• Title/Summary/Keyword: Operation method

Search Result 12,478, Processing Time 0.037 seconds

A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility (대기시간 제약을 고려한 반도체 웨이퍼 생산공정의 스케쥴링 알고리듬)

  • Joo, Byung-Jun;Kim, Yeong-Dae;Bang, June-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.266-279
    • /
    • 2009
  • This paper focuses on the problem of scheduling wafer lots with limited waiting times between pairs of consecutive operations in a semiconductor wafer fabrication facility. For the problem of minimizing total tardiness of orders, we develop a priority rule based scheduling method in which a scheduling decision for an operation is made based on the states of workstations for the operation and its successor or predecessor operation. To evaluate performance of the suggested scheduling method, we perform simulation experiments using real factory data as well as randomly generated data sets. Results of the simulation experiments show that the suggested method performs better than a method suggested in other research and the one that has been used in practice.

DC Microgrid Operational Method for Enhanced Service Reliability Using DC Bus Signaling

  • Hwang, Pyeong-Ik;Jang, Gilsoo;Pyo, Gi-Chan;Han, Byung-Moon;Moon, Seung-Il;Ahn, Seon-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.2
    • /
    • pp.452-464
    • /
    • 2015
  • This paper proposes a DC microgrid operational strategy and control method for improved service reliability. The objective is to supply power to as many non-critical loads as possible, while providing an uninterrupted power supply to critical loads. The DC bus signaling method, in which DC voltage is an information carrier, is employed to implement the operational strategy in a decentralized manner. During grid-connected operation, a grid-tied converter balances the power of the microgrid by controlling the DC voltage. All loads are connected to the microgrid, and operate normally. During islanded operation, distributed generators (DGs), a backup generator, or an energy storage system balances the power. However, some non-critical loads may be disconnected from the microgrid to ensure the uninterrupted power supply to critical loads. For enhanced service reliability, disconnected loads can be automatically reconnected if certain conditions are satisfied. Control rules are proposed for all devices, and detailed microgrid operational modes and transition conditions are then discussed. Additionally, methods to determine control parameter settings are proposed. PSCAD/EMTDC simulation results demonstrate the performance and effectiveness of the proposed operational strategy and control method.

Analysis of Slot Leakage Reactance of Submersible Motor with Closed Slots during Starting Transient Operation

  • Bao, Xiaohua;Di, Chong;Fang, Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.135-142
    • /
    • 2016
  • Generally, closed slots are adopted to reduce the water friction loss in both the stator and the rotor of water filling submersible motor due to the special environment of operation. One of the obvious differences between the traditional induction motors and water filling submersible motors is that the submersible motors only need relatively smaller starting torque. This paper aims to analyze the slot leakage reactance of water filling submersible motor during starting transient operation. An improved analytical method which considered the magnetic saturation of the slot bridge and the skin effect of rotor bars is proposed. The slot permeance factor which has a direct impact on the slot leakage reactance is calculated. Then finite element models with different stator slot types are constructed and search coils are introduced to measure the slot flux linkage. Moreover, the starting performances of the models with two typical stator slots are compared and the flux leakage characteristics are obtained. Finally, the results obtained by finite element method are very close to the results obtained by analytical method.

Outage restoration in electric distribution system using Dijkstra algorithm (Dijkstra 알고리즘을 이용한 배전계통에서의 사고복구)

  • Kim, Hoon;Jeon, Young-Jae;Lee, Seung-Yun;Kim, Jae-Sung;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1416-1418
    • /
    • 1999
  • This paper presents a restoration method by using Dijkstra algorithm for outage restoration problems in distribution system that considering load capacity constraints and operation constraints. Restoration problem in distribution system is difficult to solve problem in a short times, because of a distribution system that supplies power for customers combined with many tie-line switches and sectionalizing switches and have to satisfy plenty of operation conditions. Therefore, this paper applied Dijkstra algorithm which is satisfy radial operation conditions in distribution system. This proposed method used Kruskal algorithm include to Dijkstra algorithm Therefore, proposed method is restored to a outage sections in a short times and just then to satisfied with a operation conditions in distribution system. A 26-bus, 31-branch model system is used to demonstrate the effectiveness of the proposed method.

  • PDF

Capacitance Estimation Method of DC-Link Capacitors for BLDC Motor Drive Systems

  • Moon, Jong-Joo;Kim, Yong-Hyu;Park, June-Ho;Kim, Jang-Mok
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.653-661
    • /
    • 2016
  • This paper proposes a capacitance estimation method of the dc-link capacitor for brushless DC motor (BLDCM) drive systems. In order to estimate the dc-link capacitance, the BLDCM is operated in quadrant-II or -IV among four-quadrant operation. Quadrant-II and -IV are called reverse braking and forward braking, respectively. During the braking operation of the BLDCM, the capacitor is charged by the phase current and then the voltage is increased during the braking operation time. The capacitor current and voltage can be obtained by using the phase current sensor of BLDCM and the dc-link voltage sensor. The capacitance and be easily obtained by the voltage equation of the capacitor. The proposed method guarantees the reliable and simple calculation of the dc-link capacitance without additional hardware system except several the sensors already installed for the motor control system. The effectiveness of the proposed method is verified through both the simulation and experimental results.

