• 제목/요약/키워드: Monitoring and evaluation

검색결과 2,573건 처리시간 0.033초

Evaluation of Structural Integrity and Performance Using Nondestructive Testing and Monitoring Techniques

  • Rhim, Hong-Chul
    • 한국지진공학회논문집
    • /
    • 제2권3호
    • /
    • pp.73-81
    • /
    • 1998
  • In this paper, the necessity of developing effective nondestructive testing and monitoring techniques for the evaluation of structural integrity and performance is described. The evaluation of structural integrity and performance is especially important when the structures and subject to abrupt external forces such as earthquake. A prompt and extensive inspection is required over a large area of earthquake-damaged zone. This evaluation process is regarded as a part of performance-based design. In the paper, nondestructive testing and monitoring techniques particularly for concrete structures are presented as methods for the evaluation of structural integrity and performance. The concept of performance-based design is first defined in the paper followed by the role of evaluation of structures in the context of overall performance=based design concept. Among possible techniques for the evaluation, nondestructive testing methods for concrete structures using radar and a concept of using fiber sensor for continuous monitoring of structures are presented.

  • PDF

국내 작업환경측정기관의 측정 및 분석장비 보유실태에 대한 고찰 (II) (Evaluation of the Possession of Measurement and Analytical Instruments in Domestic Work Environment Monitoring Service Providers (II))

  • 장재길
    • 한국산업보건학회지
    • /
    • 제24권2호
    • /
    • pp.182-192
    • /
    • 2014
  • Objectives: The aim of this study is to analyze the current status of possession of measurement and analytical instruments at work environment monitoring organizations and their relationships with human resources, including the number of professional engineers and evaluation scores resulting from evaluation programs in 2012. Materials: Data for measurement and analytical instruments were gathered by inspectors who had been assigned by the Korea Occupational Safety and Health Agency(KOSHA) and the Ministry of Employment and Labor(MoEL) during the evaluation program for 2012. Data for 11 monitoring instruments and nice pieces of analytical equipment were collected from 103 organizations. Additional data such as the type of service provides and the number of professional engineers employed were also recorded by the inspectors. Evaluation scores could be acquired from KOSHA. Results: Comprehensive Occupational Health Service Providers showed good operation quality, while University or Hospital Subsidiary and Work Environment Monitoring Organizations recorded relatively poor results. Evaluation scores correlated well with the possession of measurement instruments and human resources for each organization. High yields provided by professional engineers also showed statistically-associated contributions to evaluation scores and monitoring instrument possession. Compared with monitoring instruments, the amount of analytical equipment had little positive impact on organizations' competence. Conclusions: The evaluation results for domestic monitoring organizations revealed that human resources, possession of instruments, and the quality of employees were critical factors for operating the corporations. Each organization should give considerable effort to improving their ability to strengtheninternal quality, resulting in high-yield production for workers and employers by providing improved workplace monitoring services.

Enterprise Architecture for e-Government Monitoring and Evaluation Reporting System Based on Customer Satisfaction Perspective in Indonesia

  • Anggraeni, Tri
    • 정보화연구
    • /
    • 제11권2호
    • /
    • pp.131-141
    • /
    • 2014
  • Refining the monitoring and evaluation reporting is an important thing in e-Government. Indonesia which has had e-Government roadmap since 2000, has not had the systematic mechanism to monitor and evaluate e-Government in which the report can be easily accessed by the public and used to be the best practice to improve other e-Government implementation. Enterprise architecture (EA) has the major objective to straighten an enterprise to its necessary requirements. It can be used to propose the required system and that was the purpose of this paper. It was started by reviewing the literature about e-Government monitoring and evaluation, using quality of service as the means, and understanding TOGAF as one of EA framework. The second step was comparing EA and the evaluation of e-Government in Korea and Indonesia to get the best practices. And the last step was creating EA for the monitoring and evaluation reporting system based on Korea and the literature reviewed. It is expected that the formulized EA can be a tool to improve e-Government implementation in Indonesia.

