• 제목/요약/키워드: Off-grid

검색결과 217건 처리시간 0.034초

Surface Encoder Based on the Half-shaded Square Patterns (HSSP)

  • Lee, Sang-Heon;Jung, Kwang-Suk;Park, Eui-Sang;Shim, Ki-Bon
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제9권3호
    • /
    • pp.82-84
    • /
    • 2008
  • A surface encoder based on the Half-shaded square pattern (HSSP) is presented. The HSSP working as reference grid is composed of the straight lines which are easy to be fabricated and make measuring time short. Since the periodic cell is separated in ON/OFF by the $45^{\circ}$ straight line, the duration from the starting point of scanning to the first rising edge and the duty cycle of the pulse train vary with respect to the position of the starting point. And the relationship between X and Y position and the duration, and duty cycle is described in the simple linear equation. Therefore, it is possible to measure X and Y position with the measured duration and duty cycle without calculating load. Through the test set-up, the feasibility of the proposed surface encoder was verified. Also the future works for improvement of performance were suggested.

고주파 필터를 이용한 개선된 위상각 검출 방법 (Enhanced Phase Angle Detect Method Using High-pass Filter)

  • 허민호;송성근;김광헌;남해곤;박성준
    • 전기학회논문지
    • /
    • 제58권12호
    • /
    • pp.2370-2378
    • /
    • 2009
  • The enhanced phase angle estimation algorithm is essential to supply the power stably under synchronizing with grid source. In this paper, we are proposed the novel phase angle estimation algorithm and verified the validity of proposed method as simulation with PSIM and experiments. We sort the harmonics element using high-pass filter(HPF) that have the cut-off frequency below basic element and make reverse d-q transformation. So, it can be restored the harmonics element at stationary axis, and we can get the fundamental voltage element of AC grid. Proposed PLL method have a rapid responsibility and a large margin at controller design than conventional method because it have a small phase delay and a sufficient controller gain margin. And, it can reduce the error of voltage rms value and axis transformation according to robust PLL algorithm against the harmonic and phase unbalance.

경제성평가 기반의 독립형 마이크로그리드 설계 프로그램 개발 (The Economic Evaluation based Design Program for the Off-Grid Microgrid)

  • 이학주;채우규;정원욱;김주용
    • 조명전기설비학회논문지
    • /
    • 제24권10호
    • /
    • pp.90-98
    • /
    • 2010
  • Microgrid is a small-scale power system composed of distributed generators, energy storage system and loads, and can operate in the grid-connected mode and the islanded mode. This paper presents optimal design procedures for remote microgrid. The design program is based on the economic evaluations including the feasibility study module, optimal combination and allocation of DERs, power network design and the reduction of the GHG emmission. This program which is suggested in this paper shows good performance as a tool of remote microgrid design.

스마트-독립전력망을 사용한 소규모 태양광 발전소의 건설과 운영: 한국-탄자니아 적정기술 거점센터의 사례 (Construction and Operation of Small Solar Plant Using Smart-Off-Grid: Case of Tanzania-Korea Innovative Technology and Energy Center)

  • 김지수;정우균;하보라;문지현;이협승;안성훈
    • 적정기술학회지
    • /
    • 제5권2호
    • /
    • pp.62-69
    • /
    • 2019
  • 안정적인 전력 공급은 해당 지역의 생활수준 개선과 소득 수준에 중요한 역할을 하기 때문에, 공적개발원조 (Official Development Assistance, 이하 ODA)의 중요한 목표중에 하나이다. 하지만 수많은 개도국의 교외지역은 국가 전력망과 제대로 연결되지 못하여 전력을 전혀 공급 받지 못하고 있고, 국가 전력망과 연결된 일부 받는 지역도 전력 용량의 한계로 인해 수시로 정전이 일어나고 있는 상황이며, 이는 해당 지역의 소득 수준 향상과 생활수준 개선에 큰 장애요소로써 작용하고 있다. 서울대학교가 넬슨-만델라 아프리카 과학기술원 (Nelson-Mandela African Institution of Science and Technolgoy, 이하 NM-AIST)과 협력하여 건립된 한국-탄자니아 적정기술거점센터 (Korea-Tanzania Innovative Technology and Energy Center, 이하 iTEC)은 이러한 문제를 해결하기 위해, 전력이 공급되지 않는 탄자니아 교외지역에 스마트-독립전력망을 활용한 소규모 태양광 발전소를 건설하고, 이와 연계된 사업을 진행함으로써, 이러한 문제를 해결하고자 한다. 이를 위해 킬리만자로 (Kilimanajaro) 주 음카라마 (Mkalama) 마을과 아루샤 (Arusha) 주 응구르도토(Ngurdoto) 마을에 각각 10 kW, 7 kW급 태양광 발전소를 건설하여, 각각 50 여가구에 전력을 공급하고 있다. 또한, 이에 대한 데이터를 수집하고 발전소와 배전 시스템의 운영을 위해 스마트 모니터링 시스템을 설치하였다. 이를 통해 고장 진단, 사용량 측정 등 다양한 기능을 수행하고 있다. ITEC에서는 이러한 스마트-독립전력망을 활용한 소규모 태양광 발전소 건설과 전력 공급, 그리고 다양한 연계사업 진행을 통해 지속가능한 개발도상국 농촌 주민의 소득수준과 삶의 질 향상을 도모하고 있다.

