A Study on the Critical Success Factors of Off-Site Construction through Keyword Frequency Analysis - A Literature Review of Overseas Research -  

Jung, Seoyoung (Department of Architectural Engineering, Kwangwoon University)
Yu, Jungho (Department of Architectural Engineering, Kwangwoon University)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.1, 2021 , pp. 13-26 More about this Journal
Abstract
To promote the off-site construction (OSC) in Korea, technical innovation applied to each phase, such as design, engineering, factory production, and site assembly, is important and equally necessary is the development of management and operation methods that are different from existing construction production methods. However, the current OSC-related studies in Korea are conducted from the technical development viewpoints, such as construction methods. Additionally, few studies have been conducted to derive a management measure for successful OSC projects. Therefore, studies to derive a management measure based on a clear understanding of the core success factors of OSC projects are required. This study aims to analyze several studies related to the success factors of OSC projects conducted overseas and to show its core implications for the successful management of OSC projects in Korea. We expect this study to improve the viability of OSC projects, which will be expanded in Korea in the future.
Keywords
Off-Site Construction; Critical Success Factors; Project Success;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2014). Critical success factors and enablers for optimum and maximum industrial modularizationm, Journal of Construction Engineering and Management, 140(6).
2 O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2015). "Standardization strategy for modular industrial plants." J. Constr Eng Manage., 141(9), 04015026.   DOI
3 O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2016). "Industrial project execution planning: modularization versus stick-built." Pract Period Struct Des Constr., 21(1), 04015014.   DOI
4 Olawale, Y., Sun, M., and PCIM. (2013). "Project Control and Inhibiting-Factors Management Model." J. Manag. Eng., 29, pp. 60-70.   DOI
5 Ojoko, E.O., Osman, M.H., Abdul Rahman, A.B., and Bakhary, N. (2018). "Evaluating the critical success factors of industrialised building system implementation in Nigeria: The stakeholders' perception." International Journal of Built Environment and Sustainability, 5(2), pp. 127-133.
6 Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2007). "Perspective of UK housebuilders on the use of offsite modern methods of construction." Constr Manage Econ., 25(2), pp. 183-194.   DOI
7 Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2008). "Leading UK housebuilders' utilization of offsite construction methods." Building Research and Information, 36(1), pp. 56-67.   DOI
8 Gibb, A.G.F. (1999). Off-site fabrication: Prefabrication, preassembly and modularization (1st ed.). Latheronwheel: Whittles Publishing. doi:10.1680/bimpp.63693.109
9 Gibb, A.G0F. (2001). "Standardization and pre-assembly-distinguishing myth from reality using case study research." Constr Manage Econ., 19(3), pp. 307-315.   DOI
10 Gibb, A.G.F., and Isack, F. (2001). "Client drivers for construction projects." Eng Const Arch Man., 8(1), pp. 46-58.   DOI
11 Gibb, A.G.F., and Isack, F. (2003). "Re-engineering through preassembly: Client expectations and drivers." Building Research and Information, 31(2), pp. 146-160.   DOI
12 Goulding, J.S., Pour Rahimian, F., Arif, M., and Sharp, M.D. (2015). "New offsite production and business models in construction: Priorities for the future research agenda." Archit. Eng. Des. Manag., 11, pp. 163-184.   DOI
13 Cheng, Y.M. (2014). "An exploration into cost-influencing factors on construction projects." Int. J. Proj. Manag., 32, pp. 850-860.   DOI
14 Haas, C.T., and Fagerlund, W.R. (2002). Preliminary research on prefabrication, pre-assembly, modularization and offsite fabrication in construction. Austin, TX. Retrieved from https://smartech.gatech.edu/handle/1853/10883
15 BSRIA. (1998). Prefabrication and Preassembly - applying the technique to building engineering services In Advance Construction Technique ACT 1/99 (Ed. Wilson, D. G., Smith, M. H. and Deal, J.) Department of Environment Transport Region (DETR) and the Building Services Research and InformatFactors affecting large scale modular construction projecion Association (BSRIA).
