• 제목/요약/키워드: Overhead line

검색결과 455건 처리시간 0.037초

능동 판토그래프 제어기 설계에 관한 연구 (Design of Active Pantograph Controller)

  • 고태환;엄주환;엄기영;신승권
    • 한국철도학회논문집
    • /
    • 제8권4호
    • /
    • pp.361-366
    • /
    • 2005
  • The high investment is necessary for the new high speed lines. So the KRRI has been interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The pantograph in train is indispensable in order to supply the electrification equipments with power in safe. The pantograph and the overhead wire form a dynamic coupled system and they affect each other through the contact force. Unfortunately, as the operational speed of a train increases, the vibration of the pantograph and the overhead wire also increases. This may lead to a zero contact force between the pantograph head and the overhead wire, which can results in the loss of contact, arching and abrasion. If the arching and spark happen between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper describes the dynamic response between the pantograph and catenary system by the numerical simulations and presents the LQ-servo controller to reduce the contact force variation

Practical fatigue/cost assessment of steel overhead sign support structures subjected to wind load

  • van de Lindt, John W.;Ahlborn, Theresa M.
    • Wind and Structures
    • /
    • 제8권5호
    • /
    • pp.343-356
    • /
    • 2005
  • Overhead sign support structures number in the tens of thousands throughout the trunk-line roadways in the United States. A recent two-phase study sponsored by the National Cooperative Highway Research Program resulted in the most significant changes to the AASHTO design specifications for sign support structures to date. The driving factor for these substantial changes was fatigue related cracks and some recent failures. This paper presents the method and results of a subsequent study sponsored by the Michigan Department of Transportation (MDOT) to develop a relative performance-based procedure to rank overhead sign support structures around the United States based on a linear combination of their expected fatigue life and an approximate measure of cost. This was accomplished by coupling a random vibrations approach with six degree-of-freedom linear dynamic models for fatigue life estimation. Approximate cost was modeled as the product of the steel weight and a constructability factor. An objective function was developed and used to rank selected steel sign support structures from around the country with the goal of maximizing the objective function. Although a purely relative approach, the ranking procedure was found to be efficient and provided the decision support necessary to MDOT.

전차선로 속도향상에 따른 오버랩 구간(Overlap section) 경간 구성 기법 (Research on Configuration Optimization of Overlap Section in Overhead Catenary System for High-speed Railway)

  • 최태수;최규형
    • 전기학회논문지
    • /
    • 제66권6호
    • /
    • pp.975-980
    • /
    • 2017
  • Overhead catenary system of electric railway has overlap sections which devide and tighten trolley wire supplying electric power to train, where current collection performances may become worse according to railway speed-up. Current collection tests conducted at 400 km/h test-bed section of Honam high-speed railway show that balanced line arrangement at overlap section is needed to secure current collection without arc generation between trolley wire and train current collection device. This paper proposes a design procedure of the overlap section to allow for tension increase and uplift of the trolley wires according to railway speed-up. By applying the proposed procedure to the overhead catenary system of Honam high-speed railway, it is suggested that the minimum span length should be 33.2 m for railway speed-up to 350 km/h and 43.7 m for speed-up to 400 km/h.

전차선로 전기적 특성 평가 시스템 구현 (Implementation of Electrical Property Assessment System for Overhead Contact Lines)

  • 오석용;박영;조용현;이기원;송준태
    • 한국전기전자재료학회논문지
    • /
    • 제24권6호
    • /
    • pp.497-503
    • /
    • 2011
  • Currently in Korea, the simple catenary type overhead contact line system is being applied to both conventional lines and high speed lines of electric railway, and circulation current flowing into the catenary system frequently bring undesirable consequences. Namely, the connector wire has many problems according to a flow of excessive circulation current and arc current on catenary when an electric train runs at high speed. This paper presents the development and application of a real-time data acquisition system designed to measure the electrical characteristics of an overhead catenary system in electric railways. The developed system is capable of storing data of a 25 kV power source in a live wire state through a telemetry environment. The field test results show that the proposed technique and the developed system can be practically applied to measure characteristics of current of an overhead catenary system.

