• Title/Summary/Keyword: Operation Management System

Search Result 4,280, Processing Time 0.151 seconds

Design and Verification of Advanced Distribution Management System using Information and Communication Convergence Technology (ICT융복합 기술을 이용한 차세대 배전계통 운영 시스템 설계 및 검증)

  • Kim, Dongwook;Park, Youngbae;Chu, Cheolmin;Jo, Sungho;Seo, Inyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.15 no.4
    • /
    • pp.19-29
    • /
    • 2019
  • Recently, with the rise of environmental issues and the change of government policy (Renewable Energy 3020 Implementation Plan), a large amount of renewable energy such as solar and wind power is connected to the power system, and most of the renewable energy is concentrated in the power distribution network. This causes many problems with the voltage management and the protection coordination of the grid due to the its intermittent power generation. In order to effectively operate the distribution network, it is necessary to deploy more intelligent terminal devices in the field to measure the status of the distribution network and develop various operation functions such as visualization and big data analysis to support the power distribution system operators. In addition, the failover technology must be supported for the non-stop operation of the power distribution system. This paper proposes the system architecture of new power distribution management system to cope with high penetration of renewable energy. To verify the proposed system architecture, the functional unit test and performance measurement were performed.

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

An Expert System for Reliability Management (신뢰성 관리 전문가 시스템)

  • Kim, Seong-in;Chang, Hong S.
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.3
    • /
    • pp.152-160
    • /
    • 1994
  • This paper concerns an expert system for reliability management. The system includes data base, life data analysis, life testing sampling plans and system operation. PROLOG is used as a language with dBASE III+ for the data base management system and C for calculations and graphics. This system analyzing the data and selecting an appropriate sampling plan can be implemented on an IBM PC 386 or a higher level machine.

  • PDF

Design of Monitoring System for Integrated Management of On-site Wastewater Treatment Plants and Development of its Operation Program (소규모 현장 오수처리시설의 통합관리를 위한 모니터링 시스템 설계 및 운영 프로그램 개발)

  • Cho, Young-Hyun;Kwun, Soon-Kuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.137-140
    • /
    • 2002
  • The monitoring system for integrated management of on-site wastewater treatment plants(biofilter) was designed and its operation program was developed. In design process, the research on monitoring parameters which will be able to represent condition and operation of the pilot plants was accomplished, and these parameters came to reveal with ORP(Oxidation-Reduction Potential), water level, pump and power on/off. Proposed monitoring system is composed with measurement, control, communication and display device, and PCB(Prototype Circuit Boards) and microcontroller (PIC16F877) technique are applied to its design of control device for performing specific function. also, The operation program of PC setup is developed in order to provide a convenience to the manager.

  • PDF

Analysis of a Production Systems with Early Set-up and Post-operation (조기 준비기간과 후공정을 갖는 생산시스템의 분석)

  • ;;;Kim, S. C.;Yoon, S. H.;Park, N. I.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.3
    • /
    • pp.99-111
    • /
    • 1997
  • We consider a production system with post-operation and early set-up. As soon as there are no more units(raw materials) to process and the machine becomes idle, it undergoes a post-operation. After the post operation, if the number of waiting units is greater than or equal to m, it begins a set-up. After the set-up, if the number of units is greater than or equal to N($\geq$m), it begins to process the units. We first analyze the system by employing the decomposition property of the vacation queue. We, then, propose an algorithm that finds the optimal threshold values ($m^*$, $N^*$). Finally we present some numerical examples and interprete the system behavior.

