• Title/Summary/Keyword: One Road

Search Result 1,610, Processing Time 0.023 seconds

Three Dimensional Tracking of Road Signs based on Stereo Vision Technique (스테레오 비전 기술을 이용한 도로 표지판의 3차원 추적)

  • Choi, Chang-Won;Choi, Sung-In;Park, Soon-Yong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.12
    • /
    • pp.1259-1266
    • /
    • 2014
  • Road signs provide important safety information about road and traffic conditions to drivers. Road signs include not only common traffic signs but also warning information regarding unexpected obstacles and road constructions. Therefore, accurate detection and identification of road signs is one of the most important research topics related to safe driving. In this paper, we propose a 3-D vision technique to automatically detect and track road signs in a video sequence which is acquired from a stereo vision camera mounted on a vehicle. First, color information is used to initially detect the sign candidates. Second, the SVM (Support Vector Machine) is employed to determine true signs from the candidates. Once a road sign is detected in a video frame, it is continuously tracked from the next frame until it is disappeared. The 2-D position of a detected sign in the next frame is predicted by the 3-D motion of the vehicle. Here, the 3-D vehicle motion is acquired by using the 3-D pose information of the detected sign. Finally, the predicted 2-D position is corrected by template-matching of the scaled template of the detected sign within a window area around the predicted position. Experimental results show that the proposed method can detect and track many types of road signs successfully. Tracking comparisons with two different methods are shown.

The Effect of Urban Road Vegetation on a Decrease of Road Surface Temperature (도시도로 녹지의 도로 표면온도 져감 효과에 관한 연구)

  • Cha, Hye-Jin;Lim, Ji-Hyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.107-116
    • /
    • 2011
  • One of the major factors which increase urban temperature is roads. This paper is aimed to investigate the effect of urban roadside vegetation on the road surface temperature. For this, surface temperature was measured at 18 spots using the thermal imaging camera in terms of road components including use of roadside land use, roadway, sidewalk, roadside vegetation and vegetation median barrier. The size of the roadside vegetation and related urban road characteristics were also measured. In terms of the effect of roadside vegetation on a decrease in road surface temperature, the roadside land use as a green area or open space was the highest, followed by the size of vegetation median barrier and the size of roadside vegetation. Besides road surroundings, an increase in the green zone such as roadside vegetation and median strip vegetation has a significant impact on lowering road surface temperature. Therefore, a good solution for reducing urban heat island effects would be to increase the area of roadside vegetation and green areas along roads.

Experimental Analysis of Bounce, Roll and Pitch Frequencies of Major Systems of a Large Truck using a Multi-axial Road Simulator (다축 로드 시뮬레이터를 이용한 대형트럭 주요 시스템의 바운스와 롤 및 피치 주파수의 실험적 분석)

  • Moon, Il-Dong;Oh, Chae-Youn
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.8 s.173
    • /
    • pp.128-135
    • /
    • 2005
  • This paper presents a scheme for experimentally analyzing bounce, roll and pitch frequencies of major systems of a large truck using a multi-axial road simulator. The excitation input (amplitude and frequency range) fur a frequency response test with the multi-axial road simulator is selected in order that bounce, roll and pitch modes are not coupled each other, the excitation amplitude can be reproduced in a specified excitation frequency range, and tires do not lose contact with posters. Three accelerometers, one gyroscope and four displacement meters are used in the frequency response test using the multi-axial road simulator. The reliability of the presented bounce mode frequency response test scheme is validated by comparing the result from a test using the multi-axial road simulator with the result from a road driving test. The road driving test is performed with velocities of 20km/h and 30km/h, and in an unladen state. The vertical accelerations at the cab and the front axle are measured in the road driving test. The roll and pitch mode frequency response tests are also performed with the presented frequency response test scheme. Roll and pitch frequencies of major systems of a large truck that are hard to acquire from a road driving test are analyzed as well as bounce frequency.

Landscape Changes Assessment of the National Road-Focused on the National Road in Suburb Areas- (국도의 경관변화 평가-교외지역 국도를 중심으로-)

  • 홍영록;권상준;조태동
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.1
    • /
    • pp.92-102
    • /
    • 2004
  • In this study, landscape changes were examined by periods through the analysis of visual quantity on the landscape components of national road including the mountains, the sky, road pavements, street trees, paddy fields and dry fields, billboard, telegraph pole, building, structure, slope, guard fence, soundproof wall, and median strip etc. For this, subject national road in suburb arreas was selected to grasp its landscape characteristics, and divisional criteria of landscape type of the national road were suggested to look into the trend of landscape changes by periods. Findings of this study are as follows:1.Divisional criteria of landscape type of the national road include location and geometry, structure, land use, perspective, and surrounding buildings of the national road. 2.The highest visual quantity was found in road pavements by periods among landscape components of the national road. It was found that this result has a thread of connection with previous study emphasizing the importance of road geometry as one of landscape components, and road geometry shall be regarded as a visually significant component in analyzing and evaluating landscape of the national road. 3.Most distinguished factors of landscape changes of the national road by periods were median strip(F=33.296) and street tree(F=32.881), and then the sky(F=24.735) and mountain(F=23.477) showed similar level of statistically significant difference. However, statistically significance difference was not found in buildings and structures. 4.It was shown that natural elements decreased gradually but structural landscape made of artificial elements became the main in construction of the national road. This result implies that although the scenic and ecological soundness is recognized in construction of the national road, it is not out of the limitation of functionalities that is, access and mobility.