16 Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2012). "Strategies for integrating the use of off-site production technologies in house building." J. Constr Eng Manage., 138(11), pp. 1331-1340.   DOI
17 Park, J.W., Jun, Y.J., Park, S.H., and Kwon, O.K. (2011)."A Study of Deriving Critical Success Factors in Construction Projects." Proceedings of the KSCE, pp. 381-384.
18 Pheng, L.S., and Chuan, C.J. (2001). "Just-in-Time Management of Precast Concrete Components." J. Constr. Eng. Manag., 127, pp. 494-501.   DOI
19 Carriker, M., and Langar, S. (2014). "Factors Affecting Large Scale Modular Construction Projects." 50th ASC annual international conference proceedings. pp. 1-8.
20 Chan, A., Scott, D., and Chan, A. (2004). "Factors affecting the success of a construction project." J. Constr. Eng. Manag., 130, pp. 153-155.   DOI
21 Chiang, Y.H., Chan, E.H.W., and Lok, L.K.L. (2006). "Prefabrication and barriers to entry-a case study of public housing and institutional buildings in Hong Kong." Habitat Int., 30, pp. 482-499.   DOI
22 Choi, J.O. (2014). "Links between modularization critical success factors and project performance." Austin, TX, United States: The University of Texas at Austin.
23 Choi, J. O., and O'Connor, J.T. (2014). "Modularization critical success factors accomplishment: Learning from case studies." Construction Research Congress, pp. 1636-1645.
24 Choi, J.O., O'Connor, J.T., and Kim, T.W. (2016). "Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis." J Constr Eng Manage., 142(10).
25 Xue, X., Shen, Q., and Ren, Z. (2010). "Critical review of collaborative working in construction projects: Business environment and human behaviors." J. Manag. Eng., 26, pp. 196-208.   DOI
26 Presidential Commission on Architecture Policy. (2015). A Study on the Revitalization of Off-Site Construction, (2015-04).
27 Puddicombe, M.S. (2006). "The Limitations of Planning: The Importance of Learning." J. Constr. Eng. Manag., 132, pp. 949-955.   DOI
28 Xue, H., Zhang, S., Su, Y., and Wu, Z. (2017). "Factors affecting the capital cost of prefabrication - a case study of China." Sustainability, 9(9), pp. 1-22.
29 Yu, I.H. (2019). "A Study on the Changes and Development of Specialized Construction Industry in OSC Industry." Construction Engineering and Management, KICEM, 20(5), pp. 12-18.
30 Yunus R., Noor S.R.M., Abdullah A.H., Nagapan S., Hamid A.R.A., Tajudin S.A.A., and Jusof S.R.M. (2017). "Critical Success Factors for Lean Thinking in the Application of Industrialised Building System (IBS)." IOP Conference Series: Materials Science and Engineering, 226, pp. 6-7.
31 Zhang, X., Skitmore, M., and Peng, Y. (2014). "Exploring the challenges to industrialized residential building in China." Habitat Int., 41, pp. 176-184.   DOI
32 Ahn, Y.H. (2019). "Technical status and development direction of modular construction method in Korea." KAIA Insight, 14.
33 Demiralp, G., Guven, G., and Ergen, E. (2012). "Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components." Automation in Construction, 24, pp. 120-129.   DOI
34 Ergen, E., and Akinci, B. (2008). "Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains." J. Constr. Eng. Manag., 134, pp. 112-121.   DOI
35 Ergen, E., Akinci, B., and Sacks, R. (2007). "Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS." Automation in Construction, 16, pp. 354-367.   DOI
36 Faniran, O.O., Oluwoye, J.O., and Lenard, D.J. (1998). "Interaction between construction planning and influence factors." J. Constr. Eng. Manag., 124, pp. 245-256.   DOI
37 Akagi, K., Murayama, K., Yoshida, M., and Kawahata, J. (2002). "Modularization technology in power plant construction." Proceedings of ICONE10 10th International Conference on Nuclear Engineering, Arlington, pp. 21-27.
