• Title/Summary/Keyword: Optimal construction cost

Search Result 376, Processing Time 0.026 seconds

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

Methodology To Prevent Local Optima And Improve Optimization Performance For Time-Cost Optimization Of Reinforcement-Learning Based Construction Schedule Simulation

  • Jeseop Rhie;Minseo Jang;Do Hyoung Shin;Hyungseo Han;Seungwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.769-774
    • /
    • 2024
  • The availability of PMT(Project Management Tool) in the market has been increasing rapidly in recent years and Significant advancements have been made for project managers to use for planning, monitoring, and control. Recently, studies applying the Reinforcement-Learning Based Construction Schedule Simulation algorithm for construction project process planning/management are increasing. When reinforcement learning is applied, the agent recognizes the current state and learns to select the action that maximizes the reward among selectable actions. However, if the action of global optimal points is not selected in simulation selection, the local optimal resource may receive continuous compensation (+), which may result in failure to reach the global optimal point. In addition, there is a limitation that the optimization time can be long as numerous iterations are required to reach the global optimal point. Therefore, this study presented a method to improve optimization performance by increasing the probability that a resource with high productivity and low unit cost is selected, preventing local optimization, and reducing the number of iterations required to reach the global optimal point. In the performance evaluation process, we demonstrated that this method leads to closer approximation to the optimal value with fewer iterations.

A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization (Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model (이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구)

  • Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF

Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost

  • Park, Kyung Hoon;Lee, Sang Yoon;Yoon, Jung Hyun;Cho, Hyo Nam;Kong, Jung Sik
    • Smart Structures and Systems
    • /
    • v.4 no.5
    • /
    • pp.641-653
    • /
    • 2008
  • This paper proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the lifetime performance and the life-cycle cost as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method using the life-cycle costs and the performance of bridges. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence and a corresponding algorithm has been implemented into the program. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF