• Title/Summary/Keyword: Number of railway

Search Result 582, Processing Time 0.022 seconds

Estimation of Hourly Variations in Public Transit Demand according to the Addition of Sales Facilities to Railway Stations: Focusing on Metro and Bus Transit Demand (철도역사 판매시설 증축에 따른 시간대별 대중교통 수요 변화 추정: 지하철 및 버스 수요를 중심으로)

  • Jang, Jaemin;Moon, Dae Seop;Kim, Sujeong;Gim, Tae-Hyoung Tommy
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.630-638
    • /
    • 2015
  • The total number of passengers on the KTX since its construction in 2004 surpassed 500 million in October, 2015. The operation of KTX made it possible to reach anywhere in a country in half a day, which subsequently altered people's lifestyle. As the KTX has become an important mode of transportation, there is a growing interest in the optimal size and location of its stations. Currently, the stations are constructed through public-private partnerships since a sufficient amount of budget is hard to secure only from the public sector; however, because railway stations are traditionally aimed at promoting public interests, an emphasis on the profitability of the private sector could compromise public interests. At this juncture, this study separately computes the number of users based on each of the two primary functions of the stations-as a railway station and as a sales facility-and estimates the numbers of people according to various transportation modes that are taken to access the stations. This estimation is applied to the case of Dongdaegu Station, which will open in 2016. Such an application helps to predict and respond to possible congestion as brought about by the expansion of the sales facility.

A Standardized Management Plan on the Characteristic Factor of Station to Meet a Customer Service in the Urban Transit (도시철도 고객서비스 만족을 위한 역 특성요소의 표준화 관리방안)

  • Kang, Tae-Soo;Kim, Seong-Ho;Bae, Kyung-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.3
    • /
    • pp.300-305
    • /
    • 2012
  • The saving of time, which is defined as the demand from passengers and the supply from the urban railway, must be balanced. The selected factors influencing on the balance are the traffic, customer contact facilities, the number of failures, customer complaints(VOC), passenger moving time and transfer stations. Also, the overall ratio of SMRT's 4 lines is generated by differentiating the rate of each attribute in each factor. This is not only to differentiate the stations with peculiar factors but also to standardize criteria of the personalized services. Furthermore, as part of standardization, standard drawings of facility management are prepared for the improvement on the management of human resource and material. The drawings include passenger moving lines, location of safety incidents and also indicate the rating of the factors in each station and overall evaluation rating. In conclusion, this thesis aims to improve customer satisfaction constantly by reducing passenger moving time, through the differentiated management of each station.

Fatigue Life Evaluation for Used Rail on Track Types (궤도형식별 사용레일의 피로수명 평가)

  • Kang, Sung Won;Lim, Hyung-Jun;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.649-657
    • /
    • 2017
  • In this study, fatigue testing was carried out for long-term use of rail according to track type. From S-N curves for 50%~0.01% failure probability, the fatigue life of the long-term use rail for each track type was derived using the weight probability analysis technique on the experimental data. Because the rails used in the fatigue test have different cumulative tonnages, the number of repetitions was modified by averaging the cumulative tonnage. In addition, the bending stresses of rail bottoms, considering rail surface irregularities, track support stiffnesses and train speeds, were evaluated using the predicted rail bending stresses derived from existing studies. As a result, for rail fatigue life evaluation, the fatigue life of rail on the ballast track was found to be more than 200 million tons higher than the standard value for rail replacement. Also, the fatigue life of rail on concrete track is more than 300 million tons higher than that on ballast track. The Haibach rule is adaptable for the fatigue life evaluation of rail for stress range under fatigue limit.

The LOS Analysis of Railway Station Facilities Based on Design Hourly Factor and Simulation (설계시간계수 및 Simulation 기반 철도역사 이용시설 LOS 분석)

  • Oh, Tae-ho;Lee, Seon-ha;Cheon, Choon-keun;Kim, Eun-ji;Yu, Byung-young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.3
    • /
    • pp.105-117
    • /
    • 2016
  • Recently the passenger of railway satisfaction levels are lowered. the reason why the railway station was built without considering the increased passenger due to diversification(transfer, shopping, and etc.) of the domestic railway station infrastructure. Especially, in case of KTX Gwangju-Songjeong Station, the number of its passenger has been increased about more than three times since its opening in 2015, so that there are much inconvenience generated in the station congested with passengers. his study aims to excute using Pedestrian simulation and Design Hourly Factor concepts of Highway Engineering, in order to designing the optimum area through the passenger demand forecast for each station. For this analysis was divided into the second stage. Frist, the railway passenger was calculated by using the methodology of Design Hourly Factor that is used during road design in the aspect of traffic engineering. Second, we tried to analyze the level of service in each railway station facility through the pedestrian simulation. Analytical results show that utilizing pedestrian simulation provides verification for calculation of LOS of each railway station facility. Therefore, In the future when designing railway station of facilities will be possible to suggest the facilities area based on LOS.

