• Title/Summary/Keyword: Overall system test

Search Result 866, Processing Time 0.027 seconds

A Study of Overall Measurement System for the Power dispersed High Speed Railway with 400km/h of Maximum Test Speed (최고시험속도 400km/h 동력분산형 고속철도의 종합계측시스템 구성 방안 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Lee, Jun-One
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1785-1790
    • /
    • 2010
  • This study examined the overall measurement system for the power dispersed high speed railway with 400km/h of maximum test speed. The measuring system evaluating an efficiency, stability and reliability is important for developing the high speed railway. In order to organize the comprehensive measuring system, it is needed to determined the test item, a number of channel and the specifications of the measurement system. In this study, we made lists for the performance evaluation tests of the next generation high speed railway expected to be developed in the future, and prepared generalization channel sheets for the specification of the overall measurement system. In addition, the specifications for the measuring system were discussed and synthesized.

  • PDF

A Study on Overall Measurement System Development of HEMU-400X Performance Test (차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

A Study on Overall Measurement System Development of HEMU-400X (HEMU-400X 종합계측시스템 개발에 관한 연구)

  • Ryu, Sang-Hyun;Hong, Jun-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.484-488
    • /
    • 2011
  • Technologically advanced railway countries had a unique ability to design, test and evaluation systems for development of High-speed train system. To evaluate the performance of the train system in Korea for the development of advanced measurement technology and systems are needed. In this study, the Overall Measuring System(OMS) is going to be established to efficiently verify the performance, stability and reliability of the train system and the components, and verify of the maximum speed though an on-line test. OMS consist of vehicle measuring system, pantograph measuring system, video monitoring system and monitoring room was constructed for the overall measuring system and monitoring system. The results of this study were expected to contribute to technical improvement for evaluation of train system.

The Overall Measurement System Development for On-line Test of Super-speed Maglev Train (초고속 자기부상철도 시운전시험을 위한 종합계측시스템 개발)

  • Han, Young-Jae;Lee, Jin-Ho;Jo, Jung-Min;Kim, Lee-Hyung;Lee, Chang-Young;Ha, Chang-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.902-910
    • /
    • 2016
  • This paper presents the overall measurement system for on-line test of super-speed maglev train. The super-speed maglev train is composed of vehicle, propulsion, power, and so on. In order to evaluate and diagnose for sub-system, we made overall measurement system. Just like the other measurement system, it is designed to distributed type. The hardware is consist of SCXI, PXI, Terminal, UPS, and so forth. It is installed on a train, control room, power room and track to collect lots of signals. The software controls hardware system, monitors main data such as inverter current, converter voltage. Using the measurement system, we evaluated a lot of performances for vehicle, track, and so forth. Through the developed system have improved reliability and safety for super-speed maglev train.

THREE-DIMENSIONAL VERIFICATION OF INTRACRANIAL TARGET POINT DEVIATION USING MRI-BASED POLYMER-GEL DOSIMETRY FOR CONVENTIONAL AND FRACTIONATED STEREOTACTIC RADIOSURGERY

  • Lee, Kyung-Nam;Lee, Dong-Joon;Suh, Tae-Suk
    • Journal of Radiation Protection and Research
    • /
    • v.36 no.3
    • /
    • pp.107-118
    • /
    • 2011
  • Conventional (SRS) and fractionated (FSRS) stereotactic radiosurgery necessarily require stringent overall target point accuracy and precision. We determine three-dimensional intracranial target point deviations (TPDs) in a whole treatment procedure using magnetic resonance image (MRI)-based polymer-gel dosimetry, and suggest a technique for overall system tests. TPDs were measured using a custom-made head phantom and gel dosimetry. We calculated TPDs using a treatment planning system. Then, we compared TPDs using mid bi-plane and three-dimensional volume methods with spherical and elliptical targets to determine their inherent analysis errors; finally, we analyzed regional TPDs using the latter method. Average and maximum additive errors for ellipses were 0.62 and 0.69 mm, respectively. Total displacements were 0.92 ${\pm}$ 0.25 and 0.77 ${\pm}$ 0.15 mm for virtual SRS and FSRS, respectively. Average TPDtotal at peripheral regions was greater than that at central regions for both. Overall system accuracy was similar to that reported previously. Our technique could be used as an overall system accuracy test that considers the real radiation field shape.

