산업체 열병합발전시스템에서 최적운전계획 수립을 위한 진화 알고리즘을 이용한 GUI System 개발 (A Development of GUI System for Optimal Operational Scheduling on Industrial Cogeneration Systems Using Evolutionary Algorithms)

  • 정지훈;이종범
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권11호
    • /
    • pp.544-550
    • /
    • 2002
  • This paper describes a strategy of a daily optimal operational scheduling on the industrial cogeneration system. The cogeneration system selected to establish the scheduling consists of three units and several auxiliary devices which include three auxiliary boilers, t재 waste boilers and three sludge incinerators. One unit generated electrical and thermal energy using the back pressure turbine. The other two units generate the energy using the extraction condensing turbine. Three auxiliary devices operate to supply energy to the loads with three units. The cogeneration system is able to supply enough the thermal energy to the thermal load, however it can not sufficiently supply the electric energy to the electrical load. Therefore the insufficient electric energy is compensated by buying electrical energy from utility. In this paper, the evolutionary algorithms was applied to establish the optimal scheduling for the cogeneration systems. Also the GUI System was developed using established mathematics medeling and evolutionary algorithms in order that non-experts are able to establish operational scheduling. This results revel that the proposed modeling and strategy can be effectively applied to cogeneration system for paper mill.

산업용 열병합발전시스템에서 진화 알고리즘을 이용한 합리적 운전계획 수립에 관한 연구 (A Rational Operation Scheduling Using Evolutionary Algorithm on Industrial Cogeneration System)

  • 최광범;정지훈;이종범
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권10호
    • /
    • pp.494-501
    • /
    • 2000
  • This paper describes a strategy of a daily optimal operational scheduling in cogeneration system for paper mill. The cogeneration system selected to establish the scheduling consists of three units and several auxiliary devices. One unit generates electrical and thermal energy using the back pressure turbine. The rest two units generate the energy using the extraction condensing turbine. Three auxiliary boilers, two waste boilers and three sludge incinerators operate to supply energy to the loads with three units. The cogeneration system is able to supply enough the thermal energy to the thermal load, however it can not sufficiently supply the electrical power to the electrical load. Therefore the insufficient electric energy is compensated by buying electrical energy from utility. When the operational scheduling is performed considering the environmental problem. This paper shows the simulation results for daily operational scheduling obtained using the evolutionary algorithm. This results reveal that the proposed modeling and strategy can be effectively applied to cogeneration system for paper mill.

  • PDF

NSGA-II를 이용한 한국해군 함정 운용계획에 대한 연구 (A Study on the Operational Scheduling for ROK's Navy Ships Using NSGA-II)

  • 정환식;이재영;이용대
    • 한국시뮬레이션학회논문지
    • /
    • 제19권3호
    • /
    • pp.55-62
    • /
    • 2010
  • 본 연구는 한국해군의 함정 운용을 효율적으로 계획하는 문제이다. 가용성은 임의의 한 시점에 무장, 항해, 그리고 추진장비와 같이 함정 내 주요 시스템들이 작전운용 요구수준을 만족하는 상태로 정의할 수 있다. 제한된 자원 및 정비 시설 하에서 함정의 가용성을 극대화한다는 것은 대한민국 해군의 전투력 향상에 중요한 역할을 담당한다. 그러나 가용성의 극대화만을 추구한 나머지 일부 함정들을 무리하게 운용하여 해당함정의 집중 마모를 야기할 수 있다. 이는 다른 함정들에게도 영향을 미쳐 계획된 정비를 받지 못하여 전체적으로 함정의 가용성을 저하시킬 수 있다. 본 연구에서는 NSGA-II 알고리즘을 적용하여 함정별 가용기간을 평준화하고, 가용기간에 따른 정비확률을 고려한 효율적인 함정 운용 계획을 제시하였다. 실험 결과 1500세대 이후 안정화된 결과들을 도출하였다. 안정화된 결과들 중에서 2개의 결과를 선택하여 각 목적별로 차이점을 비교 제시하였다.

도상 다짐작업의 장기 일정계획 문제에 관한 수리적 모형 고찰 (A Study on a Mathematical Model of the Long-term Track Tamping Scheduling Problem)

  • 오석문;이지하;이희업;박범환;홍순흠
    • 한국철도학회논문집
    • /
    • 제9권1호
    • /
    • pp.50-56
    • /
    • 2006
  • This paper presents a mathematical model of the long-term track tamping scheduling problem in the Korean highspeed railway system. The presented model encompasses various operational field constraints, moreover improves a state-of-the-art model in extending the feasible space. We show the model is sized up to intractable scale, then propose another approximation model that is possible to handle with the present computer system and commercial optimization package, directly. The aggregated index, lot, is selected, considering the resolution of the planning horizon as well as scheduling purpose. Lastly, this paper presents two test results for the approximation model. The results expose the approximation model to quite promising in deploying it into an operational software program for the long-term track tamping scheduling problem.

Generation Scheduling with Large-Scale Wind Farms using Grey Wolf Optimization

  • Saravanan, R.;Subramanian, S.;Dharmalingam, V.;Ganesan, S.
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1348-1356
    • /
    • 2017
  • Integration of wind generators with the conventional power plants will raise operational challenges to the electric power utilities due to the uncertainty of wind availability. Thus, the Generation Scheduling (GS) among the online generating units has become crucial. This process can be formulated mathematically as an optimization problem. The GS problem of wind integrated power system is inherently complex because the formulation involves non-linear operational characteristics of generating units, system and operational constraints. As the robust tool is viable to address the chosen problem, the modern bio-inspired algorithm namely, Grey Wolf Optimization (GWO) algorithm is chosen as the main optimization tool. The intended algorithm is implemented on the standard test systems and the attained numerical results are compared with the earlier reports. The comparison clearly indicates the intended tool is robust and a promising alternative for solving GS problems.

