• Title/Summary/Keyword: NATM tunnel

Search Result 239, Processing Time 0.029 seconds

Analysis and cause of defects in reinforced cement concrete lining on NATM tunnel based on the Precise Inspection for Safety and Diagnosis - Part I (정밀안전진단 결과를 활용한 NATM (철근)의 라이닝 결함 종류별 발생원인 및 분석 - Part I)

  • Choo, Jinho;Lee, Inmo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.1-29
    • /
    • 2019
  • Related to the previous paper on the typical crack pattern of tunnel lining with NATM, the characteristic defects in reinforced cement concrete lining of NATM tunnel have analyzed with the precise inspection with safety and diagnosis (PISD) by KISTEC. Depending on the reinforcing materials, steel rebar, steel fiber, and glass fiber have been implemented to reinforcing lining in various NATM tunnel constructions. Reinforcing lining with rebar are prevailed on NATM tunnel to countermeasure the weak geological circumstances, to pursuit the economical tunnel sections, and to resist the risk of tunnel deterioration. By the special act on the safety control of public facilities, the reinforced NATM tunnels for more than 1 km length are scrutinized closely to characterize defects; crack, reinforcement exposure, and lack of lining. Crack resistance by reinforcing is shown in comparison with the normalized crack to the length of tunnel. Typical exposed reinforcements in lining have exemplified with various sections. The lack of lining due to the mal-construction, spalling, fire, earthquake and leaching has been analyzed. The cause and mechanism with the field inspections and other studies has also been verified. Detailed cases are selected by the above concerns as well as the basic information from FMS (Facilities Management System). Likewise the previous paper, this study provides specialized defects in reinforced lining of NATM and it can be widely used in spreading the essential technics and reporting skills. Furthermore, it would be advised and amended for the detail guideline of Safety Diagnosis and PISD (tunnel).

Norwegian Method of Tunnelling (노르웨이 터널 시공 방법)

  • 김치환;임경호;이석천
    • Tunnel and Underground Space
    • /
    • v.4 no.1
    • /
    • pp.47-54
    • /
    • 1994
  • NATM has been applied most of tunnel design and construction in Korea these days. But, if you observe the tunnel designing method and construction conditions, you can see that the NATM isn's usually the most suitable to Korean geology. Also most of engineers feel that it is necessary to understand the NATM correctly adn to introduce another tunnelling principle which can be applied more economically and safely. So, we'd like to introduce a new tunnelling concept. Norwegian Method of Tunnelling(NMT) by comparing the NATM. The main character of NMT is that the forward prediction of conditions and the support of tunnel is done through geological investigation in details. And it can be compared with NATM, in which the support pattern is decided by monitoring of tunnel deformation on the construction.

  • PDF

A Study on Disaster Influencing Factors and Importance for Safety Management in NATM Tunnel Drilling (NATM 터널 굴진 시 안전관리를 위한 재해영향요인 및 중요도에 관한 연구)

  • Lee, YoungSoo;Yoon, Younggeun;Oh, Taekeun
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.757-763
    • /
    • 2022
  • In the NATM tunnel construction method for urban subway and underpass construction, various causes of disaster exist. In this study, in order to analyze the importance of disaster influencing factors during NATM tunnel excavation, the possible risk factors were analyzed through prior research such as drilling, charging and blasting, It was divided into the work items of wrinkle treatment, pumice cleanup, and support materials. Next, the final 21 detailed measurement indicators were selected through the FGI survey of related experts, and AHP (Analytic Hierarchy Process) analysis were conducted. As a result, it was found that the workers involved in the tunnel construction were the most influential disaster influencing factor.

Disadvantages of Single Shell NATM (SINGLE SHELL NATM의 문제점)

  • 윤지선
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.138-143
    • /
    • 2002
  • These days, domestic tunnel demand has outstandingly been increased. Therefore, tunneling methods have been developed to excavate underground more economically and endurably from wood support methods, ASSM, to NATM and also more efficient methods has strongly been asked in recent years, such as single shell NATM. In this study, we will discuss on the disadvantages of this single shell NATM, one of tunneling methods with no lining.

  • PDF

A Study On a Method of Improvement From Domestic NATM Case (NATM 시공 사고 사례에 의한 개선방안 연구)

  • 이상웅
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.19-30
    • /
    • 1995
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.

  • PDF

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

A Study on a Method of Improvement from Domestic NATM Case (국내 NATM시공 사고사례에 의한 개선방안 연구)

  • 김무일;이상웅
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.4
    • /
    • pp.92-102
    • /
    • 1994
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.

  • PDF

Application of the Measurements Control System to NATM Tunnel Constructed in Urban Area (도심지 NATM 터널에서의 계측관리시스템 적용 연구)

  • 장정범;김용일;김영근;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.3
    • /
    • pp.193-204
    • /
    • 1995
  • Since the significance of measurements during tunnel construction is not recognized, measurements have not been implemented except for a few very important construction site. As the tunnel construction by NATM increases, the importance of measurements is being emphasized. But, due to the lack of practical experiences and theoretical background in measurements techniques, systematic measurements control system has not yet been established. In this study a measurements control system, successfully used in the urban tunnel construction, is introduced.

  • PDF

Failure Mechanism of NATM tunneling using Computational Methods and Geology Investigation (수치해석수법과 지질공학적 분석을 통한 NATM터널의 붕괴메커니즘에 관한 연구)

  • Lee, Jae-Ho;Kim, Young-Su;Choi, Hea-Jun;Jeong, Yun-Young;Jin, Guang-Ri;Rim, Hong-Rae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.742-753
    • /
    • 2008
  • Currently an increasing number of urban tunnels with small overburden are excavated according to the principle of the New Austrian Tunneling Method (NATM). Therefore, a possibility of a tunnel collapse during excavation is getting higher in a proportionate manner. This paper will analyze causes the failure mechanism of a shallow NATM tunnel for different geological conditions, ground-water and invert solutions by investigation typical collapse site during tunnel construction. In this paper, this analysis performed two phase, firstly, the field investigation considering displacement measurement, ground-water level, geological characteristic, secondly, the numerical simulation considering the exist of invert construction and the effect of ground-water. It has been found that environmental factors such as state of underground water or construction sequences could influence failure mechanism of a shallow tunnel.

  • PDF

Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I (정밀안전진단 결과를 활용한 NATM터널(무근)의 라이닝 균열 종류별 발생원인 및 분석 - Part I)

  • Choo, Jin-Ho;Park, Sung-Woo;Kim, Hyung-Tak;Jee, Kee-Hwan;Yoon, Tae-Gook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.199-214
    • /
    • 2011
  • A crack is the main cause to affect the integrity of tunnel lining as well as leakage, spalling, exposed rebar, corrosion, carbonation and so on. Since the 1980, NATM has prevailed on excavation method and geotechnical philosophy in tunnel. Although the pattern of cracks has been reported by several engineers' effort, it was only focused on longitudinal cracks of lining. Eleven operational NATM tunnels have been conducted with the precise inspection for safety and diagnosis by KISTEC (Korea Infrastructure Safety and Technology Incorporation). With those results, the crack patterns by the spatial distribution and appearance for each tunnel have been analyzed and the cause of occurrence for seven common types of cracks in NATM tunnels was classified. Additionally, the longitudinal crack on lining above duct slab was figured out by numerical simulation and field inspection. Each crack has been analyzed by CCD (Charge-Coupled Device) scanner image with 3D configuration. Each type of cracks is also explained with output of experimental and condition of construction. Defined cracks on NATM tunnels will be good example for periodical inspection and precise inspection for safety and diagnosis.