• Title/Summary/Keyword: Offshore Development

Search Result 737, Processing Time 0.032 seconds

A Summary of Oil and Gas Development Projects on Sakhalin Offshore and Its Prospects (사할린 연안 유전개발 프로젝트 현황과 전망)

  • Im, Chae-Hwan
    • 연구논문집
    • /
    • s.28
    • /
    • pp.111-121
    • /
    • 1998
  • Offshore of Sakhalin Island is one of potential oil and gas development fields in Russia. American and Japanese companies are actively participating in the developments. They plan to export the produced oil and gas to East Asia including Korea, Japan and China. So far, offshore oil and gas field developments are mainly concentrated in the Russian Arctic area such as Barents Sea, Kara Sea and Tinman-Pechora Sea. In this article, the projects under development on the Sakhalin Shelf are reviewed and the environmental conditions in this area are summarized. At the end, the future prospects of the Sakhalin developments are reviewed.

  • PDF

Design of Field Development Ship for Ultra-Deepwater (초심해 용 유전개발선의 설계)

  • Park, H.S.;S.W. Yoon;I.M. Song
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.87-92
    • /
    • 2001
  • This technical note is intended to introduce a state-of-the-art offshore construction vessel. This unique vessel is for multi-purpose Field Development Ship (FDS) for deepwater to ultra-deepwater. The FDS is a construction vessel with dynamic positioning (DP) system intended to develop offshore oil and gas field in water depth up to 3000 m. The design criteria and main capacities of the vessel are discussed.

  • PDF

Technical Issues for Offshore Wind-Energy Farm and Monopile Foundation (해상풍력 발전의 기술동향 및 모노파일 기술개발 방향)

  • Choi, Chang-Ho;Cho, Sam-Deok;Kim, Ju-Hyong;Chae, Jong-Gil
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.486-493
    • /
    • 2010
  • Recently, it has been a worldwide issue to develop offshore wind farm based on the past technical experiences of onshore wind turbine installation. In Korea, the government has the wind-energy to be a new-sustainable field of development to bring green-growth in near future and put political and fiscal efforts to support the academic and industrial technical development. Especially, there are much advancement for the fields of turbine, blade, bearing, grid connection, ETC. Correspondingly, technical needs do exist for the offshore foundation installation techniques in geotechnical point of view. Within few years, 2~5MW offshore wind turbines will be constructed at about 30m water depth and it is known that monopiles of D=4~6m are suitable types of foundation. In order to construct offshore wind-turbine foundation, technical developments for drilling machine, design manual, monitoring&maintenance technique are required. This paper presents technical issues with related to offshore wind farm and large diameter monopile in the point of renewable energy development.

  • PDF

The Feasibility Study of Offshore Outsourcing in Korea SI Industry: Comparison between India and China case (한국 SI 산업의 Offshore 아웃소싱 가능성 검토: 인도/중국 사례 비교)

  • Yoo, Jin-Ho;Kwon, Yong-Min;Yi, Yoon-Sung
    • Journal of Information Technology Services
    • /
    • v.4 no.2
    • /
    • pp.135-144
    • /
    • 2005
  • The plenty of successful cases of Multi-national companies has been realized benefits of offshore outsourcing in particular "cost savings" from offshore IT outsourcing services, such as call center, software development, IT support and maintenance etc. A few Korean companies recently started to make the feasibility study of offshore IT outsourcing to catch up with the global trend. The objective of this study is to present the feasibility of offshore IT outsourcing of Korean companies through the analysis of pilot projects results between Indian and Chinese companies. The analysis include key elementsof cost, productivity, quality, practical issues as well as Gartner's framework, "AD Sourcing Cost Model", composed of 7 model factors. The findings of this study are not limited to understand offshore IT outsourcing but also provide useful guidelines covering wide range from the theoretical framework of selecting suitable offshore partner.

