• Title/Summary/Keyword: Optimal of The Place

Search Result 314, Processing Time 0.022 seconds

A Study of Electrode Locations for Design of ECG Monitoring Smart Clothing based on Body Mapping (심전도 모니터링 스마트 의류 디자인을 위한 바디매핑 기반 전극 위치 연구)

  • Cho, Hakyung;Cho, Sang woo
    • Fashion & Textile Research Journal
    • /
    • v.17 no.6
    • /
    • pp.1039-1049
    • /
    • 2015
  • The increase in the need for a 24 hour monitoring of biological signals has been accompanied by an increasing interest in wearable systems that can register ECG at any time and place. ECG-monitoring clothing is a wearable system that records heart function continuously, but there have been difficulties in making accurate measurements due to motion artifacts. Although various factors may cause noise in measurements due to motion, the variations in the body surface and clothing during movements that cause eventual the shifting and displacement of the electrodes is particularly noteworthy. Therefore, this study used biomedical body mapping and a motion-capture system to measure and analyze the changes in the body surface and garment during movements. It was deduced that the area where the friction and separation between the garment and skin is the lowest would be the appropriate location to place the ECG electrodes. For this study, 5 male and 5 female in their 20s were selected as subjects, and through their selected body movements, the changes in the garment and skin were analyzed using the motion-capture system. As a result, the area below the chest circumference and the area below the shoulder blades were proposed as the optimal location of electrode for ECG monitoring.

Calculation of the Costs and Optimal profits per Inpatient-day of the Geriatric Hospitals (노인병원의 재원환자 1인당 일평균 원가 및 적정이윤 계산)

  • Hwang, In-Kyoung;Kim, Jai-Sun;Choi, Whang-Gyu
    • Korea Journal of Hospital Management
    • /
    • v.8 no.4
    • /
    • pp.149-181
    • /
    • 2003
  • It has been asserted that per diem payment system should be introduced, in place of the current fee-for-service system, for payment of the inpatient services of the geriatric hospitals, Based on the assentation, this study aims at calculating costs and profits per inpatient-day of the geriatric hospitals, and thereby at contributing to the managerial improvement from the both sides of the Government and the hospitals. Relevant data of the three months, May to August, 2002 were collected from the five geriatric hospitals, and per inpatient-day costs and profits were calculated for the three disease groups. Major results and conclusions are as follow : Firstly, total costs per insured inpatient-day of the geriatric hospitals are 65, 389 won for dementia (including optimal profit of 3,858 won), 69,730 won for stroke (including optimal profit of 4,117 won), and 70,085 won for other diseases (including optimal profit of 4,134 won). Secondly, the amount of the non-insured costs per inpatient-day occupies 34.5% of the total costs for dementia, 30.3% for stroke, and 30.1% for other diseases. Thirdly, the total amount of the per inpatient-day costs calculated including the optimal profits is, on the average, higher by 12% than the present price level calculated for the current fee-far-service system. This implies that the present price level should rise by 12% when the current fee-far-service payment system be maintained, and Finally, introduction of a sliding-scale payment system should be considered for the inpatient medical management fees for the length of stay over six months or more that are being cut in the claim examination process by the insurance corporation.

  • PDF

The Comparative Study of Software Optimal Release Time Based on Weibull Distribution Property (와이블 분포 특성에 근거한 소프트웨어 최적 방출시기에 관한 비교 연구)

  • Kim, Hee-Cheul;Park, Hyoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.1903-1910
    • /
    • 2009
  • In this paper, we were researched decision problem called an optimal release policies after testing a software system in development phase and transferring it to the user. The applied model of release time exploited infinite failure non-homogeneous Poisson process This infinite failure non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used the Weibull distribution which has the efficient various property which has the place efficient quality. Thus, optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.