Evaluation of Transit Services based on Transit Smart Card Data (스마트카드 데이터를 활용한 대중교통 서비스 평가)

  • Choi, Myoung-Hun;Eom, Jin-Ki;Lee, Jun;Park, Jong-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1811-1825
    • /
    • 2011
  • This study analyzed the transit services with respect to transit service measures such as the load factor representing number of passengers between stops, dwelling time, and operational speed based on transit smart card data recorded in 2009. A case study on the local bus line 7024 connecting Seoul railway station to evaluate bus services at passenger perspectives was accomplished. From the results, we found that the dwelling time was not affected by the number of passengers which is because the tagging patterns are different among passengers. The operational speed was analyzed by calculating the average speed of the bus route and the speed of each bus stops based on dwelling time. Interestingly, calculating operation speed based on the transit smart card data is the first time effort ever made and this means that it is not necessary to observe travel speed of bus and railway at a field level any more. we hope that this study will be a basis of evaluation of transit services purely based on the transit smart card data and help to make better transit services for passengers and operators as well.

  • PDF

Thrust Characteristics Analysis considering the effect of the loops of flux in a LIM for Railway Transit (맴돌이 자속의 영향을 고려한 철도차량용 선형유도전동기의 추력 특성 연구)

  • Park, Chan-Bae;Lee, Hyung-Woo;Han, Kyung-Hee;Lee, Byung-Song;Kwon, Sam-Young;Park, Hyun-June
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1605-1609
    • /
    • 2007
  • In the case of Linear induction motor(LIM), numerical analysis method like Finite Element Method(FEM) has been mainly used to analyze the travelling magnetic field problem which includes the velocity-induced electromotive force. If the problem including the velocity-induced electromotive force is analyzed by FEM using Galerkin method, the solution can be oscillated according to Peclet Number, which is determined by conductivity, permeability, moving velocity and size of mesh. Consequently, the accuracy of the solution can be low and the Loops of flux can be occurred at the secondary back-iron. These loops of flux occurred at the secondary back-iron does not exist physically, but it can be occurred in the analysis. In this case, the loops of flux can be generally removed by using Up-Wind method which is impossible to apply a conventional S/W tool(Maxwell 2D). Therefore, in this paper, authors examined the Loops of flux occurred at the secondary back-iron of LIM according to variations of Peclet Number, and analyzed whether these loops of flux affect on the thrust force characteristics of LIM or not.

  • PDF

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

Setting the Service Reliability Target for Meeting the Punctuality Requirement of the Railroad System (철도시스템 정시성 요구조건을 만족하기 위한 서비스 신뢰도 목표값 설정)

  • Kim, Jong-Woon;Park, Jun-Seo;Chung, In-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.6-10
    • /
    • 2011
  • This article deals with a problem of setting reliability targets of the railroad systems where the punctuality target is given to the operator and a penalty is imposed for the year when the target is not met. The operator should set the reliability targets of the railroad system and sub-systems because the reliability affects the expected number of years when the penalty is imposed. This paper presents a procedure for setting the service reliability target and equations to calculate the expected number of years when the penalty is imposed and the probability that the operator should pay the penalty per year according to the mean kilometer between service failures of the railroad system and sub-systems.

A simple prediction procedure of strain-softening surrounding rock for a circular opening

  • Wang, Feng;Zou, Jin-Feng
    • Geomechanics and Engineering
    • /
    • v.16 no.6
    • /
    • pp.619-626
    • /
    • 2018
  • A simple prediction procedure was investigated for calculating the stresses and displacements of a circular opening. Unlike existed approaches, the proposed approach starts each step with a radius increment. The stress for each annulus could be obtained analytically, while strain increments for each step can be determinate numerically from the compatility equation by finite difference approximation, flow rule and Hooke's law. In the successive manner, the distributions of stresses and displacements could be found. It should be noted that the finial radial stress and displacement were equal to the internal supporting pressure and deformation at the tunnel wall, respectively. By assuming different plastic radii, GRC and the evolution curve of plastic radii and internal supporting pressures could be obtained conveniently. Then the real plastic radius can be calculated by using linear interpolation in the evolution curve. Some numerical and engineering examples were performed to demonstrate the accuracy and validity for the proposed procedure. The comparisons results show that the proposed procedure was faster than that in Lee and Pietrucszczak (2008). The influence of annulus number and dilation on the accuracy of solutions was also investigated. Results show that the larger the annulus number was, the more accurate the solutions were. Solutions in Park et al. (2008) were significantly influenced by dilation.

On effects of rail fastener failure on vehicle/track interactions

  • Xu, Lei;Gao, Jianmin;Zhai, Wanming
    • Structural Engineering and Mechanics
    • /
    • v.63 no.5
    • /
    • pp.659-667
    • /
    • 2017
  • Rail support failure is inevitably subjected to track geometric deformations. Due to the randomness and evolvements of track irregularities, it is naturally a hard work to grasp the trajectories of dynamic responses of railway systems. This work studies the influence of rail fastener failure on dynamic behaviours of wheel/rail interactions and the railway tracks by jointly considering the effects of track random irregularities. The failure of rail fastener is simulated by setting the stiffness and damping of rail fasteners to be zeroes in the compiled vehicle-track coupled model. While track random irregularities will be transformed from the PSD functions using a developed probabilistic method. The novelty of this work lays on providing a method to completely reveal the possible responses of railway systems under jointly excitation of track random irregularities and rail support failure. The numerical results show that rail fastener failure has a great influence on both the wheel/rail interactions and the track vibrations if the number of rail fastener failure is over three. Besides, the full views of time-dependent amplitudes and probabilities of dynamic indices can be clearly presented against different failing status.