38 Arashpour, M., Bai, Y., Aranda-mena, G., Bab-Hadiashar, A., Hosseini, M.R., and Kalutara, P. (2017). "Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in offsite construction." Automation in Construction, 84, pp. 146-153.   DOI
39 Arif, M., and Egbu, C. (2010). "Making a case for offsite construction in China." Engineering Construction and Architectural Management, 17(6), pp. 536-548.   DOI
40 Azam Haron, N., Abdul-Rahman, H., Wang, C., and Wood, L.C. (2015). "Quality function deployment modelling to enhance industrialised building system adoption in housing projects." Total Qual. Manag. Bus. Excell., 26, pp. 703-718.   DOI
41 Tam, V.W.Y., Tam, C.M., and Ng, W.C.Y. (2007). "On prefabrication implementation for different project types and procurement methods in Hong Kong." J. Eng. Design Tech., 5(1), pp. 68-80.   DOI
42 Wu, P., and Low, S.P. (2014). "Barriers to achieving green precast concrete stock management-A survey of current stock management practices in Singapore." Int. J. Constr. Manag., 14, pp. 78-89.   DOI
43 Azhar, S., Lukkad, M.Y., and Ahmad, I. (2013). "An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique." International Journal of Construction Education and Research, 9(3), pp. 203-225.   DOI
44 Wu, P., Low, S.P., and Jin, X. (2013). "Identification of non-value adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation. Resour." Conserv. Recycl., 81, pp. 60-70.   DOI
45 Zhai, X., Reed, R., and Mills A. (2013). "Factors impeding the offsite production of housing construction in China: an investigation of current practice." Construction Management and Economics, 17(10).
46 Zhao, X., Hwang, B.G., and Low, S.P. (2013). "Critical success factors for enterprise risk management in Chinese construction companies." Constr. Manag. Econ., 31, pp. 1199-1214.   DOI
47 Zhong, R.Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., and Huang, G.Q. (2017). "Prefabricated construction enabled by the internet-of-things." Automation in Construction, 76, pp. 59-70.   DOI
48 Song, J., Fagerlund, W.R., Haas, C.T., Tatum, C.B., and Vanegas, J.A. (2005). "Considering prework on industrial projects." J. Constr Eng Manage., 131(6), pp. 723-733.   DOI
49 Tam, V.W.Y., Fung, I.W.H., Sing, M.C.P., and Ogunlana, S.O. (2015). "Best practice of prefabrication implementation in the Hong Kong public and private sectors." Journal of Cleaner Production, 109, pp. 216-231.   DOI
50 Thanoon, W.A., Peng, L.W., Kadir, M.R.A., Jaafar, M.S., and Salit, M.S. (2003). The Essential Characteristics of Industrialised Building System In International Conference on Industrialised Building Systems Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur, Malaysia, 10-11 September 2003.
51 Blismas, N.G. (2007). "Off-site manufacture in Australia: current state and future directions." Cooperative Research Centre for Construction Innovation for Icon. Net Pty Ltd: Brisbane, Australia.
52 Babic, N.C., Podbreznik, P., and Rebolj, D. (2010). "Integrating resource production and construction using BIM." Automation in Construction, 19, pp. 539-543.   DOI
53 Barlow, J., Childerhouse, P., Gann, D., Hong-Minh, S., Naim, M., and Ozaki, R. (2003). "Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders." Building Research and Information, 31(2), pp. 134-145.   DOI
54 Benjaoran, V., and Dawood, N. (2006). "Intelligence approach to production planning system for bespoke precast concrete products." Automation in Construction, 15(6), pp. 737-745.   DOI
55 Blismas, N.G., Pasquire, C., and Gibb, A.G.F. (2006). "Benefit evaluation for off-site production in construction." Construction Management and Economics, 24(2), pp. 121-130.   DOI
56 Blismas, N.G., and Wakefield, R. (2009). "Drivers, constraints and the future of offsite manufacture in Australia." Constr Innov, 9(1), pp. 72-83.   DOI
57 Haller, M., Lu, W., Stehn, L., and Jansson, G. (2015). "An indicator for superfluous iteration in offsite building design processes." Archit. Eng. Des. Manag., 11, pp. 360-375.   DOI
58 Heravi, A., Coffey, V., and Trigunarsyah, B. (2015). "Evaluating the level of stakeholder involvement during the project planning processes of building projects." Int. J. Proj. Manag., 33, pp. 985-997.   DOI
59 Tommelein, I.D. (2015). "Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry." J. Constr. Eng. Manag., 141, pp. 1-12.   DOI
60 Hjort, B., Lindgren, J., Larsson, B., and Emmitt, S. (2014). Success factors Related to industrialized building inSweden. Paper presented at the CIB international conference on construction in a changing world (pp. 1-13). Kandalana: School of the Built Environment, University of Salford.
