• Title/Summary/Keyword: On Line Maintenance

Search Result 629, Processing Time 0.032 seconds

FEG Development of MCR HVAC System for NPP (원자력발전소 주제어실 공기조화계통 기능적설비그룹 개발)

  • Hyun, Jin Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.21-25
    • /
    • 2012
  • Functional Equipment Group(FEG) of Nuclear Power Plant(NPP) is the bundling of multiple equipment subcomponents around a major equipment with a common system isolation characteristic or out-of-service consideration. The main purpose of FEG is to reduce out-of-service time to enhance maintenance effectiveness. KHNP(Korea hydro & Nuclear Power Co.) needs to develop these FEGs to successfully perform On-line Maintenance(OLM) which will be expected to institute in the future. Recently, there has been growing interest in OLM in KHNP. The aim of this paper is to suggest the way of FEG development and to build the FEG of MCR(Main Control Room) HVAC(Heat, Ventilation and Air Conditioning) system. The results of this study might be make good use of OLM and be helpful for equipment maintenance for MCR HVAC system.

A study on the analysis and counterplan of Line 5 EMU Inverter Failure (서울 지하철 5호선 전동차 인버터장치의 장애 분석)

  • Choi, Yong-Woon;Koo, Jeong-Seo;You, Won-Hee;Koh, Hyo-In
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.509-517
    • /
    • 2008
  • Rolling stock is the method of railway transportation. Especially, in the subway system which has short headways particularly during the rush hours, even one train's trouble on the main line might influence the whole line. Accordingly, to prevent a train trouble on the main line, high expense is used for the maintenance parts, workforce and facilities, etc. according to the preventive maintenance program. Therefore, in designing a EMU, emphasis should be put on the minimization of trouble and its extending influence on the mainline with the priority of safety and reliability. Seoul subway line 5 is the line that complements the first stage Seoul subway(lines 1,2,3 and 4) and is built deeply with many curved sections causing lots of dust. Studies were made to find out the importance of car design, selection of specifications and continuous maintenance on the basis of the analysis and countermeasure of the line 5 EMU inverter trouble case.

  • PDF

A Study on the Construction of Reliability Centered Maintenance System for Korean Tilting Train (한국형 틸팅열차의 신뢰성기반 유지보수 체계 구축에 관한 연구)

  • Seo, Sung-Il;Mun, Hyung-Suk;Eum, Ki-Young
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.520-526
    • /
    • 2007
  • 본 논문에서는 한국형 틸팅열차의 유지보수 활동을 위해 신뢰성기반유지보수체계를 제안하였다. 열차시스템을 3단계의 교체 부품 단위로 분류하고, 각 단위에 대해 기능블록도를 작성한 후 고장모드 영향 분석을 실시하였다. 각 단위의 심각도를 결정한 후 유지보수 정책을 제안하였으며, 틸팅열차를 위한 유지보수 기준을 정하고, 실제 사례를 제시하였다. 제안된 신뢰성기반유지보수체계는 기존 유지보수 체계와도 호환성을 갖고 있으며, 안전성 향상과 유지보수 활동 효율화에 기여할 수 있다.In this paper, a reliability centered maintenance (RCM) system is proposed to perform maintenance action for Korean Tilting Train. The train system was divided into line replaceable units up to three steps. Functional block diagrams were drawn and failure mode effect analysis for the units was carried out. The criticality of each unit was determined and a maintenance policy was proposed. Maintenance and repair criteria for the tilting train were determined and an example was presented. The proposed RCM system is compatible with the previous maintenance system and contributes to improvement of safety and efficiency of maintenance action.

A study of CWR on railway viaduct with sharp curves (철도고가교 급곡선부 레일장대화 방안연구)

  • 이상진;김기훈;신순호;이주헌
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.415-422
    • /
    • 2000
  • The Seoul Subway Line 4 crossing downtown diagonally constructed in February 1980 and opened on October 11, 1983. The line 4 is thus able to link southern and northern parts of Seoul with the downtown as well as with the Seoul outskirts. More than 810,000 people use it everyday. Line 4 was constructed like Line 1,2,3 with ballast track system causing much maintenance cost gradually and espicially much public discontent due to wheel and rail contact noise by railway viaduct with sharp curves. CWR on railway viaduct with sharp curves, 180m$\leq$R$\leq$300m, hasn't been designed and constructed ever in domestic. Therefore in order to reduce noise and vibration caused by interaction between wheel and rail the possibility and the methods of CWR(Continuous Welded Rail) on railway viaduct with sharp curve less than R300 will lead it to the maintenance free system.

  • PDF

765kV Transmission maintenance live-line work study (765kV 송전선로 유지.보수 활선공법 고찰)

  • Choi, Han-Yeol;Min, Byeong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.723-724
    • /
    • 2007
  • Live line work is well known for mending and maintenance of electrical power equipment. Nowadays needs of electric power supply quality require live line work In Korea, live line work is needed since 765kV transmission operation and restructure of electric power industry has changed. In other words, in case of suspension of power supply on the transmission is getting hard to keep up with efficiency of transmission operation, customer's confidence and generation-limited cost. Therefore live line work is very meaningful. As the condition of 765kV Transmission both bare hand and Helicopter live line technique must be used in moderation because of economic, geographical, environmental circumstances around steel tower.

