• Title/Summary/Keyword: Multi-reservoir Operation

Search Result 81, Processing Time 0.024 seconds

A Stochastic Dynamic Programming Model to Derive Monthly Operating Policy of a Multi-Reservoir System (댐 군 월별 운영 정책의 도출을 위한 추계적 동적 계획 모형)

  • Lim, Dong-Gyu;Kim, Jae-Hee;Kim, Sheung-Kown
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.1-14
    • /
    • 2012
  • The goal of the multi-reservoir operation planning is to provide an optimal release plan that maximize the reservoir storage and hydropower generation while minimizing the spillages. However, the reservoir operation is difficult due to the uncertainty associated with inflows. In order to consider the uncertain inflows in the reservoir operating problem, we present a Stochastic Dynamic Programming (SDP) model based on the markov decision process (MDP). The objective of the model is to maximize the expected value of the system performance that is the weighted sum of all expected objective values. With the SDP model, multi-reservoir operating rule can be derived, and it also generates the steady state probabilities of reservoir storage and inflow as output. We applied the model to the Geum-river basin in Korea and could generate a multi-reservoir monthly operating plan that can consider the uncertainty of inflow.

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( III ) - Multi Reservoir Operation Methods - (퍼지제어모형을 이용한 다목적댐의 홍수조절모형 (III) - 댐군의 연계운영방안 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.61-72
    • /
    • 2004
  • In this research, multi reservoir operation methods for reservoirs in Han River are proposed based on the single dam operation models using fuzzy control techniques. The result of fuzzy controled single dam operation has shown that it can improve flood controllability at the downstream of dams. Among the many control rules of fuzzy operation, a rule that shows the most effective flood control rate at the downstream has been selected as Ike operation rule. The simulated results for 1990 and 1995 flood events are compared with historical ones. As the results, it is founded that suggested models can reduce the inundation of upstream and keep the water elevation lower at downstream, which make the proposed models as the effective methods in multi reservoir operation.

Development of Han River Multi-Reservoir Operation Rules by Linear Tracking (선형추적에 의한 한강수계 복합 저수지 계통의 이수 조작기준 작성)

  • Yu, Ju-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.733-744
    • /
    • 2000
  • Due to the randomness of reservoir inflow and supply demand it is not easy to establish an optimal reservoir operation rule. However, the operation rule can be derived by the implicit stochastic optimization approach using synthetic inflow data with some demand satisfied. In this study the optimal reservoir operation which was reasonably formulated as Linear Tracking model for maximizing the hydro-energy of seven reservoirs system in the Han river was performed by use of the optimal control theory. Here the operation model made to satisfy the 2001st year demand in the capital area inputted the synthetic inflow data generated by multi-site Markov model. Based on the regressions and statistic analyses of the optimal operation results, monthly reservoir operation rules were developed with the seasonal probabilities of the reservoir stages. The comparatively larger dams which would have more controllability such as Hwacheon, Soyanggang, and Chungju had better regressions between the storages and outflows. The effectiveness of the rules was verified by the simulation during actually operating period.period.

  • PDF

Ranking the Pareto-optimal Solutions using DEA-based Ranking Procedure: an Application to Multi-reservoir Operation Problem (DEA기반 순위결정 절차를 이용한 파레토 최적해의 우선순위 결정: 저수지군 연계 운영문제를 중심으로)

  • Jeon, Seung-Mok;Kim, Jae-Hee;Kim, Sheung-Kown
    • IE interfaces
    • /
    • v.21 no.1
    • /
    • pp.75-84
    • /
    • 2008
  • It is a difficult task for decision makers(DMs) to choose an appropriate release plan which balances the conflicts between water storage and hydro-electric energy generation in a multi-reservoir operation problem. In this study, we proposed a DEA-based ranking procedure by which the DM can rank the potential alternatives and select the best solution among the Pareto-optimal solutions. The proposed procedure can resolve the problem of mix inefficiency that may cause errors in measuring the efficiency of alternatives. We applied the proposed procedure to the multi-reservoir operation problem for the Geum-River basin and could choose the best efficient solution from the Pareto-set which were generated by the Coordinated Multi-Reservoir Operating Model.

A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir) (위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로))

  • Park, Myeong-Gi;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.1
    • /
    • pp.37-49
    • /
    • 2002
  • The application of conventional method for optimizing firm water supply and hydro-electric power generation has some limitation during abnormal or extreme drought periods. Hashimoto et al. (1982) suggested there risk evaluation criteria such as reliability, resilience, and vulnerability. These three criteria have been incorporated into a mixed-integer programming model for evaluating the possible performance of water- supply reservoir (Moy et al., 1986; Srinivasan et al., 1999). However, till now, these kind of researches have been conducted only for water-supply reservoir. Therefore there have been no other study for multi-purpose dam including hydro-electric power generation. This study presents an improved formulation of the previous model for evaluating a multi-purpose reservoir system operation considering water supply and hydro-electric power generation. The modified model was applied to the Daechung multi-purpose reservoir system in the Keum river basin to demonstrate the efficiency of the improved formulation.

