Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

Comparison of Characteristics for Establishing Quality Standards of Modular Buildings for Temporary Classrooms (임시교실용 모듈러 건축물의 품질기준 마련을 위한 특성비교)

  • Lee, Jong Sung;Park, Jae-Woong;Lim, Gun-Su;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.83-84
    • /
    • 2023
  • Wall structure smart modular is a building construction method where modules are manufactured in a factory and assembled on-site. This method is gaining popularity in the construction industry as it reduces construction time and mitigates risks such as material supply and labor costs. Wall structure smart modular is necessary as it provides comfortable temporary classroom space during renovation and remodeling of aging school buildings. The structure and characteristics of each type of temporary classroom modular were compared, and wall structure modular showed superior performance in terms of height and weight competitiveness compared to mixed structures. With these advantages, wall structure modular can ensure economic efficiency and recyclability as a temporary classroom. In the future, we aim to compare and analyze the standards such as inter-floor noise and heat transfer coefficient for wall structure and mixed structures.

  • PDF

Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction (모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출)

  • Kim, Min Ju;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab (강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해)

  • Bang, Jong-Dae;Chun, Chu-Young;Park, Ji-Young;Kim, Jong-Yeob;Kim, Gap-Deug;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.305-314
    • /
    • 2014
  • The technology-intensive unit modular method of factory production method is attracting attention by the limit of the labor-intensive and field centered wet construction method. In recent years, the unit modular method has been applied to the construction of schoolhouse and BOQ(bachelor offices' quarters), dormitories, etc. But the modular method still is not used in housing construction by the lack of verification of resident performance and construction cost. Therefore, this study analyzed the economics of modular house to vitalize the constructed residential building by modular method and to develop the modular method. According to the study results, the construction cost of the modular house was analysed more about 6.2% expensive than that of the existing housing. However, if the construction duration of modular house is shortened or the productivity of modular house is increased, the construction cost of modular house will be similar to the that of the existing house.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit (모듈러 경제성 확보를 위한 공장생산 프로세스의 다기능공 적용 방안)

  • Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.

Seismic Performance Assessment of a Modular System with Composite Section (합성단면을 적용한 모듈러 시스템의 내진 성능평가)

  • Choi, Young-Hoo;Lee, Ho-Chan;Kim, Jin-Koo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.69-77
    • /
    • 2017
  • By producing pre-engineered modular system in the factory, It is enable to expedite construction and can be distinguished from two types by the method resisting load. One is the open-sided modular system composed of beams and columns. The other is enclosed modular system composed of panels and studs. Of the modular systems, the open-sided modular system buildings the connection between modules are difficult due to closed member sections, and the overall strength is reduced as a result of local buckling. In this study, in order to solve these problems, a modular system with folded steel members filled with concrete are proposed. The capacity spectrum method presented in ATC 40 is used for seismic performance assessment of the proposed model structure and the structure with conventional steel members. The analysis results show that at the performance point of each model the number and rotation of plastic hinge formed in the proposed modular system are smaller than those in the conventional system. Based on this observation it is concluded that the proposed system with composite sections has superior seismic capacity compared with conventional system.