345kV 인천화력 송전선로 철탑도괴 원인분석 및 대책 (345kV Overhead Transmission Line Collapse Analysis and Countermeasures)

  • 박재웅;신태우;최진성;최한열;민병욱
    • 전기학회논문지
    • /
    • 제59권3호
    • /
    • pp.531-535
    • /
    • 2010
  • 345kV Incheon Thermal Power Plant Transmission Line Collapse Analysis and Countermeasures. The Typhoon Galmaegi which had been formed in July 15, 2008 diminished into a tropical cyclone and cooled the air above the West Sea. The cooled air colliding with the warm inland air caused a strong whirlwind at some places in the west seaside; the whirlwind battered the 345kV Incheon Thermal Power Plant Transmission Line to be collapsed. The resistance of transmission towers against wind pressure, one of the key elements in transmission line engineering, is designed to endure the pressure corresponding to the maximum instantaneous wind speed. Before the above accident happened, no transmission line has ever been collapsed by a whirlwind. So this paper is aimed to analyze causes that collapsed 345kV Incheon Thermal Power Plant transmission line and to introduce countermeasures.

웨이브렛을 이용한 혼합송전선로에서의 거리계전 알고리즘 개선 (Improvement of Digital Distance Relaying Algorithm Using Wavelet Transform in Combined Transmission Line)

  • 정채균;김경호;하체웅;이종범;윤양웅
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권10호
    • /
    • pp.593-601
    • /
    • 2003
  • Distance realy is tripped by the line impedance calculated at the relay point. Accordingly the accurate operation depends on the precise calculation of line impedance. Impedance can be accurately calculated in case of overhead line. However, in case of power cables or combined transmission lines, impedance can not be accurately calculated because cable systems have the sheath, grounding resistance, and sheath voltage limiters(SVLs). There are also several grounding systems in cable systems. Therefore, if there is a fault in cable systems, these terms will severely be caused much error to calculation of impedance. Accordingly the proper compensation should be developed for the correct operation of the distance relay. This paper presents the distance calculating algorithm in combined transmission line with power cable using wavelet transform. In order to achieve such purpose, judgement method to discriminate the fault section in both sections was proposed using D1 coefficient summation in db4. And also, error compensation value was proposed for correct calculation of impedance in power cables section.

절연구분장치의 속도향상 기술 (Technique on the speed up of neutral section in the catenary system)

  • 창상훈;박병수;김영곤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.71-74
    • /
    • 2005
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

혼합배전계통에서 EMTP/APTDraw를 이용한 개폐서지 해석에 관한 연구 (A Study and Analysis on the Switching Surge Using a EMTP/ATPDraw in the Combined Distribution System)

  • 이장근;이종범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.175-177
    • /
    • 2005
  • This paper analyzes transient behavior due to switching overvoltage in 22.9kV combined distribution systems. Computer models are consisted of distribution overhead line model, underground cable model and surge-arrester model in this paper. The computer models are made by EMTP/ATPDraw simulation and Line constants are calculated by ATP_LCC. This paper analyzes the various parameters affecting. These factors include closing angle and cable length.

  • PDF

직격뢰 침입시 배전계통 절연설계 (Insulation Design of Distribution Systems in Case of the Stroke of Direct Lightning Surge)

  • 정채균;김상국;이종범;서재호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권4호
    • /
    • pp.238-247
    • /
    • 2004
  • This paper describes the insulation coordination scheme of line in distribution system when the direct lightning surge strikes. The BIL that is applied to distribution system is not properly considered the performance and operation of arresters. Because of that, the high BIL is being used at partial system. This paper variously analyses the lightning overvoltage of line and equipment with earth of overhead grounding wire and installation types of arrester. From these result. authors examine the rationality of BIL.

345kV 인천화력 송전선로 철탑도괴 원인분석 및 대책 (Analysis and Countermeasures of 345kV Incheon-TP Overhead Transmission Lines Collapse)

  • 민병욱;신태우;최진성;최한열;박재웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.323_324
    • /
    • 2009
  • 345kV Incheon Thermal Power Plant Transmission Line Collapse Analysis and Countermeasures. The Typhoon Galmaegi which had been formed in July 15, 2008 diminished into a tropical cyclone and cooled the air above the West Sea. The cooled air colliding with the warm inland air caused a strong whirlwind at some places in the west seaside; the whirlwind battered the 345kV Incheon Thermal Power Plant Transmission Line to be collapsed. The resistance against wind pressure, one of the key elements in transmission line engineering, is designed to endure the pressure corresponding to the maximum instantaneous wind speed. Before the above accident happened, no transmission line has ever been collapsed by a whirlwind. So this paper is aimed to analyze causes that collapsed 345kV Incheon Thermal Power Plant transmission line and to introduce countermeasures.

  • PDF