계통 사고 발생시 전압 변동을 최소화 하기위한 계통연계형 PCS의 제어 기법 (Control of Grid Connected Type PCS to Minimize Voltage Disturbance at Line Fault)

  • 정재헌;권창근;노의철;김인동;김흥근;전태원
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2011년도 추계학술대회
    • /
    • pp.257-258
    • /
    • 2011
  • This paper describes a new method for the seamless operation mode transfer of a PCS with minimized voltage disturbance. The proposed method provides reduced STS turn off time after line fault and smooth mode change between current and voltage control of the PCS. The usefulness of the method is verified through simulations with the consideration of the time delay in detecting a line fault and SCR turn-off time.

  • PDF

소형 풍력발전시스템의 출력제어 (Power Control of Small Wind Power System)

  • 김철호;이현채;서영택;조환기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.1066_1067
    • /
    • 2009
  • Wind power is one of most promising renewable energy. The output capacity of large wind turbine has been increased for off-shore application. Number of installation of small wind turbine also has been increased for the stand-alone and off-grid application of remote area and recently small wind turbine equipped with lamp on the pole is used for street lamp. Maximum wind energy must be extracted by wind turbine within rated wind speed. Power must be controlled to protect the system such as blade, generator, and power system above the rated wind speed. In this paper, small wind power system of 800W rating for battery charging is implemented and output power control by furling system is verified at wind tunnel test.

  • PDF

Axial response of PWR fuel assemblies for earthquake and pipe break excitations

  • Jhung, Myung J.
    • Structural Engineering and Mechanics
    • /
    • 제5권2호
    • /
    • pp.149-165
    • /
    • 1997
  • A dynamic time-history analysis of the coupled internals and core in the vertical direction is performed as a part of the fuel assembly qualification program. To reflect the interaction between the fuel rods and grid cage, friction element is developed and is implemented. Also derived here is a method to calculate a hydraulic force on the reactor internals due to pipe break. Peak responses are obtained for the excitations induced from earthquake and pipe break. The dynamic responses such as fuel assembly axial forces and lift-off characteristics are investigated.

Investigation and Simulation Study on the Cascading Trip-off Fault of a Large Number of Wind Turbines in China on May 14, 2012

  • Qiao, Ying;Lu, Zong-Xiang;Lu, Ji;Ruan, Jia-Yang;Wu, Lin-lin
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권6호
    • /
    • pp.2240-2248
    • /
    • 2015
  • The integration of the large-scale wind power brings great challenge to the stability of the power grid. This paper investigates and studies the fault on May 14, 2012 of the large-scale cascading trip-off of wind turbines in North China. According to the characteristics of the voltage variation, the fault process is divided into three stages: the pre-event stage, the critical stage before cascading, and the cascading stage. The scenes in the fault are reproduced, using the full-size actual power system model. Simulation models of double-fed induction generators (DFIGs) and SVCs including protection settings and controller strategies are carefully chosen to find out the reason of voltage instability in each stage. Some voltage dynamic that have never been observed before in the faults of the same kind are analyzed in detail, and an equivalent voltage sensitive dynamic model of DFIG is proposed for the fast computation. The conclusions about the voltage dynamics are validated by the actual PMU observation evidence.

Methods for Adding Demand Response Capability to a Thermostatically Controlled Load with an Existing On-off Controller

  • Jin, Young Gyu;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권3호
    • /
    • pp.755-765
    • /
    • 2015
  • A thermostatically controlled load (TCL) can be one of the most appropriate resources for demand response (DR) in a smart grid environment. DR capability can be effectively implemented in a TCL with various intelligent control methods. However, because traditional on-off control is still a commonly used method in a TCL, it is useful to develop a method for adding DR capability to the TCL with an existing on-off controller. As a specific realization of supervisory control for implementing DR capability in the TCL, two methods are proposed - a method involving the changing of a set point and a method involving the paralleling of an identified system without delay. The proposed methods are analyzed through the simulations with an electric heater for different power consumption levels in the on-state. Considerable cost benefit can be achieved with the proposed methods when compared with the case without DR. In addition, the observations suggest that a medium power consumption level, instead of the maximum power, in the on-state should be used for consistently obtaining the cost benefit without severe temperature deviation from the specified temperature range for DR.

전력소비자 수요관리용 전지전력저장시스템의 적정 가격 산정 (Estimation of Reasonable Price of Battery Energy Storage System for Electricity Customers Demand Management)

  • 김슬기;조경희;김종율;김응상
    • 전기학회논문지
    • /
    • 제62권10호
    • /
    • pp.1390-1396
    • /
    • 2013
  • The paper estimated the reasonable market price of lead-acid battery energy storage system (BESS) intended for demand management of electricity customers. As time-of-use (TOU) tariffs have extended to a larger number of customers and gaps in the peak and off-peak rates have gradually risen, deployment of BESS has been highly needed. However, immature engineering techniques, lack of field experiences and high initial investment cost have been barriers to opening up ESS markets. This paper assessed electricity cost that BESS operation could save for customers and, based on the possible cost savings, estimated reasonable prices at which BESSs could become a more prospective option for demand management of customers. Battery scheduling was optimized to maximize the electricity cost savings that BESS would possibly achieve under TOU tariffs conditions. Basic economic factors such as payback period and return on investment were calculated to determine reasonable market prices. Actual load data of 12 industrial customers were used for case studies.