일개 의과대학 교육프로그램 평가체제에 대한 연구 (Educational Program Evaluation System in a Medical School)

  • 윤소정;이상엽;임선주
    • 의학교육논단
    • /
    • 제22권2호
    • /
    • pp.131-142
    • /
    • 2020
  • A systematic educational program evaluation system for continuous quality improvement in undergraduate medical education is essential. Monitoring and evaluation (M&E) are two distinct but complementary processes referred to in an evaluation system that emphasizes formative purpose. Monitoring involves regular data collection for tracking process and results, while evaluation requires periodic judgment for improvement. We have recently completed implementing an educational evaluation using the M&E concept in a medical school. The evaluation system consists of two loops, one at the lesson/course level and the other at the phase/graduation level. We conducted evaluation activities in four stages: planning, monitoring, evaluation, and improvement. In the planning phase, we clarified the purpose of evaluation, formulated a plan to engage stakeholders, determined evaluation criteria and indicators, and developed an evaluation plan. Next, during the monitoring phase, we developed evaluation instruments and methods and then collected data. In the evaluation phase, we analyzed results and evaluated the criteria of the two loops. Finally, we reviewed the evaluation results with stakeholders to make improvements. We have recognized several problems including excessive burden, lack of expertise, insufficient consideration of stakeholders' evaluation questions, and inefficient data collection. We need to share the value of evaluation and build a system gradually.

GIS for Agricultural Project and Program Evaluation

  • Punyaratabandhu, Sompit
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.38-40
    • /
    • 2003
  • Project monitoring and evaluation is very important, as it can be used to indicate progress and success, including problems and impact of the project. It can also be used for improving project plan, administration, and management. GIS is the visualization method that is extremely helpful in decision making and planning. So GIS is an appropriate tool for agricultural project and program monitoring and evaluation. There are three ways of using GIS in project undertakings i.e. GIS for feasibility studies, GIS for project and program monitoring, and GIS for project and program evaluation.

  • PDF

현장계측에 의한 연약지반 성토의 안정관리 기법 (Stabuility Evaluation Methods of Soft Clay under Embankment by Field Monitoring)

  • 강예묵
    • 한국농공학회지
    • /
    • 제41권2호
    • /
    • pp.92-103
    • /
    • 1999
  • A series of field tests were performed to suggest a rational method for the stability evaluation of soft clay. The behavior of settlement-displacement obtained by field monitoring system was used to compare and analyze with various stability evaluation methods, and to investigate the applicability of the methods for stability evaluation of soft clay. The limit equilibrium method, numerical analysis and field monitoring methods were used to analyze the stability evaluation. The horizontal displacement was abruptly increased when physicla properties of soft clay reached its maximum values and therefore, the values of these properties could be used to the fundamental data for stability evaluation. The evaluation of the stability of clay embankment was suggested to use inclination of ccrve rather than critical line, and the minimum satey factor of 1.2 or larger for natural clay was recommeded . Therefore, the evaluation of short term stability of soft clay could be effectively peformed with the hypefrbolic model and the field monitored data.

  • PDF

지역역량강화 프로그램의 효과성 평가 - 대관령면 지역을 중심으로 - (Effectiveness Evaluation of Community Empowerment Program - Focusing on Daegwallyeong-Meyeon -)

  • 김기성;정미경
    • 농촌계획
    • /
    • 제26권2호
    • /
    • pp.71-82
    • /
    • 2020
  • This study conducted monitoring and outcome evaluation of three newly-established programs in 'Community Empowerment program in 2019' in Daegwallyeong-myeon. The purpose of the study is to find out the organic relationship between the process and result of the program and its effect on participants by performing two evaluation methods in parallel on the target program. As a result of the research, first, it was found that there was a difference in the degree of acceptance of feedback depending on the instructor who is charging each program. Second, there were two categorized results such as the depth and direction which is changed by the number of monitoring, or similar content being repeated. Third, there was an organic relationship between monitoring evaluation and outcome evaluation. Therefore, it can be said that it is highly likely to lead to more systematic and meaningful results if the community empowerment program is monitored as a process evaluation and outcome evaluation.

