• Title/Summary/Keyword: Operation Interruptions

Search Result 22, Processing Time 0.022 seconds

A Study on Minimization of Train Delays and Train Operation Interruptions by RF Transmission System. (RF 통신시스템을 이용한 열차 운행중단 및 열차 지연의 최소화에 관한 연구)

  • Lee, We-Jae;Kook, Kwaung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1466-1472
    • /
    • 2008
  • To minimize the train operation interruptions and train exchanges, the RF transmission system is proposed. The current control room of the Seoul Metro has information of the train movement through the Total Traffic Control System, but it does not have information of the train itself, rail status, and other facilities' status. When some trouble occurs during train operation, the train crews should report the control room about the trouble and fix it. If the control room has exact information of the trouble, the expert in the control room can help the crews to fix the trouble swiftly and exactly. Since the crews are busy taking care of the trouble, they often miss to report the control room on time. The proposed RF transmission system relays the information of the train to the control room automatically in real time, and makes it possible to provide the passengers good service by reducing the train operation interruptions and train exchanges.

  • PDF

Stability of Sampled-Data Control Systems with Computer Interruptions (투명 PLZT 세라믹의 전기적 및 광 메모리 특성)

  • Jang, Seong-Whan
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.7
    • /
    • pp.476-483
    • /
    • 1987
  • This paper analyzes centralized sampled-data control systems with feedback loops which are closed through a digital computer which generates deadbeat control law. Intermittant computer interruptions result in failure to update the desired deadbeat design procedures for the deadbeat control law under normal operation of the control computer and the assumption of any admissible computer interruption are resented. A method that guarantees asymptotic stability under all admissible computer interruptions also is presented.

  • PDF

Reasons, Incidences, and Influencing Factors of Work Interruptions in Intensive Care Unit Nurses (중환자실 간호사에게 발생하는 업무 흐름 중단 이유와 발생빈도 및 영향요인)

  • You, Jung Eun;Lee, Eun Nam
    • Journal of muscle and joint health
    • /
    • v.27 no.3
    • /
    • pp.247-254
    • /
    • 2020
  • Purpose: This was a descriptive observational study examining the reasons for, frequency of, and factors affecting work interruption among intensive care unit (ICU) nurses. Methods: Convenience sampling was used to recruit 46 regular nurses who had been working in an ICU at D tertiary hospital in B metropolitan city for at least six months. To measure the degree of work interruption, this study revised a tool used by Brixey et al. (2007) for analyzing the type of work interruption. Results: A total of 1,787 work interruptions occurred during 368 hours of observation, i.e., at an average of 4.85 times per hour. Communication-related factors caused work interruption most frequently, followed by environmental, work-related, and personal factors. As for the work-related characteristics of nurses, participants experienced work interruption more frequently while working on weekdays, when the medical staff were stationed, than on weekends. Conclusion: ICU nurses experienced work interruption frequently. With the health care system expected to become more complicated in the future, efforts should be made to reduce unnecessary work interruptions to improve the operation efficiency of ICUs.

A Study on Prediction of Suspension Time of Unmanned Light Rail according to Safety Personal Deployment (안전요원 배치 여부에 따른 무인운전 경전철의 운행중단 시간예측 연구)

  • Sang Log Kwak
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.1
    • /
    • pp.87-92
    • /
    • 2023
  • The number of unmanned light rail train operators is continuously increasing in Korea. In a failure event during an operation due to the nature of the unmanned operation, recovery is performed based on the remote control. However, if remote recovery is not feasible, safety personnel arrive at the train to resume the train operation. There are regulations on safety personnel and the suspension time of the train operation. However, there is currently no rule for safety personnel deployment. Currently, railway operating organizations operate in three scenarios: safety personnel on board trains, stationed at stations, and deployed at major stations. Four major factors influence the downtime for each emergency response scenario. However, these four influencing factors vary too much to predict results with simple calculations. In this study, four influencing factors were considered as random variables with high uncertainty. In addition, the Monte Carlo method was applied to each scenario for the safety personnel deployment to predict train service downtime. This study found a 17% difference in train service suspension by safety personnel deployment scenario. The results of this study can be used in setting service goals, such as standards for future safety personnel placement and frequency of service interruptions.

