In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.
본 논문은 배전선에 설치하는 내뢰설비인 가공지선과 피뢰기의 특성과 생략 방안에 대하여 언급하였다. 특히, 피뢰기의 중간 상을 생략하는 방안에 대하여 EMTP 시뮬레이션을 실시하여 생략시 나타날 수 있는 문제점과 생략 방안에 대해 기술하였으며, 가공지선은 지정된 경우에는 생략이 가능하고 피뢰기는 중간 상을 생략시 건전상의 피뢰기 용량을 재검토해야 할 것으로 생각된다.
This study fabricated a simulation facility which reduced the structure of a current distribution line to 50:1 in order to analyze the induced lightning shielding effect of a 22.9kV-Y distribution line according to ground resistance capacity, grounding locations, etc. When installing an overhead ground wire, the standard for grounding a distribution line with a current of 22.9kV-Y requires that ground resistance in common use with the neutral line be maintained less than $50\Omega$every 200m span. The reduced line for simulation had 7 electric poles and induced lightning was applied to the ground plane 2m apart from the line in a direction perpendicular to it using an impulse generator. If induced voltage occurred in the line and induced current flowed through the line due to the applied current, the induced voltage and current of the 'A' phase were measured respectively using an oscilloscope. When all 7 electric poles were grounded with a ground resistance of less than $50\Omega$ respectively, the combined resistance of the line was $7.4\Omega$. When an average current of 230A was applied, the average induced voltage and current measured were 1,052V and 13.8A, respectively. Under the same conditions, when the number of grounding locations was reduced, the combined resistance as well as induced voltage and current showed a tendency to increase. When all 7 electric poles were grounded with a ground resistance of less than $100\Omega$, the combined resistance of the line was $14.9\Omega$. When an average current of 236A was applied, the average induced voltage and current of the 'A' phase calculated were 1,068V and 15.6A, respectively. That is, in this case, only the combined resistance was greater than when all 7 electrical poles were grounded, and the induced voltage and current were reduced. Therefore, it is thought that even though ground resistance is slightly higher under a construction environment with the same conditions, it is advantageous to ground all electric poles to ensure system safety.
This paper is to analyze electromagnetic fields on a 154kV substation system and induced voltages on the substation fence when the network is operating in a normal condition or a fault condition in which one phase is shorted with the overhead ground wire. Also, changing the scalar potential and electromagnetic fields that are changed in accordance with changing resistivity and permeability of ground are studied. A finding of the study is that the scalar potential and electromagnetic fields are raised near the tower: The values of electric field on the corner of fence and at the edge of the ground grid are higher than other locations.
In this paper, we analyze inductive interference in conductive material around 345 kV power transmission line, and evaluate the effects of mitigation wires. Finite element method (FEM) is used to numerically compute induced eddy currents as well as magnetic fields around powder transmission lines. In the analysis model, geometries and electrical properties of various elements such as power transmission line, buried pipe lines, overhead ground wire, and conducting earth are taken into accounts. The calculation shows that mitigation wire reduces fairly good amount of eddy currents in buried pipe line. To find the optimum magnetic field shielding location of mitigation wire, we applied evolution strategy algorithm, a kind of stochastic approach, to the analysis model. Finally, it was shown that we can find more effective shielding effects with optimum location of one mitigation wire than with arbitrary location of multi-mitigation wires around the buried pipe lines.
The purpose of this paper is to measure the induced voltage of the downscaled and simulated overhead ground wire of a 22.9kV-Y distribution line. This study performed a test of the downscaled and simulated distribution line according to whether it is grounded or not and the value of the ground resistance. In order to verify the reliability of the data measured by the test, the data was analyzed using the Minitab 17 program. It was found that the induced voltage of the downscaled and simulated distribution line is influenced by the value of the ground resistance. It was also found that the ground resistance obtained at a certain point is closely related to whether electric poles are grounded or not. The analysis results of the measured test data with a statistical method showed that the Anderson Darling (AD) was analyzed to be the smallest as 0.188 when the ground resistance of the electric poles had been maintained at $10{\Omega}$. In addition, the P value analyzed to be 0.894 which is in the proximity of the theoretical value of 1 and verified the reliability of the test data. It could be seen that the data measured by the downscaled simulation test forms a linear graph. It is thought that if a distribution line is installed in the same manner as the downscaled, simulated distribution line, the mean induced voltage will be reduced and reliability will be increased.
This paper presents a calculation method of an induced voltage on telecommunication lines using primitive impedance matrix. The advantages of the method are using actual neutral current value and not using screening factor for considering the overhead ground wire and neutral wire. To verify the effectiveness and accuracy of the method, case studies are performed with EMTP (Electro-Magnatic Transient Program).
본 논문에서는 이론적, 실험적 분석의 경험을 토대로 가공지선과 중성선을 겸용하는 실증 배전선로를 구성하고자 한다. 이를 위해 가공지선과 중성선을 겸용하는 선로를 제안하고 실증적 규모에서 가공지선과 중성선을 겸용하는 선로의 효율성을 입증하기 위해 실증 배전선로를 구성하여 운영하였으며, 선로 구조에 따른 낙뢰영향 및 중성선의 설치 위치 변경에 따른 효과를 비교 분석한다. 이에 충북 청원군 형동리 일대에 가공지선과 중성선을 겸용하는 실증 배전선로를 구성하여 운영하였으며 낙뢰카운터기를 설치하여 운영기간 동안 낙뢰 차폐효과를 분석하였다.
Recently, it is common in a distribution system of Korea Electric Power Corporation (KEPCO) to find instances where distribution lines are parallel. A traditional method of an induced voltage calculation is not suitable for parallel distribution lines. For more actual analysis of induced voltage on telecommunication lines in parallel distribution lines, a new calculation method is needed. This paper presents a new calculation method of an induced voltage on telecommunication line using equivalent ${\pi}$ circuits matrix in parallel distribution lines. The advantages of the calculation method are using actual neutral current value and not using screening factor for considering the overhead ground wire and the neutral wire. To verify the effectiveness and the accuracy of the method, various case studies are performed with EMTP(Electro-Magnetic Transients Program).
This paper deals with the development of on-line fault and lightning stroke section locating system for branched overhead transmission line. The section locating algorithm of this system i3 by analyzing the distribution pattern of current flowing through the overhead ground wire. It composes of three parts; current sensors, local remote terminal unit(RTU) and analysis program at surveillance tenter. Double Rogowski coil sensor having integrating amplifier was designed as current sensor. In order for current pattern analysis, the transmitted waves from each sensor wert synchronized by GPS tim c clock in RTU. While, lightning stroke location are judged only by polarity information of lightning currents. This design has a benefit in simplicity of signal processing unit of RTU.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.