• 제목/요약/키워드: PC Project

검색결과 147건 처리시간 0.029초

External Factors Influencing Bid/No-Bid Decision for Supervision Consultant Service: A Case of Construction Project in Hanoi

  • HA, Son Tung;TRAN, Manh Linh;HOANG, Huy Viet;TRAN, Van Hung
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권6호
    • /
    • pp.417-425
    • /
    • 2020
  • This paper investigates the potential impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the capital of Vietnam. The data used in this study are secondary data taken from annual reports and sourced from the Department of Public Procurement, Ministry of Planning and Investment in Hanoi. Besides, to identify the impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the study collected data from 272 qualified questionnaires from bidders doing business in Hanoi. Cronbach's Alpha, EFA and regression model are used to explore the impact of each independent variable on bid/no-bid decision for supervision consultant service on construction project. The results show that three external determinants, including Project characteristic (PC), Legal codes (LC) and Competition (C) are affecting bid/no-bid decision for supervision consultant service on construction project in Hanoi. Among them, Project characteristic (PC) and Legal codes (LC) have positive relationships with bid/no-bid decision for supervision consultant service on construction project, whereas Competition (C) negatively affects bid/no-bid decision for supervision consultant service on construction project. It means the more contractors actually participate in a bid, the less bid/ no-bid decisions are made.

Proteomic Analysis of Rat PC12 Cells Exposed to Cyclosporin A

  • Jung, Ji-Yeon;Seol, Kwang;Jeong, Yeon-Jin;Kim, Won-Jae;Oh, Sang-Jin
    • International Journal of Oral Biology
    • /
    • 제34권1호
    • /
    • pp.29-36
    • /
    • 2009
  • Cyclosporin A (CsA) has been used clinically as an immunosuppressive drug to prevent organ transplant rejection and in basic research as a mitochondrial permeability blocker. It has been reported that CsA has a protective role in severed neurons and a neurotrophic effect in neuronal cells. However, the molecular mechanisms underlying the stimulation of neuronal cell proliferation by CsA have not yet been elucidated. In our current study, we investigated CsA responsive proteins in PC12 cells using a systematic proteomic approach. The viability of these cells following CsA treatment increased in a dose- and time-dependent manner. Proteins in the CsA-treated PC12 cells were profiled by two-dimensional gel electrophoresis (2-DE) and identified by matrix-assisted laser desorption ionization time-of flight (MALDI-TOF) and electrospray ionization quadupole time-of-flight mass spectrometries (EIQ-TOFMS). This differential expression analysis showed significant changes for 10 proteins (6 up-regulated and 4 down-regulated) upon CsA treatment that were related to cell proliferation, metabolism and the stress response. These proteomics data further our understanding of the proliferation mechanisms of PC12 cells exposed to CsA and demonstrate that our methodology has potential to further elucidate the mechanisms and pathways involved.

IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석 (Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning)

  • 장준영;조경운;구충완;이찬식;김태완
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.53-62
    • /
    • 2021
  • PC 부재 할당, 적재 계획은 차량적재 공간의 활용률을 높임으로써 차량에서 발생하는 이산화탄소 배출과 에너지 사용을 줄일 수 있으며, 또한 전체 프로젝트 비용을 절감할 수 있다. 이 연구는 PC 공사 공장관리자와 현장관리자를 대상으로 PC 부재를 차량에 할당 및 적재 계획을 수립하는 데 도움을 줄 수 있는 고려사항 18개를 도출하였으며, 도출한 18개 고려사항을 활용하여 IPA분석을 수행하였다. 주요결과, PC 부재 할당계획 시 "PC 부재 운반 차량 대수", "건설현장 내의 야적장 유무" 항목에 관한 고려사항 개선이 필요한 것을 파악하였다. 또한, PC 부재 적재계획에서는 "PC 부재 방향" 항목에 관한 고려사항 개선이 필요한 것으로 나타났다. 최근 들어 다양한 PC 부재 유형의 생산으로 인해 차량에 PC 부재를 안정적으로 적재하기 어려워 PC 부재 적재계획에서 비효율적인 차량 공간 사용, 불안한 적재 형태 등의 많은 문제가 발생하고 있다. 이 연구결과를 생산관리자가 부재 할당 및 적재 계획에 반영한다면 효율적인 차량 관리로 인해 경제적인 계획을 수립할 수 있을 것으로 판단된다.

보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘 (Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building )

  • 김기호;이범식;김진원;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Global Prostate Cancer Incidence and Mortality Rates According to the Human Development Index

  • Khazaei, Salman;Rezaeian, Shahab;Ayubi, Erfan;Gholamaliee, Behzad;Pishkuhi, Mahin Ahmadi;Khazaei, Somayeh;Mansori, Kamyar;Nematollahi, Shahrzad;Sani, Mohadeseh;Hanis, Shiva Mansouri
    • Asian Pacific Journal of Cancer Prevention
    • /
    • 제17권8호
    • /
    • pp.3793-3796
    • /
    • 2016
  • Background: Prostate cancer (PC) is one of the leading causes of death, especially in developed countries. The human development index (HDI) and its dimensions seem correlated with incidence and mortality rates of PC. This study aimed to assess the association of the specific components of HDI (life expectancy at birth, education, gross national income per 1000 capita, health, and living standards) with burden indicators of PC worldwide. Materials and Methods: Information of the incidence and mortality rates of PC was obtained from the GLOBOCAN cancer project in year 2012 and data about the HDI 2013 were obtained from the World Bank database. The correlation between incidence, mortality rates, and the HDI parameters were assessed using STATA software. Results: A significant inequality of PC incidence rates was observed according to concentration indexes=0.25 with 95% CI (0.22, 0.34) and a negative mortality concentration index of -0.04 with 95% CI (-0.09, 0.01) was observed. Conclusions: A positive significant correlation was detected between the incidence rates of PC and the HDI and its dimensions including life expectancy at birth, education, income, urbanization level and obesity. However, there was a negative significant correlation between the standardized mortality rates and the life expectancy, income and HDI.

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교 (Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings )

  • 김기호;이범식;김진원;김연호;이동건;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석 (Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project)

  • 이현석;이상효;안병주;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.670-673
    • /
    • 2007
  • 최근 국내 건설 산업에서 생산성과 건설공기 측면에서 문제점이 드러나고 있으며 또한, 국내 건설 산업의 생산성과 공기 경쟁력이 선진국에 비해 매우 낮은 것으로 분석되었다. 여기에 주5일 근무제가 시행된다면 문제는 더 심각해진다. 또한, 현재 입법 예고된 후분양제도가 실행된다면 건설사 입장에서는 공기 단축을 위한 생산성 향상이 건설업의 생사가 달린 일이다. 이에 본 연구에서는 생산성 향상을 위한 방안으로 PC의 한 종류인 건축 외관용 PC를 제시하고, 건축 외관용 PC를 사용하는 방안을 기존의 공법과 비교를 통해 생산성이 향상 되는가를 분석하고자 한다.

  • PDF

타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석 (Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane)

  • 김기호;이범식;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF