• Title/Summary/Keyword: OSC (Off Site Construction)

Search Result 31, Processing Time 0.026 seconds

A Study on the Critical Success Factors of Off-Site Construction through Keyword Frequency Analysis - A Literature Review of Overseas Research - (키워드 빈도분석을 통한 OSC (Off-Site Construction) 프로젝트의 성공요인 고찰 - 해외연구 문헌고찰을 중심으로 -)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.13-26
    • /
    • 2021
  • To promote the off-site construction (OSC) in Korea, technical innovation applied to each phase, such as design, engineering, factory production, and site assembly, is important and equally necessary is the development of management and operation methods that are different from existing construction production methods. However, the current OSC-related studies in Korea are conducted from the technical development viewpoints, such as construction methods. Additionally, few studies have been conducted to derive a management measure for successful OSC projects. Therefore, studies to derive a management measure based on a clear understanding of the core success factors of OSC projects are required. This study aims to analyze several studies related to the success factors of OSC projects conducted overseas and to show its core implications for the successful management of OSC projects in Korea. We expect this study to improve the viability of OSC projects, which will be expanded in Korea in the future.

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

Survey-based User Perception Analysis for Off-site Construction in Institutional Building

  • Chaeyeon Yu;Hojeong Jeong;Sungjin Kim
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.33-40
    • /
    • 2024
  • Off-site construction (OSC) is an architectural approach involving the prefabrication of building structures, components, parts, and equipment in a factory, followed by transportation to the construction site for assembly and installation. This method is particularly suitable for buildings with simple, repetitive structures and straightforward processes, such as hospitals, hotels, and schools. However, the inherent prefabrication characteristic has led to a widespread negative perception among the general public, resulting in significant resistance, especially from parents, concerning educational buildings utilizing OSC. In response, this study targeted users currently employing OSC in institutional buildings to analyze critical perception factors and derive avenues for enhancing the activation of OSC methods. The survey, categorized into seven factors, revealed that safety factors received the most positive responses, while social factors were identified as the most negatively perceived. The analysis of improvement requirements for OSC indicated that addressing issues related to hazardous material exposure and improving air quality are crucial in the equipment and eco-friendly aspects. In terms of design and usability improvement, maintaining harmony with the surrounding environment was identified as essential. Ultimately, this study anticipates the activation of OSC through the analysis of user perceptions and improvement suggestions for each OSC factor.

A study on influencing factors and revitalization of the adoption of off-site construction - Case study on the construction market of the United Kingdom - (현장외 시공 공법 채택의 영향 인자 및 활성화 방안 연구 - 영국 건설 시장 사례 연구 -)

  • Kim, Min-Koo;Brilakis, Ioannis;An, Yun-Kyu
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.33-40
    • /
    • 2015
  • Over a few decades, off-site construction (OSC) has been widely used for building and bridge constructions. OSC is a construction method that build structures at a different location than the location of use, and normally it occurs in a manufacturing plant. There are many studies on the perceived benefits of OSC, yet relatively few studies which quantitatively assess the benefits and factors affecting the decision of the use of OSC have been investigated. This study investigates the influencing factors of the use of OSC system and its revitalization solutions in the construction industry. As the research method, interview and questionnaire survey are conducted by visiting industry experts of OSC and sending a questionnaire to the OSC stakeholders including engineers, manufacturers, contractors and clients in the United Kingdom (UK). The construction industry of the UK is targeted for the study since it has a number of commons with the Korean construction industry in terms of the structure of the construction industry and current low take-up of the OSC. The survey provides the results that the reluctance of clients to use OSC is the key factor of the slow use of OSC despite of the perceived benefits of OSC. In addition, in order to revitalize OSC in the construction market, three revival recommendations are suggested based on the survey results.

Application of BLE-based Beacon in Modular Construction Process (BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안)

  • Kim, Changjae;Kang, Namwoo;Kwon, Woobin;Kim, Harim;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

A Study on Critical Success Factors of Off-Site Construction - By Importance Performance Analysis - (IPA를 통한 OSC 핵심성공요인에 관한 연구 - 국내 PC기반 OSC를 중심으로 -)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.24-36
    • /
    • 2023
  • OSC is drawing attention to supplement limitations such as productivity problems and on-site safety and quality problems of existing on-site labor-oriented construction production methods. In order to activate the introduction and use of OSC in the domestic construction market, it is important to innovate the technology applied to each stage of OSC process (design and engineering, factory manufacturing, site assembly, and maintenance), but it is also necessary to develop a project management method suitable for OSC method. However, research related to OSC currently being conducted in Korea is mainly in terms of related technology development, and research on deriving project management measures for the success of OSC projects is insufficient. Therefore, it is time for research on deriving a project management plan based on the core success factors of the OSC project. Therefore, by conducting importance-performance analysis on 69 OSC critical success factors derived from the previous study, the study was conducted to derive key improvement factors for OSC introduction and utilization improvement and to provide implications for this. The results of this study are expected to have useful implications for the R&D planning and policy-making process for OSC activation in the future.

A Study on Plans for Diffusion & Revitalization, and Developing Key Performance Indicator for OSC based PC Structure Apartment Housing (OSC기반 PC구조 공동주택의 보급 및 활성화 방안과 핵심 성과 지표 개발 - 주체별 설문조사 분석결과를 중심으로 -)

  • Lee, Sungho;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.98-105
    • /
    • 2021
  • Recently, there have been many changes in the domestic construction industry. OSC (Off-Site Construction) is expected to solve these problems, and it is emerging as a way to inspire innovation in the domestic construction production system. OSC, which has only recently attracted attention again after previous studies have failed, is lacking in research on preception surveys and customized performance measurements compared to overseas. This study investigated the perceptions of construction industry workers on OSC through a survey, and examined differences in perceptions of each subject and the relative importance of performance indicators. In general, the need for introduction and development of OSC was recognized. Also, drivers and obstacles inhibiting more use of OSC were analyzed. The relative importance for performance indicators and differences in perceptions of each subject were identified. Then, this study suggests plans for diffusion and revitalization of OSC, and key performance indicator for OSC based PC structure apartment housing.

Comparion of Korea-Japan Quality Standards for Grout Materials about PC Member assembly (PC부재 조립용 그라우트 재료 품질 기준의 한일 비교)

  • Kim, Yeon-Ho;Lee, Bum-Sik;Kim, Min-Jun;Kim, Ki-Ho;Jun, Myoung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.127-128
    • /
    • 2023
  • Recently, OSC (off-site construction) construction has been revitalized as a response to the decline in building quality and productivity due to lack of skilled manpower at construction sites, and PC (precast concrete) construction, a representative OSC construction, is insufficiently applied to public housing.This is the situation.In addition, in the case of general contents appearing in standard specifications, the construction standards for quality assurance remain in the 1990s and do not correspond to the current construction environment.In order to improve the quality of PC member joints, we compared and analyzed Korean and Japanese specifications to establish appropriate standards for PC construction quality control, focusing on the quality of grout used in joints.

  • PDF