Performance Evaluation with Protective Function test of Inverter for Solar Power Generation (태양광발전용 인버터 보호기능시험 성능평가)

  • Yoon, Yong-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1570-1575
    • /
    • 2018
  • The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. This paper describes domestic technical standard of Photovoltaic(PV) PCS(Power Conditioning Systems)- Characteristics of the utility interface. Especially protective function test items of 1) Output overvoltage protection test, 2) Output undervoltage protection test, 3) Frequency rise protection test, 4) Frequency fall protection test, 5) System voltage's momentary interruptions, 6) System voltage distortion capability test. Therefore in this paper protective function test item of facilities evaluation detailed standards for new renewable energy, small, medium and large photovoltaic inverter standard is studied and analyzed and finally full tested by PV inverter performance function.

Cause Analysis and Improvement of Signal Interference in Byteflight Data Bus

  • Kwon, Jung-Hyuk;Tak, Su-Pyeong;Kwon, Ik-Hyun;Lee, Wang-Sang
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.6
    • /
    • pp.50-58
    • /
    • 2021
  • Byteflight is developed based on RS-485 communication (an international standard), and it can be used as a data bus during the operation of an integrated avionics system in the latest aircraft. Therefore, the integrated avionics system can perform an effective and safe flight mission only when the accurate and seamless display of flight information, communication, and accurate functions of navigation are implemented. In this study, cause analysis and failure investigation were performed on screen abnormalities and communication interruptions due to signal interference in the Byteflight data bus of the integrated avionics system during aircraft operation. To improve signal interference between avionics units, the branch point and wiring path of the Byteflight data bus were changed, and the verification result of the improved method was also described.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

Analysis of a Fault Characteristics in the Power Network with Distributed Generators (분산전원 연계 배전계통의 사고 특성 분석)

  • Jang, Sung-Il;Park, Je-Young;Choi, Jeong-Hwan;Jeong, Jong-Chan;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.65-68
    • /
    • 2002
  • Distributed Generators (DG) are rapidly increasing and most of them are interconnected with distribution network to supply power into the network. Therefore, DG may make significant impacts on distribution system operation. protection, and control with respect to the voltage regulation, voltage flicker, harmonics, fault current levels, the losses of the network, etc. These impacts would be demerits for both of DG and distribution networks. And the operation of DG may be influenced by the abnormal grid condition such as disturbances occurred in the neighboring distribution feeders as well as the feeder directly connected with DG. This paper describes the influence of fault occurred in the interconnected power network on the DG operation and the impact of DG on the network load during the interruptions of utility power.

  • PDF

Evaluation on Chemical Cleaning Efficiency of Organic-fouled SWRO Membrane in Seawater Desalination Process (해수담수화 공정에서 역삼투막의 유기 막오염에 대한 SWRO 막의 화학세정 효율 평가)

  • Park, Jun-Young;Hong, Sung-Ho;Kim, Ji-Hoon;Jeong, Woo-Won;Nam, Jong-Woo;Kim, Young-Hoon;Jeon, Min-Jung;Kim, Hyung-Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.2
    • /
    • pp.177-184
    • /
    • 2011
  • Membrane fouling is an unavoidable phenomenon in operation of seawater reverse osmosis (SWRO) and major obstacle for economic and efficient operation. When fouling occurs on the membrane surface, the permeate flux is decreased, on the contrary, the trans-membrane pressure (TMP) is increased, therefore operation and maintaining costs and potential damage of membranes are able to the pivotal risks of the process. Chemical cleaning process is essential to prevent interruptions for effective RO membrane filtration process. This study focused on proper chemical cleaning condition for polyamide RO membranes of 4 companies. Several chemical agents were applied for chemical cleaning under numbers of operating conditions. Additionally, a monitoring tool of FEEM as autopsy analysis method is adapted for the prediction of organic bio-fouling.

Implementation of inside the computer power supply with UPS (UPS 기능을 갖는 내장형 컴퓨터 전원장치의 구현)

  • Lee S. R.;Ko S. S.;Mun J. M.;Kwon H. D.
    • Proceedings of the KIPE Conference
    • /
    • 2003.11a
    • /
    • pp.202-205
    • /
    • 2003
  • Recently, UPS(Uninterruptible Power Supply) have been largely used to improve power souse quality as well as to protect critical loads such as computer, industrial system, medical equipment, etc, against power outage by providing clean and uninterrupted power under power supply disturbance or interruptions. But UPS is bulky because used battery. So, UPS size issue have received attention in the power electronics industry. Therefore, this paper proposed a implementation of inside of the computer power supply with UPS by the one-chip microprocessor to minimize UPS size. To verify the proposed power supply, the detail simulation and experiment results indicate that high-frequency switching and operation UPS can be achieved.

  • PDF