• Title/Summary/Keyword: PERT

Search Result 123, Processing Time 0.031 seconds

Effect of $\alpha$-cellulose content in pulps on esterification of cellulose (펄프에 함유된 $\alpha$-셀룰로오스의 함량이 셀룰로오스의 에스테르화반응에 미치는 영향)

  • Lee, Soo;Park, Sang-Hee;Kim, Jin-Woo
    • Journal of the Korean Applied Science and Technology
    • /
    • v.26 no.4
    • /
    • pp.428-433
    • /
    • 2009
  • Cellulose triacetate (CTA) was prepared from cotton linter and pulps which contain various contents of $\alpha$-cellulose. CTA which contains 2.8 of degree of substitution (DS) and 222 of degree of polymerization (DP) was obtained from V-81 pulp under the heterogeneous system. The DS was measured by the titration method, and the DP was obtained by measurement of viscosity. FT-IR spectometer (FT-IR 6300, JASCO) was used to analyze the chemical structure of raw materials and cellulose triacetate, and X-ray diffractometer (X-pert MPD PW3040, Philips) was used to confirm the crystal structure and to calculate the relative crystallinity index (RCI). As $\alpha$-cellulose content in pulp increased, the acetylation yield increased. Besides with a kind of pulp, it contains insoluble residue which was mainly formed due to the formation of glucomannan triacetate and xylan diacetate during the esterification.

Optimization of the Phosphorus Doped BSF Doping Profile and Formation Method for N-type Bifacial Solar Cells

  • Cui, Jian;Ahn, Shihyun;Balaji, Nagarajan;Park, Cheolmin;Yi, Junsin
    • Current Photovoltaic Research
    • /
    • v.4 no.2
    • /
    • pp.31-41
    • /
    • 2016
  • n-type PERT (passivated emitter, rear totally diffused) bifacial solar cells with boron and phosphorus diffusion as p+ emitter and n+ BSF (back surface field) have attracted significant research interest recently. In this work, the influences of wafer thickness, bulk lifetime, emitter, BSF on the photovoltaic characteristics of solar cells are discussed. The performance of the solar cell is determined by using one-dimensional solar cell simulation software PC1D. The simulation results show that the key role of the BSF is to decrease the surface doping concentration reducing the recombination and thus, increasing the cell efficiency. A lightly phosphorus doped BSF (LD BSF) was experimentally optimized to get low surface dopant concentration for n type bifacial solar cells. Pre-oxidation combined with a multi-plateau drive-in, using limited source diffusion was carried out before pre-deposition. It could reduce the surface dopant concentration with minimal impact on the sheet resistance.

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

On Study of Setting up Plan and Utilization of Project with Project Tool (프로젝트 툴을 이용한 일정 계획의 수립 및 활용 방안)

  • Kim Gil-Choon
    • Journal of Digital Contents Society
    • /
    • v.5 no.2
    • /
    • pp.106-113
    • /
    • 2004
  • Once the objective of project is set up to alter the present situation to acertain future situation necessary measures need to be taken to accomplish it. In the past, making a plan and transformation was done in the form of handwork, but this article addresses analyzing and handing the project data by using a tool of Microsoft Office System and then by making a reasonable plan. This system also helps transform project data into Excel data and analyze it using Excel, and transform project data into xml data and construct xml database so that it makes it possible to handle and use data efficiently, and to set up automatic project system in the future which leads to efficient project management.

  • PDF

Hand Assessment for Women's Spring-Fall Dress Fabrics(Part 1) - Development for the Subjective Hand Evaluation Scale - (여성용 춘추복지의 태에 관한 연구(제1보) -태의 주관적 평가척도 개발을 중심으로-)

  • 홍경희;김재숙
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.18 no.3
    • /
    • pp.327-338
    • /
    • 1994
  • KES-F system is widely used in hand evaluation, however, it has encountered some challenges, such as the overlapping of primary hand value, lack of predictability in case of women's thin dress, difficulties in communication due to complexity of primary hand expression and cultural differences in subjective evaluation. Therefore, this study was intended 1) to find out the Korean primary hand expressions(factors) of the overall concept of fabric hand associated with women's spring- fall dress fabrics, 2) to develope the fabric hand attributes of those fabrics and 3) to show whether there are any differences between Korean textile experts and non-experts in terms of the concept of fabric hand descriptors of hand attributes. Data base of hand descriptors were collected by extensive interview 60 experts and 10 non - experts using 110 spring-fall dress fabrics. Finally, hand of selected fabrics was assessed by 205 experts and 265 non-experts using 7-point scale of 26 descriptors based on the data base. Subjective ratings were analyzed by common factor analysis with varimax rotation. It was found that Korean primary hand expression indicated rather simple property, hence, did not equate exactly with Japanese experssion(e.g. koshi, shinayakasa, etc.) which contains several material properties. There were differences in stretch IE resilience, especially liveliness, between the judgement of non- ex- pert than to experts. Surface- related category was more important to non-experts than to experts. Slight differences were found between both groups in terms of preferred descriptors. Important descriptors as a rating scale were suggested.