FMC 시스템의 스케쥴링 및 시뮬레이션 (Scheduling and simulation for FMC systems)

  • 서기성;이노성;안인석;박승규;이규호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1992년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 19-21 Oct. 1992
    • /
    • pp.370-375
    • /
    • 1992
  • This paper deals with the scheduling and simulation for FMC(Flexible Manufacturing Cells). In order to achieve CIM, there is a critical need to link factory level and machine level. The primary functions performed by this link for all jobs issued to the shop floor and cell include short-term scheduling and dynamic operational scheduling. Here, hierarchical control structure is introduced to define these functions. And Intelligent scheduling through expert module is adopted for efficiency of FMC operation. Computer simulation reveals that expert scheduling method is better than heuristics in various performance index.

  • PDF

응급의료센터를 위한 위험기반 운영계획 모델 (Risk-based Operational Planning and Scheduling Model for an Emergency Medical Center)

  • 이미림;이진표;박민재
    • 산업경영시스템학회지
    • /
    • 제42권2호
    • /
    • pp.9-17
    • /
    • 2019
  • In order to deal with high uncertainty and variability in emergency medical centers, many researchers have developed various models for their operational planning and scheduling. However, most of the models just provide static plans without any risk measures as their results, and thus the users often lose the opportunity to analyze how much risk the patients have, whether the plan is still implementable or how the plan should be changed when an unexpected event happens. In this study, we construct a simulation model combined with a risk-based planning and scheduling module designed by Simio LLC. In addition to static schedules, it provides possibility of treatment delay for each patient as a risk measure, and updates the schedule to avoid the risk when it is needed. By using the simulation model, the users can experiment various scenarios in operations quickly, and also can make a decision not based on their past experience or intuition but based on scientific estimation of risks even in urgent situations. An example of such an operational decision making process is demonstrated for a real mid-size emergency medical center located in Seoul, Republic of Korea. The model is designed for temporal short-term planning especially, but it can be expanded for long-term planning also with some appropriate adjustments.

FAB-Wide 스케줄링을 통한 반도체 연구라인의 운용 최적화 (The Operational Optimization of Semiconductor Research and Development Fabs by FAB-wide Scheduling)

  • 김영호;이지형;선동석
    • 전기학회논문지
    • /
    • 제57권4호
    • /
    • pp.692-699
    • /
    • 2008
  • Semiconductor research and development(R&D) fabs are very different than production fabs in many ways such as the scales of production, job priority, production methods, and performance measures. Efficient operations of R&D fabs are very important to the development of new product, process stability, high yield, and ultimately company competitiveness. This paper proposes the fab-wide scheduling method for operational optimization of the R&D fabs. Most scheduling systems of semiconductor fabs have only focused on maximizing throughput of each separated areas without considering WIP(works in process) flows of entire fab. In this paper, we proposes the a fab-wide scheduling system which schedules all lots to entire fab equipment at once. We develop the MIP(mixed integer programing) model which allocates the lots to production equipment considering many constraints of all processes and the CP(constraint programming) model which determines the sequences of the lots in the production equipment. The proposed FAB-wide scheduling model is applied to the newly constructed R&D fab. As a result, we have accomplished the system based automated job reservation, decrease of the hot lot delay, increase of the queue time satisfaction, the high throughput by maximizing the batch sizes, decrease of the WIP TAT(Turn Around Time).

Revenue Maximizing Scheduling for a Fast Electric Vehicle Charging Station with Solar PV and ESS

  • Leon, Nishimwe H.;Yoon, Sung-Guk
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제6권3호
    • /
    • pp.315-319
    • /
    • 2020
  • The modern transportation and mobility sector is expected to encounter high penetration of Electric Vehicles (EVs) because EVs contribute to reducing the harmful emissions from fossil fuel-powered vehicles. With the prospective growth of EVs, sufficient and convenient facilities for fast charging are crucial toward satisfying the EVs' quick charging demand during their trip. Therefore, the Fast Electric Vehicle Charging Stations (FECS) will be a similar role to gas stations. In this paper, we study a charging scheduling problem for the FECS with solar photovoltaic (PV) and an Energy Storage System (ESS). We formulate an optimization problem that minimizes the operational costs of FECS. There are two cost and one revenue terms that are buying cost from main grid power, ESS degradation cost, and revenue from the charging fee of the EVs. Simulation results show that the proposed scheduling algorithm reduces the daily operational cost by effectively using solar PV and ESS.

전지전력저장설비의 최적운용 및 운전특성에 관한 연구 (The Optimal Scheduling and Operational characteristics on Battery Energy Storage System)

  • 송길영;오광해;김용하;노대석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.102-105
    • /
    • 1993
  • The objective of this study is to solve the operation scheduling problem of plural battery energy storage systems (BESS), and to find useful intonation from its result. Unlike conventional energy storage system, BESS has on hardware characteristics such as high efficiency, fast-acting response and operational loss. Considering rate constraints of thermal unit power as well as hardware characteristics of BESS, the operation scheduling has an intricated problem. In order to solve this optimization problem, we use successive approximations dynamic programming. In two types of operation, the proposed algorithm is applied to test system. one is daily optimal operation, the other weekly optimal operation.

  • PDF