61 Toor, S.U.R., and Ogunlana, S.O. (2009). "Construction professionals' perception of critical success factors for largescale construction projects." Construction Innovation, 9(2), pp. 149-167.   DOI
62 Triumph Modular Corporation. (2019). Critical success factors for volumetric modular construction. Littleton: Triumph Modular. Retrieved from https://triumphmodular.com/permanent-modular/how-to-start/critical-success-factors/
63 Vrijhoef, R., Cuperus,, Y., Voordijk, H. (2002). Exploring the Connection between Open Building and Lean Construction: Defining a Postponement Strategy for Supply Chain Management in Proceedings IGLC-10 Gramado, Brazil, August 2002.
64 Wang, C., Liu, M., Asce, A.M., Hsiang, S.M., Leming, M.L., and Asce, M. (2013). "Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility." J. Constr. Eng. Manag., 138, pp. 1-12.   DOI
65 Warszawski, A. (1999). Industrialization and Automated building systems (2nd ed.). London: E & FN Spon.
66 Wong, P.S.P., Whelan, B., and Holdsworth, S. (2018). "Are contractors ready for greater use of prefabrication in projects? An empirical analysis on the role of unlearning and counter-knowledge." International Journal of Construction Management, pp. 1-16.
67 Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated prefinished volumetric construction." Autom Constr., 94(July), pp. 168-178.   DOI
68 Hofman, E., Voordijk, H., and Halman, J. (2009). "Matching supply networks to a modular product architecture in the house-building industry." Building Research and Information, 37(1), pp. 31-42.   DOI
69 Housing Forum. (2002). Homing in on excellence - A commentary on the use of offsite fabrication (OSF) methods for the UK housebuilding industry, The Housing Forum, London, pp. 1-79
70 Hsu, P.Y., Angeloudis, P., and Aurisicchio, M. (2018). "Optimal logistics planning for modular construction using two-stage stochastic programming." Automation in Construction, 94, pp. 47-61.   DOI
71 Ismail, F., Yusuwan, N.M., and Baharuddin, H.E.A. (2012). "Management factors for successful IBS projects implementation." Procedia - Social and Behavioral Sciences, 68, pp. 99-107.   DOI
72 Jabar, I.L., Ismail, F., Aziz, N.M., and Janipha, N.A.I. (2013). "Construction Manager's Competency in Managing the Construction Process of IBS Projects." Procedia Soc. Behav. Sci. 105, pp. 85-93.   DOI
73 Jaillon, L., and Poon, C.S. (2009). "The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector." Autom. Constr., 18, pp. 239-248.   DOI
74 Jeong, Y.S., Eastman, C.M., Sacks, R., and Kaner, I. (2009). "Benchmark tests for BIM data exchanges of precast concrete." Autom. Constr. 18, pp. 469-484.   DOI
75 Lau, A.K.W. (2011). "Critical success factors in managing modular production design: Six company case studies in Hong Kong, China, and Singapore." Journal of Engineering and Technology Management, 28(3), pp. 168-183.   DOI
76 Wuni, I.Y., and Shen, G.Q. (2019). "Critical success factors for modular integrated construction projects: a review." Build Res Inform., pp. 1-22.