  • PDF

- Optimizing Gate Assignment and Operation Support System for Reliability Improvement of Airport - (공항의 신뢰성 향상을 위한 최적 주기장 배정과 운영지원시스템)

  • Lee Hee Nahm;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.4
    • /
    • pp.215-226
    • /
    • 2004
  • This study develops a improved gate assignment algorithm and decision support system using its algorithm to extract a assignment result minimizing a walking distance of passengers in airport and maximizing the utilization rate of avaliable gates in domestic airports. By operation support system, it may contribute greatly in efficient enlargement of airport operation and increase the airport reliability through quickly coping with takeoff and landing delay of flight due to weather change, preservation and repair of gate, etc. Also, passengers who use airport terminal can minimize time and walking distance for departure, arrival, and transit, and it may greatly reduce the additional operation cost for common gates through maximizing the utilization rate for exclusive usage gates for airplanes which use gates.

Optimizing Gate Assignment and Operation Support System for Reliability Improvement of Airport (공항의 신뢰성 향상을 위한 최적 주기장 배정과 운영지원시스템)

  • Lee HeeNahm;Lee ChangHo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.221-227
    • /
    • 2004
  • This study develops a improved gate assignment algorithm and decision support system using its algorithm to extract a assignment result minimizing a walking distance of passengers in airport and maximizing the utilization rate of avaliable gates in domestic airports. By operation support system, it may contribute greatly in efficient enlargement of airport operation and increase the airport reliability through quickly coping with takeoff and landing delay of flight due to weather change, preservation and repair of gate, etc. Also, passengers who use airport terminal can minimize time and walking distance for departure, arrival, and transit, and it may greatly reduce the additional operation cost for common gates through maximizing the utilization rate for exclusive usage gates for airplanes which use gates.

  • PDF

A Study on the Actual Operation condition of Integrated Management System (통합(統合) 경영(經營)시스템의 운영실태(運營實態)에 관한 연구(硏究))

  • Yoo, Young-Jun;Lee, Yong-Hwa;Kim, Kwang-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.289-307
    • /
    • 2009
  • This study presented a model of enterprise that operates an integrated system, and studied about an integrated element of ISO 9001:2000 and ISO 14001:2004 standard. In addition to this, it grasped what the obstacle elements are in use of an integrated system, and analyzed the effect in use of an integrated system through the survey on 58 enterprises that operate an integrated system, From the result of this study, we have known that the obstacle elements in operation of an integrated system are in lack of understanding of process, in lack of execution ability of system, in unfamiliarity of system and lack of willingness of the executives.

  • PDF

Development of Standard Operation System of Emergency Restoration for Railway Accidents (철도사고유형별 임시복구 표준운영체계(안) 개발)

  • Park, Yong-Gul;Sung, Deok-Yong;Choi, Sung-Yong;Suh, Sang-Kyo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.819-828
    • /
    • 2009
  • This paper suggests to standardize railway accident restoration types as the code and standard operation system for efficient railway accident management. First of all, the damage types of have been carefully analyzed and reclassified. This study suggested the combination of 3 distinct code factors: restoration class, restoration object, and restoration location to standardize them. In addition, this study suggested procedures to make the standard operation system of emergency restoration, defined the worst case of emergency restoration and the important events. Therefore, the standard operation system of emergency restoration is developed. It shall play a major role as the database system for railway accident management, minimum of damage and rapid control of accident.

The Impact of Capacity Flexibility in a Rental Operation on the Financial Performance (렌탈 운영에서 용량 유연성 확보가 기업의 수익성에 미치는 영향)

  • Kim, Eungab
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.4
    • /
    • pp.153-165
    • /
    • 2014
  • We present a new framework for rental capacity management in which rental capacity is dynamically managed by means of temporary inventory addition/return. While serving customers with its own (native) capacity, the rental firm rents additional rental capacity from an upper echelon rental company so that it can avoid lost sales which may occur when stock is not sufficient, and returns it when stock becomes sufficiently large enough to cope with demands. Formulating the model as a Markov decision process, we investigate a flexible capacity addition/return policy that maximizes the firm's profit with respect to system costs. Numerical study indicates that rental operation with capacity addition/return can be economically favorable over rental operation without capacity expansion/return and can contribute the reduction in the size of native rental capacity.