MONTE CARLO ANALYSIS FOR STATION ACQUISITION ERROR CORRECTION OF SATELLITE (인공위성의 위치획득 오차보정을 위한 몬테카를로 분석)

  • 김지영;최규홍
    • Journal of Astronomy and Space Sciences
    • /
    • v.12 no.2
    • /
    • pp.265-274
    • /
    • 1995
  • The purpose of perigee kick motor firing is to place a satellite into transfer orbit and that of apogee kick motor firing is to place the satellite into geosynchonous orbit in order to increase the semi-major axis of the transfer orbit and reduce the inclination of the transfer orbit. Because apogee motor firing is always accompanied with injection errors, the satellite is not placed into geosynchonous orbit but into a near-geosynchonous orbit, also knows as a drift orbit. Thus, the orbital maneuver to correct drift orbit into gteosynchonous orbit is required, this maneuver is called the station acquisition. For reduction of expenditure and performance of mission, we estimate $\Delta$V budget and required fuel allowance for station acquisition. As the uncertainty of drift orbit by injection error of perigee and apogee kick motor firing prevents us from obtaining exact $\Delta$V budget, statistical Monte Carlo simulation technique is used in order to get optimal $\Delta$V budget and required fuel allowance with a probability of 99%. With respect to Korea satellite launched by Delta-2 launch vehicle in 1995, Monte Carlo analysis is used in order to get various orbital parameters, $\Delta$V budget and required fuel allowance for station acquisition with a probability of 99%.

  • PDF

PStudy on Characteristics of Dryness Storage Tank, Component of Open-type Dehumidifying and Drying System using Solar Energy(I Experiment on Flowing Characteristics of Storage Tank for Regenerator) (태양열을 이용한 개방형 제습.건조시스템의 저장탱크 유동특성에 관한 연구(제1보 재생기용 저장탱크의 유동특성에 관한 실험))

  • Kim, J.R.;Choi, K.H.;Kum, J.S.;Kim, J.R.
    • Solar Energy
    • /
    • v.20 no.2
    • /
    • pp.1-8
    • /
    • 2000
  • The present study has been conducted to offer geometrically optimal structure of a storage tank for a regenerator, one of the components of an open-type dehumidifying and drying system using solar energy to develop an alternatives for time-limited energy such as a fossil fuel, and to decrease an environmental pollutant. Two kinds of model classified by the mixing process were suggested to estimate the amount of regeneration rate. One was the stratified-type, "case 1", a method to place an entrance in the upper part of the tank and an outlet in the lower part. The other was the mixed-type, "case 2", a method to place vice versa. Solution temperature and concentration were used to evaluate the regeneration rate. As a result, the regeneration rate was better in "case 2".

  • PDF

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

High Speed Self-Adaptive Algorithms for Implementation in a 3-D Vision Sensor (3-D 비젼센서를 위한 고속 자동선택 알고리즘)

  • Miche, Pierre;Bensrhair, Abdelaziz;Lee, Sang-Goog
    • Journal of Sensor Science and Technology
    • /
    • v.6 no.2
    • /
    • pp.123-130
    • /
    • 1997
  • In this paper, we present an original stereo vision system which comprises two process: 1. An image segmentation algorithm based on new concept called declivity and using automatic thresholds. 2. A new stereo matching algorithm based on an optimal path search. This path is obtained by dynamic programming method which uses the threshold values calculated during the segmentation process. At present, a complete depth map of indoor scene only needs about 3 s on a Sun workstation IPX, and this time will be reduced to a few tenth of second on a specialised architecture based on several DSPs which is currently under consideration.

  • PDF

Optimal 3-D Packing using 2-D Slice Data for Multiple Parts Layout in Rapid Prototyping (신속시작작업에서 2차원 단면데이터를 이용한 3차원 물체의 최적자동배치를 위한 알고리즘의 개발)

  • 허정훈;이건우;안재홍
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.3
    • /
    • pp.195-210
    • /
    • 1997
  • In Rapid Prototyping process, the time required to build multiple prototype parts can be reduced by packing several parts optimally in a work volume. Interactive arrangement of the multiple parts is a tedious process and does not guarantee the optimal placement of all the parts. In this case, packing is a kind of 3-D nesting problem because parts are represented by STL files with 3-D information. 3-D nesting is well known to be a problem requiring an intense computation and an efficient algorithm to solve the problem is still under investigation. This paper proposes that packing 3-D parts can be simplified into a 2-D irregular polygon nesting problem by using the characteristic of rapid prototyping process that the process uses 2-dimensional slicing data of the parts and that slice of the STL parts are composed of polygons. Our algorithm uses no-fit-polygon (NFP) to place each slice without overlapping other slices in the same z-level. The allowable position of one part at a fixed orientation for given parts already packed can be determined by obtaining the union of all NFP's that are obtained from each slice of the part. Genetic algorithm is used to determine the order of parts to be placed and orientations of each part for the optimal packing. Optimal orientation of a part is determined while rotating it about the axis normal to the slice by finite angles and flipping upside down. This algorithm can be applied to any rapid prototyping process that does not need support structures.

