• 제목/요약/키워드: PC member erection

검색결과 8건 처리시간 0.023초

보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘 (Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building )

  • 김기호;이범식;김진원;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구 (A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building)

  • 임지영;오진혁;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.77-78
    • /
    • 2023
  • As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer's experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

  • PDF

초대형 건축물의 PC부재 양중작업 사례연구 (Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure)

  • 조원현;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

공동주택의 PC계단실 조립 프로세스 분석 (Erection Process Analysis of the PC Staircase in the Apartment Building )

  • 김기호;이범식;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.103-104
    • /
    • 2023
  • The purpose of this study is to specify an erection process for each member of the PC staircase. For this purpose, field work was investigated at the LH PC apartment building site and classified in detail through unit work analysis inspection. The results of this study are intended to be used as basic data for creating work sequences and related guidelines for LH's PC staircase.

  • PDF

PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구 (A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members)

  • 손승현;김기호;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF

SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 - (Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings)

  • 김도영;지우민;임지영
    • 한국건축시공학회지
    • /
    • 제22권5호
    • /
    • pp.519-530
    • /
    • 2022
  • 인터넷 상거래가 증가함에 따라 전세계적으로 대형 물류 건물의 건설이 증가하고 있다. 이들 건축물은 대부분 장경간중재하의 특성을 가지고 있으며 빠른 시공을 위해 핀조인트 구조인 PC 공법을 적용한다. 그러나 핀조인트 구조는 시공 안전성 및 구조적 안정성으로 인해 PC 부재의 설치에 많은 제약이 있어 시간과 비용이 많이 소요된다. 이러한 제약과 문제점을 해결하기 위해 PC 부재 사이의 철골 조인트로 연결된 구조 프레임인 SMART frame이 개발되었다. SMART frame에 대한 많은 연구가 진행되었으나 공기 측면에 대한 영향은 분석되지 않았다. 본 연구의 목적은 장경간 중재하 물류창고시설에 대한 SMART frame의 공기단축 효과를 분석하는 것이다. 본 연구를 위해 기존 PC 공법에 의해 건설된 사례현장을 선정하여 SMART frame 설치 시뮬레이션과 시간 단축을 비교하였다. 그 결과, 기존 PC설치공기의 약48%의 수준으로 약 4개월이 단축 되었다. 추후 대형물류센터 프로젝트 진행 시 SMART frame을 적용한다면 기존 PC공법 대비 획기적인 공기단축의 효과를 가질 것으로 기대된다.

PC부재에 의한 물류시설의 골조공사 개선사례 연구 (A Case Study of the Improvement of the Structural Work of a Logistics Facility by Using PC Member)

  • 김선형;최은규;김선국;이성호
    • 한국건축시공학회지
    • /
    • 제10권6호
    • /
    • pp.127-135
    • /
    • 2010
  • 물류시설은 층고가 높고 구조가 단순하며, 투자회수를 위한 조속한 운영이 필요하기 때문에 공기단축이 절실한 특징이 있다. 이에 따라 인력 및 원가절감, 공기단축을 기대할 수 있는 PC공법의 사용은 RC조에 비해 경쟁력을 확보할 수 있다. 그러나 국내의 시공사들은 RC공법에 익숙해져 있어, PC공법에 대한 부정적 인식이 팽배하며, 새로운 공법적용에 대한 노력이 미흡한 문제점이 있다. 본 연구의 사례현장은 단위기둥의 높이가 14m로 동일한 규격의 장주(長柱)가 110본 소요되는 현장으로 RC공법을 이용할 경우 시공성, 경제성, 공사기간, 안전성등의 문제발생이 예상된다. 따라서 본 연구는 RC조로 계획된 물류창고 현장을 PC공법으로 시공하여 인력 및 원가절감, 공기단축효과를 비교분석하고, 개선효과를 제시하는데 목적을 두고 있다. 향후 본 연구의 결과물은 물류시설 시공 시공기단축, 품질 및 시공성 향상, 안전성향상, 원가절감효과를 가져올 신공법개발 연구의 기초자료로 사용될 것으로 사료된다.

PC 박스거더교량의 시공단계별 비선형 해석 및 후처리 기법 (Nonlinear Analysis of the Segmentally Erected Prestressed Concrete Box-Girder Bridges and Post-Processing)

  • 오병환;강영진;이형준;이명규;홍기증;김영진;임선택
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1994년도 가을 학술발표회 논문집
    • /
    • pp.368-373
    • /
    • 1994
  • Recently, a large number of box girder bridges with cantilevered decks have been constructed. Especially, segmentally erected prestressed concrete box girder bridges are widely used as economic and aesthetic solutions for long span bridges. Segmental erection is a particularly attractive construction alternative in cases where continuously supported formwork is impractical or uneconomical. In segmentally erected bridges, the structural systems are changed as the construction stages are progressive and redistribution of member forces occurs due to time dependent effects of concrete and relaxation of prestressing steel. Then, in segmentally erected bridges, analysis are required at each construction states. In this study, nonlinear analysis progam of the segmentally erected prestressed concrete box girder bridges is developed in taking into account nonlinearity of material and geometry, time dependent effect of concrete and relaxation of prestressing steel.

  • PDF