A Study on Education Curriculum for Human Resource of Offshore Plant (해양플랜트인력양성을 위한 교육과정개발에 대한 연구)

  • Lee, Chang-Hee;Lee, Ji-Woong;Chae, Jong-Ju
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.3
    • /
    • pp.498-509
    • /
    • 2014
  • Offshore plants is an intensive industry where real value is able to be created when EPCIC(Engineering, Procurement, Construction, Installation, Commissioning) is combined. Many universities and educational institutions have established major fields and graduate schools related in offshore construction and engineering as well as safety training and occupational courses. Most of the personnel who have graduated and passed those educational institutions have been working in domestic shipbuilding companies and marine equipment manufacturers. Therefore, customized education and training should be developed according to the educational demands required and then skilled personnel are needed to be supplied at proper times. This study, therefore, has found personnel demands inside and outside the country and occupational sections of offshore plants. Consequently, this study suggests making up a council comprised of shipbuilding companies, marine equipment manufacturers and educational institutions with government organization, and also researches the necessity of getting a job of personnel trained by the customized education. These results are expected to contribute to the development of education curriculum of domestic offshore plant as well as ODC(Offshore Development Center).

A Critical Review on Japan's Offshore Wind Bidding System (일본의 해상풍력 입찰제도에 관한 비판적 고찰)

  • Son Bumsuk
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.70-77
    • /
    • 2024
  • This study examines the issues regarding the selection competition process of offshore wind power operators conducted in Japan in 2020. It also explores the implications of the findings on the legal system of Korea for the introduction of offshore wind power in the future. Drawing on Japan's example, Korea must reconsider the importance of the price aspect when introducing offshore wind power and adopt policies that prioritize balanced industrial development and focus on regional and domestic economic ripple effects.

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

Development Status of 3MW Class Offshore Wind Turbine (3MW급 해상 풍력발전시스템 개발현황)

  • Joo, Wan-Don;Park, Jeung-Hun;Choi, June-Hyug;Lim, Chae-Wook;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.366-369
    • /
    • 2007
  • This paper presents the general results of the conceptual design of a 3MW class offshore wind turbine named WinDS 3000 under development. In WinDS 3000, an integrated drive train design, three stage gearbox and permanent magnet generator (PMG) with fully rated converters have been introduced. A pitch regulated variable speed power control with individual pitch control has been adopted to regulate rotor torque while generator reaction torque can be adjusted almost instantaneously by the associated power electronics. Through the introduction of WinDS 3000, it is expected that helpful to understanding of the development status of 3MW offshore wind turbine.

  • PDF

Study on Present Status and Future Direction of Korean Offshore Wind Power (한국의 해상풍력 현황과 발전방향에 관한 연구)

  • Sung, Jin Ki;Lee, Tae Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.312-321
    • /
    • 2013
  • In this study, we review the status of Southwest sea 2.5GW offshore wind project and expected various problems. And we suggest government policies for offshore wind industrialization. Especially, we would like to mention the necessity of offshore wind development in order to diversify power sources and guarantee energy security in Korea. And we would like to mention necessity and direction to make offshore wind into growth engine industry thorough fusion between industries and energization for the existing industry such as civil, shipbuilding, steel, etc. that was headed into downturn.

A Study on Development of Gap Competency Matrix for Offshore Workforce -Focusing on the Job Transportation for Seafarers- (해양플랜트 인력양성을 위한 직무능력향상 매트릭스 개발에 관한 연구 -해기사의 직업전환을 중심-)

  • LEE, Jin-Woo;LEE, Chang-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.2
    • /
    • pp.407-416
    • /
    • 2016
  • The offshore plant industry has basically functioned with a rigid teamwork culture and many operations are managed by ship's crew, shifts and affiliates together. The marine sector of offshore plant has much similarity with ship's environment. So a person who had experienced on board will have advantages to work for offshore industry. But in spite of all that, only a few korean seafarers are able to join in the offshore industry due to lack of information about the offshore environment. This study analyze the employee's wage structure, nature of employment contract, requirements of job qualifications. Therefore, this study will assist for seafarers to set up how to get their work and also suggest to develop relevant offshore training courses by researching the gap competency matrix.