Welding and Moment Resisting Performance of R/C Column-Steel Girder Connection (철근콘크리트 기둥-철골 보 접합부의 용접성능 및 휨 저항성능)

  • 전재범;최광호;이세웅;김상식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.553-558
    • /
    • 1999
  • As a process of development of composite beam-column connection system, structural tests have been conducted to verify moment resisting performance of the system. The tests have been proceeded by two steps, the first being welding performance test of the steel connection rod and stiffners, and the second overall moment resisting capacity of the fuly assembled system. Ten welding test specimens and four prototype specimens have been used in the test. Good structural performance of welding test specimens has been observed without any single welding failure, and sufficient moment resisting capacity has been proved from the overall performance test, with the moment magnitude in excess of the calculated plastic moment.

  • PDF

Test bed implementation and the indoor antenna algorithms fit for the indoor channel characteristic (옥내 무선 채널에 적합한 옥내 안테나 알고리즘과 검증시스템 구현)

  • Lee Yong up;Seo Young jun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.4C
    • /
    • pp.207-214
    • /
    • 2005
  • In the indoor wireless communication, it is considered the indoor wireless system architecture of single input multiple output (SIMO) that used with multiple antenna in order to cope with the indoor fading characteristic due to severe angler spread. We propose the mean steering vector technique as a method to enhance the system Performance, implement the test bed system composed of a PC and the algorithms of the wireless system, and analysis the performance of those algorithms. In addition, the overall operation scenario, overall architecture, and the execution time of the algorithms, of the test bed for the indoor wireless system are presented.

Development of an automated system for water-hydraulic and leakage test of pressure vessels

  • Kim, Dong-Soo;Lee, Won-Hee
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.5 no.1
    • /
    • pp.55-59
    • /
    • 2004
  • This study developed a fully automated test system for pressure vessels, containing such as oxygen, nitrogen, which is widely used in many industries. The pressure vessel test has three major parts including weight measurement test, water-hydraulic test and leakage test followed by cleaning and drying. The control system for these tests consists of three parts: a PLC, a monitoring system and a database management system. The PLC oversees overall control of test machines, while the monitoring system measures and displays weight, pressure, flow etc. for every situations, and the database management system stores test data. These three modules are designed to communicate with one another at 1 Hz frequency alerting problematic situations to the operator. The system has gone through actual field tests for verification of performances.

The Development of Pressure Regulator of Propellant Tank for KSR-III (KSR-III 추진제 탱크 압력 조절용 레귤레이터 개발)

  • 정영석;조기주;조인현;김용욱;오승협
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.6 no.4
    • /
    • pp.47-58
    • /
    • 2002
  • The pressure regulator has been developed as a pressure-control device of propellant tank in KSR-III. The pressurization system of KSR-III is a basic pressurization system composed of pressurant, He tank and propellant tank. The pressure-control regulator is the most important part of gas-pressurized feed system along with He tank, pyrovalve and He fill valve. The first model of the regulator is tested to satisfy in leakage, strength and basic performance. The second model is tested in the overall test of the KSR-III propulsion system using water. From the test result of the second model, we conclude that the capacity of valve(Cv) must be increased in real system. The third model is modified and tested in the overall test of KSR-III propulsion system using propellant. Finally, the pressure-control regulator is qualified from firing test.

Construct Test Line of Light Rail Transit for Overall Test and Commissioning (경량전철 기술개발 종합시험을 위한 시험선로 건설 사례)

  • Lee, An-Ho;Lee, Duck-Young
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1118-1123
    • /
    • 2004
  • Launched in 1999 and funded by the Korean government, the R&D project of developing the. light train system technology is finally wrapped up to produce its prototype train prototype and all the research activities on signal, communication, power supply third rail Type and infra-structure have been completed. In an attempt to verify the usability of the system through an actual testing and as a preliminary step to the application of the system to overall light train construction projects to be implemented in different cities in Korea, testing lines are under construction now. Here we'd like to introduce people to the general overview of the test line construction and interface found in the process of project.

  • PDF