• 제목/요약/키워드: Optimal point

검색결과 2,285건 처리시간 0.029초

이동로봇의 전역경로설정방법 (The Grabal Path-Planning for Mobil robot)

  • 정헌;박기두;최한수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 B
    • /
    • pp.715-718
    • /
    • 1998
  • There are a lot of paths which connect between the mobile robot and the goat point. To make a mobile robot arrive at the goal point fastly, The optimal path is needed and a path palnning is necessary. In this paper, we propose a new method of path planning to find a path for mobile robot. It is based on Ginetic Algorithm for serching the optimal grobal path planning. Simulations show the efficiency for the grobal path planning.

  • PDF

최적의 램프뱅크형태를 결정하기 위한 열유동 해석 (A Thermal Flow Analysis for an Optimal shape of Solar Lamp Bank)

  • 백상화
    • 한국태양에너지학회 논문집
    • /
    • 제32권4호
    • /
    • pp.82-89
    • /
    • 2012
  • This study is on the thermal flow analysis to select an optimal shape of solar lamp bank. Solar Lamp bank is designed by the lamp bank design program based on point light source theory. The reliability of the program for lamp bank design is verified through irradiance variation experiments of a kind of lamp according to horizontal distance. Solar lamp bank facilitates heat distribution and satisfies the irradiance in the three wave length which test guidelines require. Among the 4 kinds of lamp bank, since lamp bank type D satisfies uniformity ${\pm}10%$ and also doesn't exceed total irradiance 1,232 $W/m^2$, type D is finally selected.

Computer Simulation of the Computational Method in Fuel Optimal Control

  • Lee, B.J.
    • Nuclear Engineering and Technology
    • /
    • 제4권1호
    • /
    • pp.11-22
    • /
    • 1972
  • 최대치(또는 최소치) 원리의 기본개념을 써서 제어함수 u(t)를 찾는데는 2점간 경계치 문제의 해결이 요구된다. 그런데 최근에는 2점간 문제를 푸는 방법으로 초기 costate vector를 찾아 문제를 해결하는 여러가지 편법이 개발되고 있다. 여기에서는 최적제어 함수를 찾는 새로운 방법의 하나로써 고안된 Newton's sequential방법을 써서 여러가지 공학적 문제를 풀어 봄으로써 이 방법이 매우 유효하다는 것을 알아냈다.

  • PDF

Complete Time Algorithm for Stadium Construction Scheduling Problem

  • Lee, Sang-Un
    • 한국컴퓨터정보학회논문지
    • /
    • 제20권9호
    • /
    • pp.81-86
    • /
    • 2015
  • This paper suggests heuristic algorithm with linear time complexity to decide the normal and optimal point at minimum loss/maximum profit maximum shortest scheduling problem with additional loss cost and bonus profit cost. This algorithm computes only the earliest ending time for each node. Therefore, this algorithm can be get the critical path and project duration within O(n) time complexity and reduces the five steps of critical path method to one step. The proposed algorithm can be show the result more visually than linear programming and critical path method. For real experimental data, the proposed algorithm obtains the same solution as linear programming more quickly.

A Framework for Determining Minimum Load Shedding for Restoring Solvability Using Outage Parameterization

  • Hwachang Song;Lee, Byongjun
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권2호
    • /
    • pp.73-78
    • /
    • 2004
  • This paper proposes a framework for determining the minimum load shedding for restoring solvability. The framework includes a continuation power flow (CPF) and an optimal power flow (OPF). The CPF parameterizes a specified outage from a set of multiple contingencies causing unsolvable cases, and it traces the path of solutions with respect to the parameter variation. At the nose point of the path, sensitivity analysis is performed in order to achieve the most effective control location for load shedding. Using the control location information, the OPF for locating the minimum load shedding is executed in order to restore power flow solvability. It is highlighted that the framework systematically determines control locations and the proper amount of load shedding. In a numerical simulation, an illustrative example of the proposed framework is shown by applying it to the New England 39 bus system.