  • PDF

울진 3,4호기 ESW 펌프 On-Line Maintenance분석

  • 김길유;한상훈;장승철;김태운
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.606-610
    • /
    • 1997
  • 울진 원전 3,4 호기 확률론적 안전성 평가 (PSA) 모델을 risk monitor 모델로 변환하여 한국원자력연구소에서 개발한 risk monitor인 Risk Monster[1]에 설치하였으며 이를 이용하여 필수냉각수 계통(ESW;Essential Service Water) 펌프의 가동중 정비(on-line maintenance)의 가능성 여부를 연구하였다. ESW 펌프를 가동중 정비하더라도 안전성 측면에서 별 문제가 없으며 경제성 여부는 보다 정확한 검토가 요구되나 상당히 있는 것으로 판단된다. 한편 ESW펌프 한대의 고장이 원전 가동중에 미치는 위험도를 분석하였으며 그 결과 ESW펌프 한대의 고장에도 불구하고 원전 계속 가동에는 큰 문제가 없었다.

  • PDF

A study on the application of TALK-BACK system in a radio communication environment (토크백 시스템 무선통신 적용방안 연구)

  • Yeo, Yong-Joo;Yoon, In-Young;Nam, Joung-In;Choi, Yoon-Seog
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1294-1302
    • /
    • 2008
  • Talk-Back systems comprised of master-equipment at the control room and slave-equipment at turnouts refer to the intercommunication facilities that optimize mutual communication between maintenance staff on trackside and the control room to facilitate quickness and accuracy of train operation control and its maintenance within depot and on mainlines with turnouts for direction switching of the trains in operation. The weakness lies in additional maintenance costs of cables since the Talk-Back system installed on line 1 along with line 2-4 has a profound effect on the voice quality leading to the attenuation and crosstalk of the system due to the deterioration of cables and environmental factors. This paper discusses the Talk-Back system in a radio communication environment with the application of RF(Radio Frequency) communication system from the wire communication system by cables to ameliorate these problems, and deals with the energy saving environmentally friendly facilities in consideration of replacing power section at salve-equipment with solar batteries benefitting the system in light of energy consumption.

  • PDF

A Study on the Improvement of VVVF Inverter of the Line 7 EMU by Applying FMECA Process (FMECA를 통한 7호선 VVVF 인버터 시스템 개선방안에 관한 연구)

  • Park, Jea-Hung;Kim, Ho-Kyung;Lee, Kwan-Sup
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.7-13
    • /
    • 2011
  • RAMS is the procedure to maximize the reliability and availability of systems with managing operation rate, the frequency of failure in the system and repair method. Recently, all system life-cycle focusing on RAMS process has been rapidly developing in the field of railway vehicles, for example, applying th reliability management techniques for procurement and disposal of EMU. In particular, global economic recession require to reasonable measures for the EMU maintenance costs under the circumstances therefore, an alternative solution based on RCM(Reliability Centered Maintenance) which is the optimal maintenance method is interested. In this study, the state of being critical of each component and a primary factors was analyzed to improve VVVF inverter of the line 7 EMU by applying FMECA process. Furthermore, this paper showed the impact of connecting between the main and sub system. Based on these data, critical components according to malfunction ratings were classified by screening measures and improvements for each components was summarized.

  • PDF

The Distribution of the Normal Traffic Loads on the Steel Plate Girder Bridge (실동하중에 의한 강판형교의 교통하중 분포)

  • Woo, Sang-Ik;Jung, Kyoung-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.103-111
    • /
    • 2000
  • The objectives of the study are to know the strain distribution and modal dynamic behaviour of steel bridge girders by actual traffic load. The live load effect depends on many parameters including the span length, gross vehicle weight, axle weight, axle configuration so on. For the estimation of static and dynamic characteristic, strain data caused by moving loads and traffic characteristics of passing vehicle under actual traffic load have measured using Bridge Weigh in Motion. To confirm the reliability of BWIM system, strain data measured using the $120{\Omega}$ strain gauge under the same condition. It is considered that the data acquired from BWIM system have reliability through the analysis and comparison between stress measured by strain data from BWIM and computed by FEM. Additionally according to the measured strain data of up-line and down-line on the highway, the up-line bridge grows more faster than the down-line bridge and girder 4 and 5 carry more load when vehicles pass the inner line and girder 2 and 3 does when vehicles pass the outer line as this case(the bridge composed with 5 girders).

  • PDF

On Line Monitoring and Diagnosis Technique for the Array of Photovoltaic Energy System (태양광 발전시스템 전지모듈의 온라인 감시 진단 시스템 개발)

  • Lee, Jong-Pil;Ji, Pyeong-Shik;Byun, Sang-Zoon;Lim, Jae-Yoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.56 no.4
    • /
    • pp.168-172
    • /
    • 2007
  • The global environment deteriorating which originated from using of fossil fuel is an serious problem for human being to solve. The photovoltaic energy has been considered as a solution. In advanced countries, research and development for photovoltaic(PV) energy system is carrying on. Once installed, a PV array requires maintenance and fault diagnosis other than an occasional cleaning. In this research, the proposed system monitor and diagnosis the output of PV array by on-line for maintenance of PV power plant. The validity of proposed system is verified using sample system.