  • PDF

Optimal Allocation Heuristic Method of Military Engineering Equipments during Artillery Position Construction Operation (휴리스틱 기법을 이용한 포병진지 구축작전시 공병장비 최적배정)

  • Park, Se Hwan;Lee, Moon Gul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.11-21
    • /
    • 2017
  • Artillery fire power due to effectiveness which is hard to predict well-planned and surprising attack can give a fear and shock to the personnel and is a very core weapon system and takes a critical role in wartime. Therefore in order to maximize operational effectiveness, Army required protecting artillery and takes a quick attack action through rapid construction of artillery's positions. The artillery use artillery's position to prevent exposure by moving to other position frequently. They have to move and construct at new artillery's positions quickly against exposing existed place by foe's recognition. These positions should be built by not manpower but engineering construction equipment. Because artillery positions have to protect human and artillery equipment well and build quickly. Military engineering battalion have lots of construction equipment which include excavator, loader, dozer, combat multi-purposed excavator, armored combat earthmover dump truck and so on. So they have to decide to optimal number of Team combining these equipments and determine construction sequence of artillery's position in operational plan. In this research, we propose to decide number of Team efficiently and allocate required construction's positions for each Team under constraints of limited equipments and time. To do so, we develop efficient heuristic method which can give near optimal solution and be applied to various situation including commander's intention, artillery position's priority or grouping etc. This heuristic can support quick and flexible construction plan of artillery positions not only for using various composition's equipment to organize Teams but also for changing quantity of positions.

The Optimal Environmental Ranges for Wetland Plants : I. Zizania latifolia and Typha angustifolia (습지식물의 적정 서식 환경 : I. 줄과 애기부들)

  • Kwon, Gi Jin;Lee, Bo Ah;Byun, Chae Ho;Nam, Jong Min;Kim, Jae Geun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.1
    • /
    • pp.72-88
    • /
    • 2006
  • The optimal environmental ranges of the establishment phase for the distribution of Zizania latifolia and Typha angustifolia was determined to develop a set of basic data and criteria of planting substrate for the restoration, conservation and management of wetlands. The study was carried at 17 wetlands in the Kyunggi-do and Gyeongsangnam-do region where inland wetlands place intensively in June, 2005. Total 127 quadrats were sets in growing areas of Zizania latifolia and Typha angustifolia. $NO_3-N$, K, Ca, Mg and Na in the water variables and soil texture, LOI (loss on ignition), soil pH and soil conductivity in the soil variables were analyzed. The optimal range of water depth for the distribution of Zizania latifolia was -5~39cm, $NO_3-N$ content of water was <0.01~0.19ppm, K content of water was 0.1~5.9ppm, Ca content of water 0.5~44.9ppm, Mg content of water was 1.2~11.9ppm, Na content of water 3.4~29.9ppm, water conductivity was 48~450${\mu}S$/cm, respectively. The optimal range of LOI for the distribution of Zizania latifolia was 1.7~11.9%, soil conductivity was 25.5~149.9${\mu}S$/cm, respectively. The optimal range of water depth for the distribution of Typha angustifolia was -20~24cm, $NO_3-N$ content of water was <0.01~0.19ppm, K content of water was 0.2~2.9ppm, Ca content of water 0.6~19.9ppm, Mg content of water was 0.2~5.9ppm, Na content of water 3.5~19.9ppm, water conductivity was 96~450${\mu}S$/cm, respectively. The optimal range of LOI for the distribution of Typha angustifolia was 2.4~15.9%, soil conductivity was 17.6~149.9${\mu}S$/cm, respectively. The optimal soil texture were loam, silt loam and sandy loam in both species. The lower water depth (-20~40cm) is appropriate to increase biodiversity in both species dominated community and it is better to maintain water depth of 40~100cm for water purification. Both species appear frequently in the soil with high silt content.