77 Wuni, I.Y., and Shen, G.Q. (2020). "Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle." Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333.   DOI
78 Kamar, K.A.M., Alshawi, M., and Hamid, Z.A. (2009). "Industrialised building system: The critical success factors." 9th international postgraduate research conference (IPGRC), pp. 485-497.
79 Kim, J.S. (2020). Modular Architecture in Global Markets analyzed by McKinsey - 1, RICON, www.ricon.re.kr/foreign_view.html?bn=23&seq=4705
80 Ko, C. (2010). "An integrated framework for reducing precast fabrication inventory." J. Civ. Eng. Manag., 16, pp. 418-42.   DOI
81 Lee, J.H., and Hwang, E.K. (2019). "An Analysis of Overseas Systems for Activation of the Industrialized Housing Accreditation System." The International Journal of The Korea Institute of Ecological Architecture and Environment, 19(6), pp. 49-55.
82 Lee, J.S., and Kim, Y.S. (2017). "Analysis of cost-increasing risk factors in modular construction in Korea using FMEA." KSCE Journal of Civil Engineering, 21(6), 1999-2010.   DOI
83 Lessing, J., and Brege S. (2018). "Industrialized building companies' business models: multiple case study of Swedish and North American companies." J. Constr Eng Manage., 144(2), 05017019.   DOI
84 Lessing, J., Stehn, L., and Ekholm, A. (2005). "Industrialised housing: Definition and categorisation of the concept." Proceedings of the in the 13th annual conference in the international group for lean construction, pp. 471-480.
85 Li, C.Z., Hong, J., Xue, F., Shen, G.Q., Xu, X., and Mok, M.K. (2016). "Schedule risks in prefabrication housing production in Hong Kong: A social network analysis." Journal of Cleaner Production, 134(Part B), pp. 482-494.   DOI
86 Kim, D.S., Kim, K.R., Cha, H.S., and Shin, D.W. (2013). "A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type." Korean Journal of Construction Engineering and Management, KICEM. 14(5), pp. 164-174.   DOI
87 Nawi, M.N.M., Lee, A., Kamar, K.A.M., and Hamid, Z.A. (2012). "Critical success factors for improving team integration in industrialised building system (IBS) construction projects: The Malaysian case." Malaysian Construction Research Journal, 10(1), pp. 44-62.
88 Neala, R., Price, A., and Suer, W. (1993). Prefabricated modules in construction, Bourn Press Limited, Bournemouth.
89 Kamar, K.A.M., Azman M.N.A., and Nawi M.N.M. (2014). "IBS Survey 2010: Drivers, Barriers and Critical Success Factors in Adopting Industrialised Building System (IBS) Construction bt G7 Contractors in Malaysia." Journal of Engineering Science and Technology, 9(4), pp. 490-501.
90 Kamar, K.A.M., Hamid, Z.A., and Alshawi, M. (2010). "The critical success factors (CSFs) to the implementation of industrialized building system (IBS) in Malaysia." TG57 - special track, 18th CIB world building congress, pp. 64-76.
91 Kim, M.K., Ioannis, B., and An, Y.K. (2015). "A study on influencing factors and revitalization of the adoption of off-site construction - Case study on the construction market of the United Kingdom." Journal of KIBIM, 5(3), pp. 33-40.   DOI
92 Rashidi, A., and Ibrahim, R. (2017). "Industrialized construction chronology: The disputes and success factors for a resilient construction industry in Malaysia." The Open Construction and Building Technology Journal, 11(1), pp. 286-300.   DOI
93 Rentschler, C., Mulrooney, M., and Shahani, G. (2016). "Modularization: The key to success in today's market." Hydrocarbon Processing, 95(12), pp. 27-30.
