DOI QR코드

DOI QR Code

초고속 자기부상철도 시운전시험을 위한 종합계측시스템 개발

The Overall Measurement System Development for On-line Test of Super-speed Maglev Train

  • 투고 : 2016.04.08
  • 심사 : 2016.04.18
  • 발행 : 2016.05.01

초록

This paper presents the overall measurement system for on-line test of super-speed maglev train. The super-speed maglev train is composed of vehicle, propulsion, power, and so on. In order to evaluate and diagnose for sub-system, we made overall measurement system. Just like the other measurement system, it is designed to distributed type. The hardware is consist of SCXI, PXI, Terminal, UPS, and so forth. It is installed on a train, control room, power room and track to collect lots of signals. The software controls hardware system, monitors main data such as inverter current, converter voltage. Using the measurement system, we evaluated a lot of performances for vehicle, track, and so forth. Through the developed system have improved reliability and safety for super-speed maglev train.

키워드

참고문헌

  1. T. Nakanishi, H. Takizawa, and K. Kato, "Test results on the new vehicles of the JR-Maglev", Maglev Conf., pp. 584-589. 2004.
  2. U. Henning, R. Hellinger, J. Nothhaft, "The transrapid propulsion system - results of operation", 16th International Conference on Magnetically Levitated Systems and Linear drives, pp. 269-274. 2000.
  3. S. Kusagawa, J. Baba, K. Shutoh, and E. Masada, "Comparision of total performances for High-speed ems-type magnetically levitated railway vehicle", Maglev Conf., pp. 942-952, 2004.
  4. R. Benavides, P. Mutschler, "Controlling a System of Linear Drives", IEEE PESC, Power Electronics Specialists Conf., 2005.
  5. L. Wanming, Y. Jinbin, Z. Baofeng, "Study of optimal design speed of high-speed maglev project", Maglev 2006, 13th-15th September, pp. 39-43. 2006.
  6. H. W. Lee, K. C. Kim, and J. Lee, "Review of maglev train technologies", IEEE Trans. on Magnetics, vol. 42, No. 7, pp. 1917-1925, 2006. https://doi.org/10.1109/TMAG.2006.875842
  7. Y. J. Han, J. M. Jo, J. H. Lee, L. H. Kim, and C. Y. Lee, "Measurement System for Performance Evaluation of Super Speed Maglev Train", The Korean Institute of Electrical Engineers Conference, 2013.
  8. Y. J. Han, K. H. Kim, S. I. Seo, C. K. Park, and S. H. Han, J. Y. Kim, and A. S. Kno, "A study on measurement system for motor block of railway vehicle", ICCAS Conf., pp. 1724-1726, 2003.
  9. Y. Park, Y. H. Cho, S. Y. Kwon, K. W. Lee, W. You, "Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway", The Transactions of the Korean Institute of Electrical Engineers, Vol. 60, No. 11, 2011. 11.
  10. Y. H. Cho, Y. Park, and H. J. Jung, "Implementation Technique of Real-time Monitoring System for High-Speed Rail Contact Wire with High Tension", The Transaction of The Korean Institute of Electrical Engineers, vol. 64, No. 8, pp. 1256-1261, 2015. https://doi.org/10.5370/KIEE.2015.64.8.1256
  11. S. W. Kim, Y. G. Kim, Y. J. Han, C. K. Park, J. H. Kim, K. S. Baik, "Development of a Measurement System Development for On-Line Testing of High Speed Railway", Railway Journal, Vol. 5, No. 3, pp. 87-95, 2002. 9.
  12. S. H. Ryu, J. H. Hong, "A Study on Overall Measurement System Development of HEMU-400X", Journal of the Korean Society for Railway, Vol. 14, No. 6, pp. 484-488, 2011. 12. https://doi.org/10.7782/JKSR.2011.14.6.484
  13. "Development of the core technologies for super-speed propulsion system and construction of a short-distance test line", KRRI research report, 2015.
  14. M. Paolo, and P. Giovanni, "Virtual Acquisition System for Global Analysis (VSGA) in Experimentation", WCRR, pp. 279-286. 1997.
  15. S. W. Kim, Y. J. Han, S. S. Kim, Y. G. Kim, "A study Overall System Development of Tilting Train Express", Journal of the Korean Society for Railway, 9(6), pp. 671-676. 2006.
  16. Y. Y Lee, S. H. Ryu, J. O. Lee, "A Study on Overall Measurement System of HEMU", Proceedings of the KSR Conference, pp. 3095-3102. 2009.