• Title/Summary/Keyword: Operation Allocation

Search Result 408, Processing Time 0.028 seconds

Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost (분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정)

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Lee, Woo-Ri;Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

Job Allocation and Operation Scenario of Automated Material Handling for Cluster-Type Production System (클러스터 제조 라인의 작업할당 및 물류 운영 시나리오)

  • Yoon, Hyun-Joong;Kim, Jin-Gon;Kim, Jung-Yun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.169-175
    • /
    • 2010
  • Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocation and operation method of automated material handling for cluster-type production systems. First of all, the control problems of the automated material handling systems are classified into the control problem of inter-cluster material handling system and that of intra-cluster material handling system. Then, a distributed agent-based control scheme is proposed for the former, and an operational control procedure for the latter. Simulation experiment shows that the proposed method is efficient in reducing cycle times and improving utilization of material handling vehicles.

A Design of XG-PON Architecture based on Next Generation Network Model for Supporting Dynamic Quality of Service (동적 QoS 지원을 위한 NGN 모델 기반 XG-PON 구조 설계)

  • Lee, Young-Suk;Lee, Dong-Su;Kim, Young-Han
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.49 no.1
    • /
    • pp.59-67
    • /
    • 2012
  • In this paper, we designed an inter-operation architecture of 10G G-PON(Gigabit passive optical network) network and NGN(Next generation network) architecture. And, we proposed mechanism of dynamic GEM(G-PON encapsulation mode) Port-ID allocation. This is able to solve a problem of 10G G-PON inter-operation. The mechanism of dynamic GEM Port-ID allocation has OMCI(ONT management control and interface) mapping table for IP address and port number. That architecture is able to support per flow QoS(Quality of service) as well as QoS of NGN requirement. So that can improve the resource efficiency of QoS than the existing G-PON architecture.

A Study on the Allocation Planning of Community Based Elderly Welfare Facilities - Focused on Urban Area - (일상생활권을 고려한 지역밀착형 노인복지시설의 배치계획에 관한 연구 -도시지역을 중심으로-)

  • Jeon, Sung-Min;Kwon, Soonjung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.15 no.4
    • /
    • pp.33-43
    • /
    • 2009
  • As a result of rapid aging speed in our society, many problems related to elderly people have happened in many parts of our society. Among them, supply for elderly housing is one of the biggest problems. To solve these problems, 'long-term care insurance' has been put in operation from July 2008. By the time of the insurance operation, Ministry of Health and Welfare is increasing facilities every year according to '10-year expending plan of Care service infra' from 2002. As a result, the supply rate of elderly facilities has been raised. But the differences of facility supply rate between regions are very high in some cases. Therefore older people who need care sometimes cannot get proper care services in some areas. In that case, the frail older people have to use other care facilities of other regions. This is not a proper situation from the point of "Aging in Place". In order to prevent that case, it is necessary to set up proper 'Daily Living Spheres' and establish elderly care plan for it. Considering the points above, this study proposes the size of 'Daily Living Spheres' for the elderly, the kind and amount of elderly care facilities in it for the construction of Community Based Elderly Care System.

  • PDF

Implementation of a MAC protocol in ATM-PON

  • Kim, Tea-Min;Shin, Gun-Soon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.3
    • /
    • pp.586-597
    • /
    • 2004
  • MAC (Medium Access Control) protocol is necessary for a OLT (Optical Line Termination) to allocate bandwidth to ONUs (Optical Network Units) dynamically in ATM PON (Passive Optical Network) operated in a kind of optical subscriber network having tree topology. The OLT collect information about ONUs and provide all permission with each ONU effectively by means of MAC protocol. Major functions of MAC protocol are composed of the algorism for distributing permission demanded by a ONU dynamically and allocation all permission used in APON properly. Sometimes MAC get to be a element of limiting the whole operation speed and occupy a most frequent operation part of the TC (Transmission Convergence) function module so it have to be designed to guarantee the best quality for each traffic. This paper introduce the way of implementation of a algorism which satisfy all of the upper renditions. This MAC algorism allocate bandwidth according to a number of working ONU and the information of the queue length dynamically and distribute permission for same interval to minimize delay variation of each ONU cell. MAC scheduler for the dynamic bandwidth allocation which is introduced in this paper has look-up table structure that makes programming possible. This structure is very suitable for implementation and operated in high speed because it require very simple and small chip size.

