• Title/Summary/Keyword: Mock-Up Test

Search Result 354, Processing Time 0.029 seconds

Development and Performance Evaluation of a Sloped Lightshelf Daylighting System (Mock-up model을 이용한 경사형광선반 채광시스템의 개발 및 채광성능평가에 관한 연구)

  • Kim, Jeong-Tai;Kim, Ki-Cheol;Kim, Gon
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.2
    • /
    • pp.39-50
    • /
    • 2004
  • One of the challenge for successful daylighting design might be to capture sunlighting that varies in both intensity and position and to deliver the luminous flux into the inner space as deep as possible. Conventional glazing apertures allow daylight in the outer 3.5m of a perimeter spaces. More advanced daylighting technologies can extend this daylighting depth by reflecting sunlight further from the windows within a deep floor area. For this purpose, this study developed light shelves based on performance evaluation with a mock-up model that constructed recently and measured under real sky condition. All these daylighting devices have a customized geometry developed from the solar path at a given latitude and utilize unique reflecting finishing to maximize the amount of redirection and diffusion of the daylight. This paper tells that the best daylighting penetration typically can be expected from using light-colored sloped external shelves.

A Study on lighting Energy Conservation in a Small Office Space with Daylight Dimming Control System (소규모 사무공간에서 디밍제어를 이용한 조명에너지 절약에 관한 연구)

  • 김한성;김강수
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.5
    • /
    • pp.15-21
    • /
    • 2003
  • This paper presents field measurements on daylighting and electric lighting with dimming controlled systems for a small office in Seoul, Korea. And the main purpose of this study is to provide the evaluation data of lighting energy performance when a dimming system is installed. For the performance evaluation, the mock-up room(3.6x7.2x2.6[m]) was used for the actual test. The results of this study were as follows; 1) The correlation between daylight illuminance at a workplane(Ed) and the photosensor signal(Sd) was an important factor affecting the performance of daylight responsive dimming system, 2) The mock-up office space gained a sufficient workplace illuminance of 579[lux] with the dimming control system 3) About 53[%J of monthly lighting energy could be saved using the dimming control system.

Analysis on Shrinkage Properties of High Performance Concrete According to Mock-Up Test (고성능 콘크리트의 Mock-Up 시험에 의한 수축특성 분석)

  • Koh Kyoung Taek;Jin Hu Lin;Ryu Gum Sung;Hwang Yin Seong;Kim Do Gyum;Han Cheon Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.545-548
    • /
    • 2004
  • This paper is to investigate the shrinkage properties of high performance concrete (HPC) with mixture adjustment by using mock-up specimens. HPC with mixture adjustment needed a higher dosage of SP agent due to fluidity reduction and a larger dosage of AE agent due to the reduction of air content. Setting time of HPC with mixture adjustment exhibited earlier than that of control HPC by as much as 6 hours. HPC with mixture adjustment gained more than 70MPa of compressive strength. Autogenous shrinkage of Control HPC was found to be $-340\times40^{-6}$ at 49days when the expansion value by thermal effect was excluded and HPC with mixture adjustment $-175\times10^{-6}$, which was the half of the value of control HPC. Drying shrinkage of center section of HPC with mixture adjustment showed similar tendency with autogenous shrinkage because of no internal moisture movement, while surface section had larger drying shrinkage. The specimen embedded with reinforcing bar had smaller deformation caused by confinement of reinforcing bar.

  • PDF

Development of PC Double Wall for Staircase Construction (계단실 공사를 위한 PC Double Wall 공법 개발)

  • Suh, Jung-Il;Park, Hong-Gun;Hwang, Hyeon-Jong;Im, Ju-Hyuk;Kim, Yong-Nam
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.571-581
    • /
    • 2014
  • In the present study, hollow precast concrete wall (PC Double Wall) for staircase construction was developed. Comparing the conventional walls, the PC Double Wall can be reduced the lift weight using hollow core and improves the integrity between the PC members. The cross-section and re-bar details of the PC Double Wall were developed considering precast concrete manufacturing, constructability, and the structural safety. Particularly, a form system was developed to manufacture thin and hollow core PC wall efficiently. A mock-up test for a staircase using the PC Double wall was performed to verify the constructability and integrity of the PC walls. The test result verified that joint deformation and cracking did not occur as showing good constructability.

Construction Method and Durability Evaluation of Mock-up Test for Bobsleigh Track (실물크기형 봅슬레이 트랙 Mock-up Test 시공방법 및 내구성 평가)

  • Lee, Kyeo-Re;Han, Seung-Yeon;Nam-Gung, Kyeong;Yun, Kyong-Ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.315-323
    • /
    • 2016
  • This study examined the durability and method for making a mockup of bobsled tracks for constructing a bobsled stadium, which is a sport in the Winter Olympics. As bobsleigh games are very fast and dangerous, a safety design for players and a precise construction using highly efficient shotcrete is necessary. Moreover, a general molding construction is difficult because bobsleigh tracks are composed of various curves and slopes, and it is necessary to construct them using high-strength and high durability materials. The developed method for making a mockup and performing durability evaluation of bobsleigh tracks through this research will be applied in the construction of the 2018 Pyeongchang Winter Olympics Sliding centre and bobsleigh tracks using domestic techniques.

