Browse > Article

A Study on the Determination of Construction Method of Screw Concrete Piles for Noise & Vibration-Free  

Choi, Yongkyu (경성대학교 토목공학과)
Kim, Dongchul (경성대학교 대학원 건설환경공학과)
Kim, Sungsu (무성토건)
Nam, Moonseok (한국도로공사 도로교통연구원)
Publication Information
Journal of the Korean GEO-environmental Society / v.11, no.7, 2010 , pp. 15-24 More about this Journal
Abstract
Noise and vibration due to pile driving cause residents nearby construction sites to file civil complaints and to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop several types of low noise & low vibration pile methods. In this study, a new noise and vibration-free precast screw pile method proposed as a low noise & low vibration pile. It penetrates into the ground by rotating and pressing to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method. Based on this study, features of the noise & vibration-free screw pile method, production of screw concrete pile prototype, two pilot tests and subsequent construction method were determined.
Keywords
Noise & vibration; Screw concrete pile method; Pilot tests;
Citations & Related Records
연도 인용수 순위
  • Reference
1 최용규, 김동철. 김성수, 남문석(2009), 무소음.무진동 스크류 PHC말뚝의 개발 및 시험시공 계획, 2009 기초기술위원회 Workshop, 한국지반공학회, pp. 18-33.
2 황정환, 김성수, 김동철, 최용규(2009), 무소음.진동 스크류 말뚝 시험 시공, 2009년도 정기 학술대회 논문집, 대한토목학회, pp. 879-84.
3 Van Impe, W.F.(1988), Considerations on Auger Pile Design, in Proceedings, First International Geotechnical Seminar on Deep Foundations on Bored and Auger Piles, Balkema, Rotterdam, pp. 193-218.
4 Van Impe, W. F.(1996), Deep Foundations on Screw Piles, 말뚝기초 국제 학술발표회 논문집, 한국지반공학회, pp. 109-151.