  • PDF

Comparison of Halloysitum Rubrum before and after Physical and Chemical Manipulation (적석지(赤石脂)의 포제전후의 성분 비교연구)

  • Kook, Yoon-Bum
    • The Korea Journal of Herbology
    • /
    • v.20 no.2
    • /
    • pp.17-26
    • /
    • 2005
  • Objectives : The study has been undertaken to scrutinize the results of Halloysitum Rubrum before and after physical and chemical manipulation. Methods : I used X-rays diffracted analysis system(Phillips X'Pert - MPD System) on condition of 40Kv, Anode of Cu Ka to grasp the compositions of crude Halloysitum Rubrums which have been from here and there after pulverization them below 200 mesh. X-rays fluorescence analysis system have been used to check the chief elements content of the ore on condition of 40Kv, 95mA. ICP-MS analysis system(Perkin Elmer, Elan 6100)have been used after a micro-elements and a heavy metals take advantage of mixed acid were dissolved completely. Results : The compositions of the ore Halloysitum Rubrum are composed of large amount of Halloysite and Kaolinite, and small amount of Hematite, Alum, quartzite. The chief elements content of the ore Halloysitum Rubrum are composed of Al and Si. A heavy metals in Halloysitum Rubrum are As, Cd, Cr, Cu, Pb, Zn, etc. As and Zn's amounts was lessen after physical and chemical manipulation Halloysitum Rubrum are decreased at $400^{\circ}C\;and\;450-500^{\circ}C$ each by heat analysis system. Conclusion : Results of this study show that Halloysitum Rubrum can be used in a diverse ways to treat many kinds of disease.

  • PDF

A Genetic Algorithm Application for the Load Balancing of Ship Erection Process (조선 탑재일정의 부하 평준화를 위한 유전 알고리듬)

  • Min, Sang-Gyu;Moon, Chi-Ung;Lee, Min-Woo;Chung, Kuy-Hoon;Park, Ju-Chull
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.225-233
    • /
    • 2000
  • In this paper, we develope a genetic algorithm for the erection scheduling in shipbuilding. Erection, the final manufacturing stage of shipbuilding, involves the landing and joining of blocks at drydock. Since several ships are built simultaneously at the same drydock and they compete with the common constrained production resource such as labor, space, and crane, we should consider both ship-specifics and common resource constraints for the desirable erection scheduling. Ship erection should also satisfy the predetermined dock cycle given from higher level production planning. Thus, erection schedule of a ship can be represented as a PERT/CPM project network with its own deadline. Since production resources are shared, the erection scheduling become the so-called multi-project scheduling problem with limited resources, which can not be solved easily due to the large size of project network. We propose a function as a minimization of load index which represented the load deviation over time horizon considering the yard production strategy. For the optical parameter setting, we tried various experiments. We verified that the proposed approach was effective to deal with the erection scheduling problem in shipbuilding.

  • PDF

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

Determination of sample size to serological surveillance plan for pullorum disease and fowl typhoid (추백리-가금티푸스의 혈청학적 모니터링 계획수립을 위한 표본크기)

  • Pak, Son-Il;Park, Choi-Kyu
    • Korean Journal of Veterinary Research
    • /
    • v.48 no.4
    • /
    • pp.457-462
    • /
    • 2008
  • The objective of this study was to determine appropriate sample size that simulated different assumptions for diagnostic test characteristics and true prevalences when designing serological surveillance plan for pullorum disease and fowl typhoid in domestic poultry production. The number of flocks and total number of chickens to be sampled was obtained to provide 95% confidence of detecting at least one infected flock, taking imperfect diagnostic tests into account. Due to lack of reliable data, within infected flock prevalence (WFP) was assumed to follow minimum 1%, most likely 5% and maximum 9% and true flock prevalence of 0.1%, 0.5% and 1% in order. Sensitivity were modeled using the Pert distribution: minimum 75%, most likely 80% and maximum 90% for plate agglutination test and 80%, 85%, and 90% for ELISA test. Similarly, the specificity was modeled 85%, 90%, 95% for plate agglutination test and 90%, 95%, 99% for ELISA test. In accordance with the current regulation, flock-level test characteristics calculated assuming that 30 samples are taken from per flock. The model showed that the current 112,000 annual number of testing plan which is based on random selection of flocks is far beyond the sample size estimated in this study. The sample size was further reduced with increased sensitivity and specificity of the test and decreased WFP. The effect of increasing samples per flock on total sample size to be sampled and optimal combination of sensitivity and specificity of the test for the purpose of the surveillance is discussed regarding cost.

Feasibility Study on the Duration of Shiwha Techno-Valley through Simulation (시뮬레이션을 이용한 시화 테크노 벨리 공기 적정성 검토연구)

  • Kim Kyong-Ju;Kim Byeong-Soo;Chun Jin-Ku;Lee Jeong-Hun;Yun Won-Gun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-499
    • /
    • 2003
  • As an alternative to overcome the limitations of current popular schedule system such as Bar Chart, PERT, CPM in proving the feasibility of a given project schedule and duration, this research applies simulation to the 'Shiwha Techno-Valley project, and then reviews its usability in time management. Shiwha-Techno-Valley is a gigantic project requiring large number of equipment and resulting in traffic congestion. In particular, project site is located near the Shiwha industrial complex and Daeboo-Do tourist place. Therefore, current traffic needs should not be ignored. This research evaluates whether the project can be finished in a given time even if construction equipment increase in addition to the current traffic. Through the analysis of the simulation output, the research identifies the optimal resource input and the needs on alternative schedule for the project.

  • PDF