The Transitional Process of Spatial Configuration of Existing Old Settlements in Cheongju City - with Case Study on Topdong 'Yangdalmal' - (청주 원도심 내 현존하는 옛마을의 공간구성 변화 - 탑동 '양달말'을 대상으로 -)

  • Kwon, Mi-Sun;Kim, Tai-Young
    • Journal of the Korean housing association
    • /
    • v.22 no.2
    • /
    • pp.91-99
    • /
    • 2011
  • The purpose of this study is to clarify the transitional process of spatial configuration of 'Topdong Yangdalmal'; One of the existing 22 old settlements in cheongju city. The results are as follows. 1) Side roads are derived from Inner road until 1970, so large-scale lots are subdivided small-scale lots. The houses are mostly in 1970s and 1980s. The existing old houses are 11, their orientation are East South, and the entrance gives on side road. The orientation, court yard, and entrance of the houses nearby side roads keep ongoing, in spite of alteration and extension. Especially, Entrance is changed by the new arterial roads and subdivided lots, but, the houses nearby side roads are continued as in the past. 2) The newly built houses in 1970's are 20, and it's arrangements are equal to existing old one. The orientation of houses after 1980's is the same in 1970's. But, the entrance is changed by subdivided lots, and the size of the court yard are reduced or disappeared. In other hand, the houses as the same size of the existing houses, and Storyincrease continue court yard as in the past. Therefore, the houses which are nearby inner road, and increase story, are continued, in spite of the newly built one.

The Analysis of Older Driver's Traffic Accident Characteristic at Express-way using Logit model (로짓모델을 이용한 고령운전자 고속도로 교통사고 특성 분석 연구)

  • Park, Jun-Tae;Kim, Young-Suck;Lee, Soo-Beom
    • International Journal of Highway Engineering
    • /
    • v.11 no.4
    • /
    • pp.1-7
    • /
    • 2009
  • Traffic accident by aging drivers is expected to be on the rise rapidly as the number of aging drivers is rising along with the aging trend being progressed. In this study, traffic accident features depending on the classification of aging population and non aging one was evaluated. As a result of this evaluation, effect factors influencing over the aging population was found to be expressed differently from that of the non aging one. Odds ratio between the aging population and non aging one was evaluated through logit model and a model with potential accident probability of the aged drivers was developed. Accident risk of the aged drivers under the condition of curved road, cutting section and moistured road was revealed to be higher than that of the non aging population.

  • PDF

The History, Status and Future of International Commercial Arbitration in China (中国国际商事仲裁的历史沿革, 现状及发展趋势)

  • Qiu, Jin;Kim, Yong-Kil
    • Journal of Arbitration Studies
    • /
    • v.27 no.4
    • /
    • pp.73-90
    • /
    • 2017
  • After the conclusion of the $18^{th}$ CPCNationalCongress, the Shanghai Free Trade Zone was established, and the One Belt One Road Initiative was brought up. These measures accelerate the development of international commercial activities as related disputes grow in variety and quantity. To better settle international commercial disputes and increase the influence of China in this area, this article reviews and analyzes the development of international commercial arbitration in China. In the conclusion part, it gives suggestions for international commercial arbitration in China in order to improve and accelerate the further development of international commercial arbitration in China.

Effect of Road Sweeping on the Abatement of Runoff Pollution Loads from in the Highway (고속도로 노면 청소에 따른 강우시 유출오염부하 저감 효과 분석)

  • Kang, Heeman;Lee, Doojin;Yoon, Hunsik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.6
    • /
    • pp.851-860
    • /
    • 2012
  • In this study, to evaluate the abatement of runoff pollution loads by the road sweeping(cleaning), various investigations are implemented at the sample area of the highway. As the results of evaluating the removal efficiency of pollutants along road cleaning, TSS showed about 78 % of the removal efficiency and COD showed 49 % of removal efficiency through the operation of cleaning vehicle of vacuum suction method. In case of TN and TP, they showed the relatively-lower removal efficiency by 30~35 %. TSS removal efficiency along the number of cleaning appeared about 60 % in case of one time of cleaning and the additional removal effect did not appear though the number of cleaning increased to two times. With running speed of cleaning vehicle, TSS removal ratio is lessened from 60 % to 20 % when cleaning vehicle speed up to 20 km/hr from 6 km/hr. It seems that the reasons why the removal efficiencies are inversely proportional to its speed are related to the lower vacuum efficiencies and the disturbed particles on the road. In the pollutant build-up analysis, it is showed that it takes more time to the critical pollutant build-up in the shoulder than the center of the road. It is also showed that the proper cleaning cycle is recommended as 4~6 dry weather days without rainfall events.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.