345kV Overhead Transmission Line Collapse Analysis and Countermeasures

345kV 인천화력 송전선로 철탑도괴 원인분석 및 대책

  • Published : 2010.03.01

Abstract

345kV Incheon Thermal Power Plant Transmission Line Collapse Analysis and Countermeasures. The Typhoon Galmaegi which had been formed in July 15, 2008 diminished into a tropical cyclone and cooled the air above the West Sea. The cooled air colliding with the warm inland air caused a strong whirlwind at some places in the west seaside; the whirlwind battered the 345kV Incheon Thermal Power Plant Transmission Line to be collapsed. The resistance of transmission towers against wind pressure, one of the key elements in transmission line engineering, is designed to endure the pressure corresponding to the maximum instantaneous wind speed. Before the above accident happened, no transmission line has ever been collapsed by a whirlwind. So this paper is aimed to analyze causes that collapsed 345kV Incheon Thermal Power Plant transmission line and to introduce countermeasures.

Keywords

References

  1. 초고압건설지, 한국전력, pp.18-22, pp117-122, 1979
  2. 345kV 인천화력송전선로 고장조사 보고서, 한국전력, pp15-17, 2008
  3. 架空送電線路の手引, 日本東京電力株式會社, pp. 46-49, pp.86-101, 1993.
  4. 345kV Overhead Transmission Line in Korea, Final Report Contract No.KEC-71-2003, SIEMENS, pp. E44030-474-485, 1975.
  5. 한국산업표준 KS D 3503 일반구조용 압연 강재, 지식경제부 기술표준원, pp 2-3, 2008
  6. 한전등록구매규격(Registration Technical Specifications of KEPCO) 철탑(Tower), KEPCO, pp. 11-12, 2007.
  7. 철탑설계기준(DS-1111), 한국전력, pp. 25-27, 2008