A Study on the Compensation Method for Unbalance Parallel Operation of Parallel Connected Thyristor Dual Converters using Circulating Current (순환 전류를 이용한 병렬 연결된 사이리스터 듀얼 컨버터의 불균형 병렬 운전 보상 기법에 관한 연구)

  • Kim, Sung-An;Han, Sung-Woo;Moon, Dong-Ok;Kim, Young-Woo;Lee, Chang-Hee;Cho, Yun-Hyun
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.21 no.6
    • /
    • pp.473-480
    • /
    • 2016
  • This study proposes a performance improvement for parallel-connected thyristor dual converters using a circulating current with an unbalanced parallel operation compensator. The proposed control method determines a variable reference value for the voltage PI controller according to voltage error at firing angle control applied to a difference current control. This method uses circulating current control to maintain a stable voltage and excellent current response during parallel operation. The effectiveness of the proposed control is verified with a simulation and an experiment based on the comparison of the performance of the proposed control method with other conventional methods.

Detection of Voltage Sag using An Adaptive Extended Kalman Filter Based on Maximum Likelihood

  • Xi, Yanhui;Li, Zewen;Zeng, Xiangjun;Tang, Xin
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.3
    • /
    • pp.1016-1026
    • /
    • 2017
  • An adaptive extended Kalman filter based on the maximum likelihood (EKF-ML) is proposed for detecting voltage sag in this paper. Considering that the choice of the process and measurement error covariance matrices affects seriously the performance of the extended Kalman filter (EKF), the EKF-ML method uses the maximum likelihood method to adaptively optimize the error covariance matrices and the initial conditions. This can ensure that the EKF has better accuracy and faster convergence for estimating the voltage amplitude (states). Moreover, without more complexity, the EKF-ML algorithm is almost as simple as the conventional EKF, but it has better anti-disturbance performance and more accuracy in detection of the voltage sag. More importantly, the EKF-ML algorithm is capable of accurately estimating the noise parameters and is robust against various noise levels. Simulation results show that the proposed method performs with a fast dynamic and tracking response, when voltage signals contain harmonics or a pulse and are jointly embedded in an unknown measurement noise.

Optimal Coefficient Selection of Exponential Smoothing Model in Short Term Load Forecasting on Weekdays (평일 단기전력수요 예측을 위한 최적의 지수평활화 모델 계수 선정)

  • Song, Kyung-Bin;Kwon, Oh-Sung;Park, Jeong-Do
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.2
    • /
    • pp.149-154
    • /
    • 2013
  • Short term load forecasting for electric power demand is essential for stable power system operation and efficient power market operation. High accuracy of the short term load forecasting can keep the power system more stable and save the power market operation cost. We propose an optimal coefficient selection method for exponential smoothing model in short term load forecasting on weekdays. In order to find the optimal coefficient of exponential smoothing model, load forecasting errors are minimized for actual electric load demand data of last three years. The proposed method are verified by case studies for last three years from 2009 to 2011. The results of case studies show that the average percentage errors of the proposed load forecasting method are improved comparing with errors of the previous methods.

A Study on the Charge of Water Quality in the Vicinity of Mokpo Harbor due to the Discharges from Yongsan River Estuary Weir and Yongam-Kumho Sea Dike (영산강 하구둑과 영얌-금호방조제 방류에 의한 목포항 주변 수역의 수질변화에 관한 연구)

  • 정대득;이중우;국승기
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.253-261
    • /
    • 1999
  • It is essential for port planning, coastal zone management and environmental impact study to analyze the variation of current and water quality due to the development of water area and discharged water from the estuary barrage and basin, etc. Mokpo sea area has downstream from a long river and two large basins, the Yongsan river and Yongam-Kumho basins, discharging much of water through water gates for the purpose of flood and prohibition of salt intrusion to the inland fresh water area. In this study, the numerical calculation were carried out for the analysis of diffusion characteristics due to discharging operation, adopting the results of tidal current simulation. ADI method is applied to the governing equation for the movement of sea water and diffusion and 6-point method to the advection terms of diffusion equation. As the results of this study, it is known that the discharging operation causes increasing and/or decreasing of current velocity and enlarging and/or depressing of pollutant diffusion limits depending on the distance from the discharging gates and the modes of discharging operation. To utilize these result, the linked gate operation and the method increasing exchange of sea water must be considered.

Parallel Operation of Three-Phase Bi-Directional Isolated Interleaved DC-DC Converters for The Battery Charge/Discharge System (배터리 충·방전기 시스템에 적용되는 3상 양방향 절연형 인터리브드 DC-DC 컨버터의 병렬운전)

  • Jo, Hyunsik;Lee, Jaedo;Cha, Hanju
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.19 no.1
    • /
    • pp.15-22
    • /
    • 2014
  • Recently, parallel operation of dc-dc converters has been widely used in distributed power systems. In this paper, a control method to achieve parallel operation of three-phase bi-directional isolated interleaved dc-dc converters is discussed for the battery charging and discharging system which consists of the 32 battery charger/dischargers and two three-phase bi-directional isolated interleaved dc-dc converters. In the boost mode, the battery energy is delivered to the grid, whereas the grid energy is transferred to the battery in the buck mode operation. The average current sharing control method is employed to obtain an equal conducting of each phase current in the three-phase dc-dc converter. By using the proposed method, the imbalance factor is gratefully reduced from 8 percent to 1 percent. Two 2.5kW three-phase bi-directional dc-dc converter prototype have been built and the proposed method has been verified through experiments.