A Study on a Conceptual Design for a Simulation Model to Enhance the Airport SLOT Allocation Problem for a Single Airport (공항 슬롯 배분 개선을 위한 시뮬레이션 모형 기본 설계에 관한 연구: 단일 공항을 중심으로)

  • Bomi Park;Daekyum Lee;Junhyuk Kim;Seokjae Yun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.32 no.1
    • /
    • pp.61-70
    • /
    • 2024
  • In response to the continuously increasing demand for air travel, various studies are being conducted. This research focuses on the design of a simulation model for improving airport slot allocation in the strategic phase. It addresses three aspects of model design, introducing considerations such as the objective function. Additionally, it explains the conceptual procedures for the overall simulation operation and detailed processes within the model including input and output data. Emphasizing the SAL, this study excludes policy and qualitative judgments from its scope. The target airport for application will be confirmed in future research. This study marks a crucial first step toward optimizing air traffic flow, with expectations of contributing to the enhancement of operational efficiency at airports.

A Study on the Preplanned Target Allocation Problem for Minimizing Fire Time of Field Artillery (포병부대 계획표적 사격시간 단축을 위한 표적할당에 관한 연구)

  • Hwang, Won-Shik;Chun, Youn-Hwan;Phak, Hyon-Su;Youn, Sang-Heom
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.1
    • /
    • pp.15-27
    • /
    • 2010
  • Fire sequencing problem is to find a sequence of firing on the targets. The latest, because the korea artillery force is inferior in number as compared with north korea force. It is an important question to give a fatal damage to the enemy force by using prompt and accurate fire in order to overcome the lack of artillery force. Minimizing the fire finishing time will secure the adapt ability in tactical operation. In this paper, we developed a mathematical model to do allocation the fire on the targets to decrease to total fire operation time. In order to work out the fire sequencing problem, MIP is developed and the optimum solution is obtained by using ILOG OPL. If this analytical model is applied to the field artillery unit, it will improve the artillery fire force enhancement.

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

Bus and Registor Optimization in Datapath Synthesis (데이터패스 합성에서의 버스와 레지스터의 최적화 기법)

  • Sin, Gwan-Ho;Lee, Geun-Man
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.8
    • /
    • pp.2196-2203
    • /
    • 1999
  • This paper describes the bus scheduling problem and register optimization method in datapath synthesis. Scheduling is process of operation allocation to control steps in order to minimize the cost function under the given circumstances. For that purpose, we propose some formulations to minimize the cost function for bus assignment to get an optimal and minimal cost function in hardware allocations. Especially, bus and register minimization technique are fully considered which are the essential topics in hardware allocation. Register scheduling is done after the operation and bus scheduling. Experiments are done with the DFG model of fifth-order digital ware filter to show its effectiveness. Structural integer programming formulations are used to solve the scheduling problems in order to get the optimal scheduling results in the integer linear programming environment.

  • PDF

Optimal buffer allocation of the solenoid production line using simulation (시뮬레이션 모델 구축과 분석을 통한 솔레노이드 생산라인의 최적 버퍼 할당)

  • Kim, Young-Jin;Noh, Sang-Do;Mun, Joung-H.
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.4
    • /
    • pp.51-60
    • /
    • 2008
  • The purpose of this study is the use of simulation modelling to enhance productivity. In this paper, the optimal buffer allocation of small and medium size industries which produce solenoid valves for automobiles, is performed using simulations. The simulation model was developed under considerations of production layout, process & operation, process time, total work time, WIP, utilization, failure rate, and operation efficiency as inputs, and it was validated with careful comparisons between real behaviors and simulation outputs of the production line. Therefore, we can evaluate effects and changes in productivity when some strategies and/or crucial factors are changed. Although too large buffer could decrease productivity, the solenoid production line in this paper has been maintained large buffer. It is because reducing the size of buffer could result in the termination of the process. We determined the optimal number of buffers that could not cause any interrupt in productions using simulations. This simulation model considers diverse input variables which could influence productivity, and it is very useful not only for the production line of solenoid valves, but also for other production lines with various purposes, especially, small and medium size industries.

  • PDF