대기오염도 실측에 의한 대기오염 자동측정망의 대표성 평가 (Evaluation of the Representativeness of Air Quality Monitoring Network in Seoul through Actual Measurement)

  • 전의찬
    • 환경영향평가
    • /
    • 제5권1호
    • /
    • pp.79-85
    • /
    • 1996
  • Simultaneous monitoring in many locations is necessary to evaluate the air quality and analyze future trend of a city, For this purpose, it is essential to install air pollution monitoring network. The first automatic air pollution monitoring network was introduced Seoul in 1973. As of 1995, 20 monitoring stations are now in operation. Concerning the management of the air pollution monitoring network, there was some argument among the relavant scholars, non-governmental organization(NGO) and the government organization. So far, there was no extensive evaluation and analysis about the network. The purpose of this study was to evaluate the representativeness of air quality monitoring network through actual measurement of the concentration of the air pollutant. The concentration of NOx was extensively measured widely in Seoul area three times using the TEA simple measuring technique. Even the judgement level for the area representativeness was lowered to 80%, Ssangmun-dong monitoring station tend to overestimate the pollutant concentration of the covered area. While, Sinlimdong monitoring station tend to underestimate the pollutant concentration of the covered area.

  • PDF

국내 석면조사기관의 품질관리 수준에 대한 평가 (Evaluation of Quality Management of Domestic Asbestos Survey and Monitoring Service Providers)

  • 권지운
    • 한국산업보건학회지
    • /
    • 제29권2호
    • /
    • pp.217-225
    • /
    • 2019
  • Objectives: The aim of this study is to evaluate the quality management systems of domestic asbestos survey and monitoring service providers and the relationships with the number of licenses or designations and sales performances. Methods: Data on quality management systems were collected by assessors who were assigned by the Korea Occupational Safety and Health Agency(KOSHA) during a pilot evaluation program for designated asbestos survey and monitoring service providers in 2016 using evaluation criteria developed by KOSHA. Basic characteristics, evaluated scores, and sales performance were gathered and statistically analyzed. Results: The median and arithmetic mean of the total scores were 0.64 and 0.66. Evaluation fields that scored highly with the highest percentages were sales performance, installation and availability of equipment, compliance with the mandatory minimum number of airborne samples, laboratory independence, and results of proficiency analytical testing, in that order. Evaluation fields that received low marks with the highest percentages were the training of personnel, blank field samples, calibration of flow rates, preliminary check and visual inspection of the work area prior to the clearance test, and review and approval of final reports, in that order. Comparison of normalized scores between service providers registered for asbestos and other tasks and those designated for only asbestos showed significant differences in their evaluated scores. Sales performance did not show a positive correlation with evaluated scores. Conclusions: The quality management systems of domestic asbestos survey and monitoring service providers were poor. High scores were recorded mostly in evaluation fields related to regulatory requirements. Low scores were recorded mostly in evaluation fields related to documentation and recordkeeping. Considering the low influence of quality on sales performance, the government needs to evaluate the quality management of asbestos survey and monitoring service providers and provide the results to public in order to address their low levels of quality management.

국가연구개발사업 중간평가방법 연구-선도기술개발사업에의 적용사례-

  • 임윤철;이철원
    • 기술혁신연구
    • /
    • 제5권2호
    • /
    • pp.126-154
    • /
    • 1997
  • This paper addresses a methodology for monitoring the first phase('92-94') progress and its implication fo Highly Advanced National R&D Projects (HAN or G7 project) in Korea. The authors suggest a three-stage life cycle model for the management of national R&D program; planning stage, implementing & monitoring stage, and evaluating & harvesting stage. The interim evaluation, the main focuses of this paper, is one of the key issues for the effective management of national R&D program at the implementing & monitoring stage. The conceptual framework of the interim evaluation was developed both through reviewing related literature and considering the characteristics of the HAN program. A stepwise procedure of interim evaluation was introduced: 'initial screen' and 'detailed examination'. At initial screen all 11 projects were reviewed in terms of both their relevance and performance in order to decide whether further detailed scrutiny is needed or not. If there exist critical problems on the relevance or on the intermediate progress of each project, it is to be under further detailed examination. Evaluation was initiated by the G7 Planning and Evaluation Committee, which was established for advising, directing, and monitoring the HAN Projects, with the help of large number of experts from industries, universities, and research institutes. The monitoring results were reported to the related ministries and project coordinating agencies, and reflected in the second phase.

  • PDF