• Title/Summary/Keyword: PC Project

Search Result 147, Processing Time 0.028 seconds

External Factors Influencing Bid/No-Bid Decision for Supervision Consultant Service: A Case of Construction Project in Hanoi

  • HA, Son Tung;TRAN, Manh Linh;HOANG, Huy Viet;TRAN, Van Hung
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.6
    • /
    • pp.417-425
    • /
    • 2020
  • This paper investigates the potential impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the capital of Vietnam. The data used in this study are secondary data taken from annual reports and sourced from the Department of Public Procurement, Ministry of Planning and Investment in Hanoi. Besides, to identify the impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the study collected data from 272 qualified questionnaires from bidders doing business in Hanoi. Cronbach's Alpha, EFA and regression model are used to explore the impact of each independent variable on bid/no-bid decision for supervision consultant service on construction project. The results show that three external determinants, including Project characteristic (PC), Legal codes (LC) and Competition (C) are affecting bid/no-bid decision for supervision consultant service on construction project in Hanoi. Among them, Project characteristic (PC) and Legal codes (LC) have positive relationships with bid/no-bid decision for supervision consultant service on construction project, whereas Competition (C) negatively affects bid/no-bid decision for supervision consultant service on construction project. It means the more contractors actually participate in a bid, the less bid/ no-bid decisions are made.

Proteomic Analysis of Rat PC12 Cells Exposed to Cyclosporin A

  • Jung, Ji-Yeon;Seol, Kwang;Jeong, Yeon-Jin;Kim, Won-Jae;Oh, Sang-Jin
    • International Journal of Oral Biology
    • /
    • v.34 no.1
    • /
    • pp.29-36
    • /
    • 2009
  • Cyclosporin A (CsA) has been used clinically as an immunosuppressive drug to prevent organ transplant rejection and in basic research as a mitochondrial permeability blocker. It has been reported that CsA has a protective role in severed neurons and a neurotrophic effect in neuronal cells. However, the molecular mechanisms underlying the stimulation of neuronal cell proliferation by CsA have not yet been elucidated. In our current study, we investigated CsA responsive proteins in PC12 cells using a systematic proteomic approach. The viability of these cells following CsA treatment increased in a dose- and time-dependent manner. Proteins in the CsA-treated PC12 cells were profiled by two-dimensional gel electrophoresis (2-DE) and identified by matrix-assisted laser desorption ionization time-of flight (MALDI-TOF) and electrospray ionization quadupole time-of-flight mass spectrometries (EIQ-TOFMS). This differential expression analysis showed significant changes for 10 proteins (6 up-regulated and 4 down-regulated) upon CsA treatment that were related to cell proliferation, metabolism and the stress response. These proteomics data further our understanding of the proliferation mechanisms of PC12 cells exposed to CsA and demonstrate that our methodology has potential to further elucidate the mechanisms and pathways involved.

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning (IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석)

  • Jang, JunYoung;Cho, Kyeong Woon;Koo, Choongwan;Lee, Chansik;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.53-62
    • /
    • 2021
  • PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.

Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building (보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Lee, Dong-Gun;Kim, MIn-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Global Prostate Cancer Incidence and Mortality Rates According to the Human Development Index

  • Khazaei, Salman;Rezaeian, Shahab;Ayubi, Erfan;Gholamaliee, Behzad;Pishkuhi, Mahin Ahmadi;Khazaei, Somayeh;Mansori, Kamyar;Nematollahi, Shahrzad;Sani, Mohadeseh;Hanis, Shiva Mansouri
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.8
    • /
    • pp.3793-3796
    • /
    • 2016
  • Background: Prostate cancer (PC) is one of the leading causes of death, especially in developed countries. The human development index (HDI) and its dimensions seem correlated with incidence and mortality rates of PC. This study aimed to assess the association of the specific components of HDI (life expectancy at birth, education, gross national income per 1000 capita, health, and living standards) with burden indicators of PC worldwide. Materials and Methods: Information of the incidence and mortality rates of PC was obtained from the GLOBOCAN cancer project in year 2012 and data about the HDI 2013 were obtained from the World Bank database. The correlation between incidence, mortality rates, and the HDI parameters were assessed using STATA software. Results: A significant inequality of PC incidence rates was observed according to concentration indexes=0.25 with 95% CI (0.22, 0.34) and a negative mortality concentration index of -0.04 with 95% CI (-0.09, 0.01) was observed. Conclusions: A positive significant correlation was detected between the incidence rates of PC and the HDI and its dimensions including life expectancy at birth, education, income, urbanization level and obesity. However, there was a negative significant correlation between the standardized mortality rates and the life expectancy, income and HDI.

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings (PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Kim, Yeon-Ho;Lee, Dong-Gun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project (공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석)

  • Lee, Hyun-Seok;Lee, Sang-Hyo;An, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.670-673
    • /
    • 2007
  • In Korea, it has recently occurred that problems of productivity and construction duration in the construction industry. If five days per week system come into effect, they'll become more urgent. The productivity of construction industry and competitive construction duration in Korea are too low. If post sale system becomes effective, construction companies will strive to improve productivity. Therefore, the objective of this study is to draw up Architectural PC as the alternative for productivity improving and analyze possibility of productivity improving by comparing with established method of construction.

  • PDF

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF