• Title/Summary/Keyword: Noise & vibration-free screw concrete pile method

Search Result 5, Processing Time 0.024 seconds

Determination of Construction Method for Noise & Vibration-Free Screw Concrete Piles (무소음.무진동 스크류콘크리트말뚝의 시공법 설정)

  • Choi, Yong-Kyu;Kim, Dong-Chul;Kim, Sung-Su;Nam, Moom-S.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.360-368
    • /
    • 2010
  • Noise and vibration triggered by pile driving in a construction site not only give hard time to the surrounding areas but could also cause residents nearby to file civil complaints to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop low noise & low vibration pile methods. A noise & vibration-free screw concrete pile method proposed in this study is one of the successful outputs. It penetrates pile underground by rotating and pressing in body of the pile to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method.

  • PDF

A Study on the Determination of Construction Method of Screw Concrete Piles for Noise & Vibration-Free (무소음・무진동을 위한 스크류콘크리트말뚝의 시공법설정에 관한 연구)

  • Choi, Yongkyu;Kim, Dongchul;Kim, Sungsu;Nam, Moonseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.7
    • /
    • pp.15-24
    • /
    • 2010
  • Noise and vibration due to pile driving cause residents nearby construction sites to file civil complaints and to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop several types of low noise & low vibration pile methods. In this study, a new noise and vibration-free precast screw pile method proposed as a low noise & low vibration pile. It penetrates into the ground by rotating and pressing to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method. Based on this study, features of the noise & vibration-free screw pile method, production of screw concrete pile prototype, two pilot tests and subsequent construction method were determined.

Behavior Analysis of Noise & Vibration-Free Screw Concrete Piles by Means of Numerical Analysis (무소음・무진동을 위한 스크류콘크리트말뚝의 수치해석에 의한 거동분석)

  • Kim, Youngpil;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.6
    • /
    • pp.21-29
    • /
    • 2010
  • In this study, a new noise & vibration-free screw concrete pile method that was expected environmentally friendly method was introduced, also the numerical analyses of a conventional PHC pile and a new screw concrete pile were done. As a result, the bearing capacity behavior and the settlement behavior of 2 kinds of concrete pile were analyzed and compared.

An Analysis on the Vertical Load Bearing Behavior according to Construction Methods of a Environment-friendly Screw Concrete Pile for the Noise and Vibration-free Method (무소음.무진동 공법을 위한 환경친화적인 스크류콘크리트말뚝의 시공방법에 따른 연직하중지지거동 분석)

  • Kim, Dongchul;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.6
    • /
    • pp.5-11
    • /
    • 2013
  • Because the regulation for a noise and a vibration in our country has been being reinforced more and more, a more environment-friendly pile construction method than a current low-noise and low-vibration method was needed for the close construction in the downtown area. In this study, the characteristics of a screw concrete pile method for noise and vibration-free method was explained, and it's vertical bearing capacity was studied in the base of the static pile load test data of the screw concrete piles. Constructed by two methody; a pre-digging shoe type construction method and a toe-jetting shoe type construction method. The vertical load bearing capacity of a screw pile constructed by the former was more about 70% than that of a screw pile constructed by the latter.

A Characteristics of the Strength Recovery of the Soil Adjacent to the Pile Depending on the Construction Methods of a Environment-friendly Screw Concrete Pile for a Noise- and Vibration-free Method (무소음·무진동을 위한 환경친화적인 스크류콘크리트말뚝의 시공법에 따른 말뚝 인접 지반의 강도 회복 특성)

  • Kim, Dong-Chul;Choi, Youngkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.71-80
    • /
    • 2013
  • Before and after the test constructions, and after an 11-month hiatus from the pilot pile installations, the in-situ tests (CPT, SPT) were carried out at the ground adjacent to the noise- and vibration-free screw concrete piles installed by 2 kinds of construction methods (i.e., the toe-jetting shoe type, the pre-digging type). In the toe-jetting shoe type construction methods, after construction, the soil strength within 3.5D (where, D = pile diameter) from the pile center decreased greatly by about 46% of the original ground and, after an 11-month hiatus, a strength recovery adjacent to the piles appeared about 71% of the original ground. In the pre-digging type construction methods, a strength recovery adjacent to the piles appeared 100% of the strength of the original ground.