• Title/Summary/Keyword: Order Management

Search Result 18,189, Processing Time 0.045 seconds

A Design and Development of Part Management System including Capabilities from Data Management to Order Management (데이터 관리에서 발주 관리까지 기능을 포함하는 부품 관리 시스템의 설계와 개발)

  • Rhee, Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2012
  • Service Parts Management is defined as a supply management associated with service parts from the part suppliers to the final customer. A series of process to improve the customer service level by forecasting the demand and to minimize cost by maintaining the inventory level is included. Uniqueness such as missing value correction, the data pattern analysis and planned order system is designed and implemented. Main feature of order management system is to calculate order amount and order time based on selection of optimal forecasting algorithm.

Theorizing Length of Relationship as Moderator of Key Account Management Performance- Repeat Order Link

  • Ahmmed, Kawsar;Mohd, Nor Azila
    • The Journal of Economics, Marketing and Management
    • /
    • v.2 no.1
    • /
    • pp.1-17
    • /
    • 2014
  • In today's highly competitive and fast changing business environment, key account management-a supplier company initiated relationship marketing approach targeted at the most important customers to solve their complex requirements with special treatment that eventually ensures both parties' financial and nonfinancial objectives- has regarded as a strategic weapon of many companies' sales efforts to manage their strategically important customers. On the basis of the existing studies, this research introduces a theoretical model highlighting the hypothetical relationship between key account management performance and repeat order. In addition, moderating effect of length of relationship on the relationship between key account management performance and repeat order is also introduced. We theorize the conditions under which key account management performance influences key customer repeat order behavior as well as the influence of moderating variable of length of relationship on key account management performance-repeat order relationship. Theoretical and managerial implications are provided along with suggestions to isolate a platform for future empirical research.

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

A Study on the Configuration of the Quotation Management System in the Make-To-Order Manufacturing Environments (수주생산 환경에서 견적관리체계의 구성에 관한 연구)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.4
    • /
    • pp.73-81
    • /
    • 2021
  • Today's manufacturers must respond quickly to customer needs. In particular, make-to-order companies are constantly striving to satisfy customer demand for products in order to secure more favorable conditions in the future through bidding. In this bidding process, quotations play a very important role in providing favorable conditions. And the most important content that companies strive to satisfy their customers is the product's performance. Therefore, a company can attract customers and secure economic profits through good quotations, but it can be said that the first priority is to match the performance of the products requested by the customers. That is, when a company creates a quotation, it is important to structure the quotation according to the performance of the product. Thus, this paper intends to present a quotation management framework and a quotation BOM information model for constructing quotations efficiently in make-to-order manufacturing. And, in order to prove the usefulness of the proposed quotation management framework, we presents an case of the construction of an quotation management system based on the JAVA platform. As a result, the integrated quotation management system based on the proposed quotation management framework and quotation BOM has been successfully operated in a make-to-order company that manufactures marine engines.

Applying Genetic Algorithm for Can-Order Policies in the Joint Replenishment Problem

  • Nagasawa, Keisuke;Irohara, Takashi;Matoba, Yosuke;Liu, Shuling
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • In this paper, we consider multi-item inventory management. When managing a multi-item inventory, we coordinate replenishment orders of items supplied by the same supplier. The associated problem is called the joint replenishment problem (JRP). One often-used approach to the JRP is to apply a can-order policy. Under a can-order policy, some items are re-ordered when their inventory level drops to or below their re-order level, and any other item with an inventory level at or below its can-order level can be included in this order. In the present paper, we propose a method for finding the optimal parameter of a can-order policy, the can-order level, for each item in a lost-sales model. The main objectives in our model are minimizing the number of ordering, inventory, and shortage (i.e., lost-sales) respectively, compared with the conventional JRP, in which the objective is to minimize total cost. In order to solve this multi-objective optimization problem, we apply a genetic algorithm. In a numerical experiment using actual shipment data, we simulate the proposed model and compare the results with those of other methods.

The Impact of Picking Performance by the Zone Arrangement Method in Pick to Light Order Picking System (Pick to Light 오더피킹시스템의 존 배치 방법이 피킹 생산성에 미치는 영향)

  • You, Kang-Chul;Shin, Jae-Cheon;Shim, Ho-Seob;Choi, Jong-Su;Choi, Chun-Ho;Kim, Ha-Gon;Kim, Bu-Yeol;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.207-214
    • /
    • 2010
  • The picking process in distribution center is one of the most difficult and time-consuming process. The improvement of picking productivity is a core element which decides efficiency of the distribution center. The time to shipping on vehicles from receiving depends on the arrangement of items or picking methods. The Pick to Light system typically is used to improve the efficiency of order picking. In some cases the layout design of Pick to Light system has been performed rather than scientific analysis by a common experience. Therefore, this study analyzed the impact of picking performance by the zone arrangement method in order picking process of Pick to Light system.

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.1
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

The Effect of Case Management for Clients with Hypertension in Home Visiting Health Services (일 보건소 방문건강관리사업 고혈압대상자의 사례관리 효과)

  • Jang, Hyo Soon
    • Journal of Korean Public Health Nursing
    • /
    • v.28 no.2
    • /
    • pp.258-269
    • /
    • 2014
  • Purpose: This study was conducted in order to present the effects of case management of a home visiting health service for clients with hypertension. Method: One-group pretest-posttest design was used. The subjects were 280 clients who received case management among the first and second registered group. The data were eight-week-case management results from January to December, 2010. In order to evaluate the effect of the visiting nursing service, biological indexes(blood pressure, total cholesterol, triglyceride, high density lipoprotein, low density lipoprotein, BMI) and self-care abilities(knowledge/attitude of hypertension, management of medication, nutritional care, confidence of self care) were measured. Result: Biological indexes and self-care abilities were improved, except total cholesterol, low density lipoprotein. Conclusion: The case management of home visiting health service by public health centers is considered to be an effective nursing service. Therefore, greater effort is needed for better maintenance of case management, and more research is needed in order to examine a variety of biological indexes.

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.