Korea because HDM-4 requires excessive input factors for analysis and economic analysis models loaded in HDM-4 are not suitable for Korean circumstances. Thus this study aims development of decision-making system for effective pavement management with reflecting Korean circumstances. Moreover this study proposed to define component of system, deterioration models, and basic units for component, and to analyze characteristics of component of system, and also to develop optimal decision-making system. The decision-making system for PMS mainly consists of 1) DB of highways, traffics, and socio-economic index, 2) pavement deterioration model, 3) speed prediction models by pavement conditions, 4) economic evaluation models, and 5) decision-making supporting system. Also this study provided analysis results in case studies for system verifications. However pavement deterioration models considering future probabilistic characteristic and index of decision-making are needed to develop for a further study.