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

A Practical Research for More Efficient Utilization of Water Resources in the South-Western Part of Korea (서남부지역 수자원의 효율적 이용방안)

  • 김현영;서영제;최용선;문종원
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.279-286
    • /
    • 1998
  • The south-western part of Korea is situated in an unbalance of water supply and demand relating to the Keum, Mankyung, Dongjin and Youngsan River and their estuary reservoirs. For example, the Keum River estuary reservoir is discharging the larger amount of yearly runoff into the sea due to the small storage capacity, while Saemankeum estuary reservoir which is under construction, has the smaller runoff amount comparing with its storage capacity, And the downstream area of the Youngsan River, such as Youngkwang, Youngam are deficient in water due in larger demand and smaller supply. In order to solve the above unbalanced water supply and demand and also to improve the water use efficiency, the Hierarchical Operation Model for Multi-reservoir System(HOMMS) has been developed and applied to analyze the multi-reservoir operation assuming that the above reservoirs were linked each other. The result of this study shows that 2,148MCM of annual additional water requirement for agricultural and rural water demands are required in this region at 2011 of target year, and these demands can be resolved by diverting and reusing 1,913MCM of the released water from the estuary reservoirs into the sea.

  • PDF

An Evaluation of Multi-Reservoir Operation Weighting Coefficients Using Fuzzy DEA taking into account Inflow Variability (유입량의 변동성을 고려한 Fuzzy DEA 기반의 댐 군 연계운영 가중치 대안 평가)

  • Kim, Yong-Ki;Kim, Jae-Hee;Kim, Sheung-Kown
    • IE interfaces
    • /
    • v.24 no.3
    • /
    • pp.220-230
    • /
    • 2011
  • The multi-reservoir operation problem for efficient utilization of water resources involves conflicting objectives, and the problem can be solved by varying weight coefficient on objective functions. Accordingly, decision makers need to choose appropriate weight coefficients balancing the trade-offs among multiple objectives. Although the appropriateness of the weight coefficients may depend on the total amount of water inflow, reservoir operating policy may not be changed to a certain degree for different hydrological conditions on inflow. Therefore, we propose to use fuzzy Data Envelopment Analysis (DEA) to rank the weight coefficients in consideration of the inflow variation. In this approach, we generate a set of Paretooptimal solutions by applying different weight coefficients on Coordinated Multi-reservoir Operating Model. Then, we rank the Pareto-optimal solutions or the corresponding weight coefficients by using Fuzzy DEA model. With the proposed approach, we can suggest the best weight coefficients that can produce the appropriate Pareto-optimal solution considering the uncertainty of inflow, whereas the general DEA model cannot pinpoint the best weight coefficients.

Flood Control Operation Model of Reservoir Using CSUDP (CSUDP를 이용한 홍수기 댐운영)

  • Lim, Kwang-Suop;Shim, Kyu-Cheoul;Hwang, Yeon-Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.918-922
    • /
    • 2006
  • The purpose of this study is development of operation model for flood control of multi-reservoir in river basin, which can provide the best decision of reservoir release in timely and appropriately manner using CSUDP. For verification and validation of the developed system, the Gum River Basin was selected, which has 82 rainfall gauging stations, 28 water level gauging and 2 multi-purpose reservoirs which can control flood. There was a successful simulation of the developed model and system, using the real-time data from the Han River Basin Flood Forecast Center. Specially, case study for '1995 flood was performed.

  • PDF

Reevaluation of Operational Policies for a Reservoir System

  • Ko, Ick-Hwan;Choi, Ye-Hwan
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.2
    • /
    • pp.1-8
    • /
    • 1997
  • Abstract The need for integrated reservoir system operation become more intense as the demands from the system increase. A deterministic, three-dimensional discrete incremental dynamic programming approach is presented to derive reservoirs system operational planning strategies. The developed H3DP model optimizes the monthly operation of the Hwachon and Soyang Projects on the North Han river and Chungju Main Project on the South Han river. By using the H3DP model, Hwachon project was reevaluated as a component of the upstream multipurpose storage reservoirs in the basin based on 1993 hydrology. This case study demonstrates the practical use of the developed model for the basin multi-reservoir system operation in an integrated, multipurpose fashion.

  • PDF