무선 LAN에서 다중 Access Point 위치의 최적화 설계 (The Optimization Design of Multiple Access Point placement for wireless LAN)

  • 임국찬;강훈;최성훈
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 하계종합학술대회 논문집(1)
    • /
    • pp.371-374
    • /
    • 2002
  • The optimal AP placement for wireless LAN is important factor for improving service quality and reducing cost. Logical area property, which is user's frequently posed place, must be considerated for flexible design. This paper proposes optimal multiple AP placement method based on path loss model which is one of radio prediction tool. The proposed method can got flexibility in multiple AP placement using user's defined parameter and tile optimization design uses Hopfield network algorithm The result of simulation shows that the proposed optimization design of multiple AP placement can improve service quality for wireless LAN.

  • PDF

퓨리에 급수를 이용한 매니퓰레이터 경로 계획 (Path Planning for Manipulators Using Fourier Series)

  • 원종화;최병욱;정명진
    • 전자공학회논문지B
    • /
    • 제29B권10호
    • /
    • pp.27-36
    • /
    • 1992
  • This paper proposes a numerical method of motion planning for manipulators using Foruier series. For a redundant manipulator, we predetermine the trajectories of redundant joints in terms of the Nth partial sum of the fourier series. then the optimal coefficients of the fourier series are searched by the Powell's method. For a nonredundant or redundant manipulator, CS02T-continuous smooth joint trajectory for a point-to-point task can be obtained while considering the frequency response. We apply the proposed method to the 3-link planar manipulator and the PUMA 560 manipulator. To show the validity of the proposed method, we analyze solutions by the Fast Fourier Transform (FFT). Also, several features are discussed to obtain an optimal solution.

  • PDF

컴플렉스법에 의한 수문 유압실린더의 최적 설치점 설계 (Design of Optimal Locating Points of the Hydraulic Cylinder Actuating a Sluice Gate Using the Complex Method)

  • 이성래
    • 한국자동차공학회논문집
    • /
    • 제13권6호
    • /
    • pp.170-176
    • /
    • 2005
  • The hydraulic cylinder is used for actuating the sluice gate which controls the volume of water in the reservoir. The locating points of hydraulic cylinder are restricted to limited space and determined to minimize the cylinder force necessary for actuating the sluice gate. Generally, the head end point of cylinder is fixed at underground and the rod end point of cylinder is connected to the gate plate when it is fully opened. Therefore there exist three parameters to be determined to minimize the cylinder force in the operation range of sluice gate. The optimal locating points of hydraulic cylinder are obtained using the complex method that is one kind of constrained direct search m method.

Analysis of Generalized n-winding Coupled Inductor in dc-dc Converters

  • Kang, Taewon;Suh, Yongsug
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2017년도 전력전자학술대회
    • /
    • pp.88-89
    • /
    • 2017
  • This paper investigates the design of multi-winding coupled inductor for minimum inductor current ripple in rapid traction battery charger systems. Based on the general circuit model of multi-winding coupled inductor together with the operating principles of dc-dc converter, the relationship between the ripple size of inductor current and the coupling factor is derived under the different duty ratio. The optimal coupling factor which corresponds to a minimum inductor ripple current becomes -(1/n-1), i.e. a complete inverse coupling without leakage inductance, as the steady-state duty ratio operating point approaches 1/n, 2/n, … or (n1)/n. In an opposite manner, the optimal coupling factor value of zero, i.e. zero mutual inductance, is required when the steady-state duty ratio operating point approaches either zero or one.

  • PDF

Photovoltaic 시스템의 MPPT를 위한 새로운 알고리즘 개발 (Development of New Algorithm for Maximum Power Point Tracking of Photovoltaic system)

  • 박기태;고재섭;최정식;박병상;정동화
    • 한국화재조사학회지
    • /
    • 제10권1호
    • /
    • pp.87-95
    • /
    • 2007
  • This paper is proposed a novel method to approximate the maximum power for a photovoltaic inverter system and tracking method. It is designed for power systems application and utilities. The proposed Maximum Power Point Tracking (MPPT) control has the advantage to provide a new simple way to approximate the optimal or rated voltage, the optimal or rated current and maximum power rating produced by a solar panel and the photovoltaic inverter. And this straightforward method will be named linear reoriented coordinates method (LRCM) with the advantage that Pmax and $V_{op}$ can be approximated using the same variable as the dynamic model without using complicate approximations or Taylor series. Furthermore tracking method is improved over 50% photovoltaic efficiency. This paper is proposed MPPT using LRMC and tracking method using weather condition of domestic moderate program technique. This paper is proposed the experimental results to verify the effectiveness of the new methods.

  • PDF