94 Hassim, S., Jaafar, M.S., and Sazali, S.A.A.H. (2009). "The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia American." Journal of Applied Sciences, 6(5), pp. 937-942
95 Li, C.Z., Xue, F., Li, X., Hong, J., and Shen, G.Q. (2018). "An internet of things-enabled BIM platform for onsite assembly services in prefabricated construction." Automation in Construction, 89, pp. 146-161.   DOI
96 Liu, H., Al-Hussein, M., and Lu, M. (2015). "BIM-based integrated approach for detailed construction scheduling under resource constraints." Autom. Constr., 53, pp. 29-43.   DOI
97 Haas, C.T., O'Connor, J.T., Tucker, R.L., Eickmann, J.A., and Fagerlund, R.W. (2000). Prefabrication and preassembly trends and effects on the construction workforce. Report No. 10, Center for Construction Industry Studies, University of Texas at Austin, Austin.
98 Murtaza, M.B., Fisher, D.J., and Skibniewski, M.J. (1993). "Knowledgment-based approach to modular construction decision support." J. Constr Eng Manag., 119(1), pp. 115-130.   DOI
99 Mydin, M.A.O., Nawi, M.N.M., Yunos, M.Y.M., and Utaberta, N. (2015). "Decisive success factors in executing prefabrication system in Malaysia." Australian Journal of Basic and Applied Sciences, 9(97), pp. 160-163.
100 Nadim, W., and Goulding, J.S. (2011). "Offsite production: A model for building down barriers: A European construction industry perspective." Eng. Constr. Archit. Manag., 18, pp. 82-101.   DOI
101 Na, L., and Liska, R.W. (2008). "Designers and General Contractors Perceptions of Offsite Construction Techniques in the United State Construction Industry." International Journal of Construction Education and Research, 4(3), pp. 177-188.   DOI
102 Mao, C., Shen, Q., Pan, W., and Ye, K. (2015). Major Barriers to Off-Site Construction: The Developer's Perspective in China. J. Manag. Eng., 31.
103 Sanderson, G. (2003). A strategic review of the use of modern methods of construction in new-build and refurbishment housing projects, Richard Hodkinson Consultancy Report, October 2003.
104 Sharafi, P., Rashidi, M., Samali, B., Ronagh, H., and Mortazavi, M. (2018). "Identification of factors and decision analysis of the level of modularization in building construction." Journal of Architectural Engineering, 24(2), 04018010.   DOI
105 Li, L., Li, Z., Wu, G., and Li, X. (2018). "Critical success factors for project planning and control in prefabrication housing production: A China study." Sustainability (Switzerland), 10(3), pp, 836-817.   DOI
106 National Audit Office Report (2005). Using modern methods of construction to build homes more quickly and efficiently, National Audit Office (NAO), London, November 2005.
107 Lu, W., and Yuan, H. (2013). "Investigating waste reduction potential in the upstream processes of offshore prefabrication construction." Renew. Sustain. Energy Rev. 28, pp. 804-811.   DOI
108 Lu, Y., Li, Y., Skibniewski, M.J., Wu, Z., Wang, R., and Le, Y. (2014). "Information and Communication Technology Applications in Architecture, Engineering, and Construction Organizations: A 15-Year Review." J. Manag. Eng., 31, pp. 1-19.
109 Malik, N.A.F. (2006). Supply Chain Management in IBS Industry in Malaysian. International IBS Exhibition (MIIE) 2006 Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur.
110 Marchesi, M., and Matt, D.T. (2017). Design for mass customization: Rethinking prefabricated housing using axiomatic design. Journal of Architectural Engineering, 23(3).   DOI
111 Mole, T. (2001). Prefabrication in UK Housing: 'Innovation or Deja Vu' in CEEC/AEEBC Conference Dublin, Ireland 4th-6th October 2001.
112 Wuni, I.Y., Shen, G.Q., and Osei-Kyei, R. (2020). Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects, International Journal of Construction Management. May 2020.
113 Mun, Y.A., Kim, Y.A., and Park, M.J. (2013). "Domestic and Foreign Case Studies for the Improvement of Unit Modular Housing." Journal of the Architectural Institute of Korea, Planning & Design, 29(10), pp. 65-73.   DOI