Research on the Mock-up for CFT Using 100MPa High Strength Concrete and 800MPa High Strength Steel (800MPa 고강도 강재 및 100MPa 초고강도 콘크리트를 활용한 CFT 합성 구조 시스템 개발을 위한 현장 성능평가에 관한 연구)

  • Kim, Woo-Jae;Lee, Youg-Do;Park, Hee-Gon;Lee, Jae-Sam;Jung, Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.35-37
    • /
    • 2011
  • This study was a comparison result between the laboratory and mock up test to apply the ultra high strength concrete to CFT(Concrete Filled Tube) structure. The investigated result of tendency and quality similarity of each specimen, was set up a management range according to checking the validity and suitability analysis. Also, It wil be utilized to data as construction guidelines of CFT.

  • PDF

Evaluation on In-Site Compressive Strength of High-Strength Concrete Mass Elements under Cold Weather (혹한기 고강도 콘크리트 매스부재의 현장 압축강도 평가)

  • Mun, Jae-Sung;Yang, Keun-Hyeok;Kim, Do-Gyeu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.589-595
    • /
    • 2015
  • This study evaluated the in-site compressive strength development of high-strength concrete developed for the mass structures under cold weather condition. Two mock-up wall specimens with $2.0{\times}1.2{\times}1.0m$ in dimension were cured under an average temperature of $5^{\circ}C$. Core strengths measured at different locations of the mock-up walls were compared with the companion standard cylinder strengths. Test results revealed that the core strength of mock-up walls at an age of 3 days is higher by approximately 30% than the companion cylinder strength because of the high curing temperature effect generated from the heat of hydration of cementitious materials. Furthermore, comparisons with the prediction models based on maturity function confirmed that the effect of hydration heat on the curing temperature increase needs to be reflected to reasonably evaluate the on-site compressive strength development of concrete for mass elements.

Evaluation of Shrinkage Properties Based on Mock-Up Testin High Performance Concrete (Mock-Up 시험에 의한 고성능 콘크리트의 수축특성 분석)

  • Han, Cheon-Goo;Kang, Su-Tae;Koh, Kyung-Taek;Hann, Chang-Pyung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.5
    • /
    • pp.106-114
    • /
    • 2006
  • This paper investigates the fundamental properties and shrinkage characteristics of low shrinkage high performance concrete(LSHPC), using mock-up specimens. According to the test results, the most suitable mix proportions of LSHPC need a higher dosage of SP agent and AE agent, in order to obtain the target of slump flow and air content. This is due to reduce fluidity and air content respectively. It also presented earlier setting time than control concrete by 6 hours and exhibited compressive strength of 60MPa at age 28 days. Autogenous shrinkage of LSHPC was the half of the value of control concrete. Drying shrinkage of center section of LSHPC showed similar tendency with autogenous shrinkage, because of no internal moisture movement, while surface section had larger drying shrinkage. The specimen with embedded reinforcing bar had smaller deformation owing to confinement of reinforcing bar.

Evaluation of Field Applicability of Shotcrete for Fiber-net Integrated Tunnel Support System through Mock-up Test (목업 테스트를 통한 숏크리트용 섬유 그물망 일체형 터널 지보시스템의 현장 적용성 평가)

  • Kim, Jiyoung;Choi, Seongcheol
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.1
    • /
    • pp.72-78
    • /
    • 2020
  • The present study developed shotcrete for fiber-net integrated tunnel support system, which consists of fiber-net support materials including netlike fiber and shotcrete and integration technology between support materials. In addition, in order to evaluate the field applicability of the developed tunnel support system and compare with the performance of steel fiber reinforced shotcrete, mock -up test was conducted on the mock -up structure. The test results show that in the case of shotcrete containing coarse aggregate(S20A5RP10-C), the excessive rebound rate occurred as the secondary shotcrete was dropped during construction due to the degradation in bond performance with fiber-net. Also, in the case of steel fiber reinforced shotcrete, the amount of cast shotcrete fell short of target value due to the fiber ball and the degradation of pumpability. On the other hand, the amount of cast mortar shotcrete(S20A5RP10-M) and the installation position of fiber-net were almost close to the target values, and the lower rebound rate occurred compared to the steel fiber reinforced shotcrete.

Mock-up Test of Improving Super Retarding Concrete to Control of Hydration Heat Crack of Foundation Mat Mass Concrete (기초매트 매스콘크리트의 수화열 균열제어로서 초지연콘크리트 활용에 관한 Mock-up 실험)

  • Lee, Jae-Sam;Bae, Yeoun-Ki;Noh, Sang-Kyun;Kim, Suk-Il;Chung, Sung-Jin;Han, Cheon-Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.777-780
    • /
    • 2008
  • According to the recent tendency that the buildings in the downtown are gradually Manhattanized, the very thick massive concrete is selected as the foundation of architectures. By the way, because this mass concrete cannot be simultaneously pour in a great quantity due to the circumstance at the field, not only the questions on the unification between the concretes pour on the upper layer and the lower layer are presented but also the cracks by the internal force from the difference of hydration exothermic period are occurred, which are pointed out as the problems. Thus, this study performed Mock-up test to apply the hydration heat controlling method of massive concrete for horizontal partition pouring construction to the building sites for the purpose of securing the stability on the cracks by the internal force from the difference of hydration exothermic period on the upper layer and the lower layer of massive concrete and checked the efficiency. As the results of test, in case of setting time difference method by super retarder with 2 layers and 4 layers, the effect that temperature gaps between upper part and lower part were lowered and the possibility of crack occurrence was decreased as the peak time of the heat of hydration became delayed to the latter term could be confirmed.

  • PDF