• Title/Summary/Keyword: Owner Risk

Search Result 97, Processing Time 0.067 seconds

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.11
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

A Study on How to Cope with the Abusive Call on On-demand Bonds (독립적 보증과 그 부당한 청구에 대한 대응방안 연구)

  • KIM, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.261-301
    • /
    • 2016
  • Recently the abusive calls on on-demand bonds have been a critical issue among many engineering and construction companies in Korea. On-demand bond is referred to as an independent guarantee in the sense that the guarantee is independent from its underlying contract although it was issued based on such underlying contract. For this reason, the issuing bank is not required to and/or entitled to look into whether there really is a breach of underlying contract in relation to the call on demand-bonds. Due to this kind of principle of independence, the applicant has to run the risk of the on demand bond being called by the beneficiary without due grounds. Only where the call proves to be fraudulent or abusive in a very clear way, the issuing bank would not be obligated to pay the bond proceeds for the call on on-demand bonds. In order to prevent the issuing bank from paying the proceeds under the on-demand bond, the applicant usually files with its competent court an application for injunction prohibiting the beneficiary from calling against the issuing bank. However, it is in practice difficult for the applicant to prove the beneficiary's call on the bond to be fraudulent since the courts in almost all the jurisdictions of advanced countries require very strict and objective evidences such as the documents which were signed by the owner (beneficiary) or any other third party like the engineer. There is another way of preventing the beneficiary from calling on the bond, which is often utilized especially in the United Kingdom or Western European countries such as Germany. Based upon the underlying contract, the contractor which is at the same time the applicant of on-demand bond requests the court to order the owner (the beneficiary) not to call on the bond. In this case, there apparently seems to be no reason why the court should apply the strict fraud rule to determine whether to grant an injunction in that the underlying legal relationship was created based on a construction contract rather than a bond. However, in most jurisdictions except for United Kingdom and Singapore, the court also applies the strict fraud rule on the ground that the parties promised to make the on-demand bond issued under the construction contract. This kind of injunction is highly unlikely to be utilized on the international level because it is very difficult in normal situations to establish the international jurisdiction towards the beneficiary which will be usually located outside the jurisdiction of the relevant court. This kind of injunction ordering the owner not to call on the bond can be rendered by the arbitrator as well even though the arbitrator has no coercive power for the owner to follow it. Normally there would be no arbitral tribunal existing at the time of the bond being called. In this case, the emergency arbitrator which most of the international arbitration rules such as ICC, LCIA and SIAC, etc. adopt can be utilized. Finally, the contractor can block the issuing bank from paying the bond proceeds by way of a provisional attachment in case where it also has rights to claim some unpaid interim payments or damages. This is the preservative measure under civil law system, which the lawyers from common law system are not familiar with. As explained in this article, it is very difficult to block the issuing bank from paying in response to the bond call by the beneficiary even if the call has no valid ground under the underlying construction contract. Therefore, it is necessary for the applicants who are normally engineering and construction companies to be prudent to make on-demand bonds issued. They need to take into account the creditability of the project owner as well as trustworthiness of the judiciary system of the country where the owner is domiciled.

  • PDF

Centralized Machine Learning Versus Federated Averaging: A Comparison using MNIST Dataset

  • Peng, Sony;Yang, Yixuan;Mao, Makara;Park, Doo-Soon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.2
    • /
    • pp.742-756
    • /
    • 2022
  • A flood of information has occurred with the rise of the internet and digital devices in the fourth industrial revolution era. Every millisecond, massive amounts of structured and unstructured data are generated; smartphones, wearable devices, sensors, and self-driving cars are just a few examples of devices that currently generate massive amounts of data in our daily. Machine learning has been considered an approach to support and recognize patterns in data in many areas to provide a convenient way to other sectors, including the healthcare sector, government sector, banks, military sector, and more. However, the conventional machine learning model requires the data owner to upload their information to train the model in one central location to perform the model training. This classical model has caused data owners to worry about the risks of transferring private information because traditional machine learning is required to push their data to the cloud to process the model training. Furthermore, the training of machine learning and deep learning models requires massive computing resources. Thus, many researchers have jumped to a new model known as "Federated Learning". Federated learning is emerging to train Artificial Intelligence models over distributed clients, and it provides secure privacy information to the data owner. Hence, this paper implements Federated Averaging with a Deep Neural Network to classify the handwriting image and protect the sensitive data. Moreover, we compare the centralized machine learning model with federated averaging. The result shows the centralized machine learning model outperforms federated learning in terms of accuracy, but this classical model produces another risk, like privacy concern, due to the data being stored in the data center. The MNIST dataset was used in this experiment.

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

A Study on the Three Typical Approaching Aspects of Two Vessels at Sea and on Their Steering and Sailing Rules (해상에서 두 선박이 서로 만나는 세가지 전형적 양태와 그 항법에 관한 고찰 - 국제규칙을 중심으로 -)

  • 황석갑
    • Journal of the Korean Institute of Navigation
    • /
    • v.16 no.3
    • /
    • pp.1-17
    • /
    • 1992
  • Although there are numerous regulations provided for the Steering and Sailing Rules on the International Regulation forPreventing Collisions at Sea, 1972(hereinafter called COLREG), the most important Sailing Rules for approaching between two vessels in sight of one another could actually be defined as three typical aspects based on both the COLREG and practical sea experience. The Rules are overtaking , head-on situation and crossing situation applicable, those clearly prescribes on the COLREG. Thus, for easy understanding of these Rules comprehensive legal research is performed by every chapter in this paper so as to make practical implementation by duty officer of apprentice of shipping concerned. Consequently an aim of the study intends not only to exonerate any vessel, or the owner, master or crew there of, from consequences of well understanding and timely implementation to complying with the aforementioned three typical Steering and Sailing Rules which may be required by ordinary practice of seamen but also to avoid risk of collision at sea.

  • PDF

Quantifying the Value of Floats (작업여유시간의 가치 정량화 방법론)

  • Park, Young-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.123-124
    • /
    • 2015
  • The project participants make use of floats for their benefits. The owner may consume floats in an event of issuing change order(s) and may avoid the risk factors attributed by them; the contractor may reduce activities' costs by substituting the activity with alternative construction method and by leveling the resources, hence consuming floats. There are a lot of disputes and claims involved in the float ownership issue. The ownership of floats should be stipulated in the contract stage. To alleviate these disputes and claims, it is commendable to develop a computational method that quantifies the float value. This paper presents the method that computes the values of total floats which changes over the project life span. The system calculates CPM, compute the ratio of area of banana curve which is enclosed by earliest start curve and latest start-curve.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.