• 제목/요약/키워드: Method of repair

검색결과 1,630건 처리시간 0.04초

Performance Evaluation of the Underwater Structure which used a Epoxy Panel (에폭시 섬유판넬을 이용한 수중구조물의 단면보수시스템에 대한 성능평가)

  • 박준명;홍성남;박선규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 한국콘크리트학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.343-346
    • /
    • 2003
  • Confirmation of a damage degree and repair about a damage part are very hard for an underwater structure. And quality control of a construction is very complicated even if repair work is carried out on a damaged structure because repair work is carried out in water. If repair work is carried out while a defect part of the structure which there is in water keeps dry state, a efficient of repair is maximized. However, as for the repair technology about an underwater structure, a systematic researcher is not enough because of the environmental trouble. And, as for the effect about repair method to be applied to a currently underwater structure, it is not certainly proved. In this study The repair work of an underwater structure damaged applied the method that used a fiber panel form work. And a efficient of structure repaired was evaluated.

  • PDF

Evaluation of Injection Property on the Crack Repair Method by installing the packer with Right Angle Drill Type in RC Structure (직각천공방식으로 패커를 설치한 콘크리트 균열보수공법의 보수재 주입특성에 관한 연구)

  • Ko Jin-Soo;Lee Sung-Bok;Seo Che-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • 제6권2호
    • /
    • pp.91-98
    • /
    • 2006
  • The purpose of this study is to investigate the problem of crack repair materials and methods in existing concrete structure and to propose the effective injection method on crack repair by packer type. The result of this study is as follows. It is investigated that the crack width in the inner matrix of concrete structure is decreased about 30-40% than that in the sulfate of the concrete structure. Also it is showed that the possibility which could be monolithic with injection part became higher if the injection part if installed near to surface of concrete on the punching method to vertical direction against crack area. The injection of repair material can be poured smoothly under about $10N/mm^2$ pressure on the condition that cracks are monolithic with injection part without dust by drill. The effective method to pour the injection repair material is the punching method by coredrill but several research to minimize injection pressure should be continually.

Evaluation of Injection Property on the Crack Repair Method by Installing the Packer with Right Angle Drill Type in RC Structure

  • Ko, Jinsoo;Lee, Sungbok;Kim, Byungyun;Seo, Cheho
    • Architectural research
    • /
    • 제11권2호
    • /
    • pp.27-34
    • /
    • 2009
  • The purpose of this study is to investigate the problem of crack repair materials and methods in existing concrete structure and to propose the effective injection method on crack repair by packer type. The result of this study is as follows. It is investigated that the crack width in the inner matrix of concrete structure is decreased about 30-40% than that in the surface of the concrete structure. Also it is showed that the possibility which could be monolithic with injection part became higher if the injection part is installed near to surface of concrete on the punching method to vertical direction against crack area. The injection of repair material can be poured smoothly under about $10N/mm^2$ pressure on the condition that cracks are monolithic with injection part without dust by drill. The method which is effective injection for a repair material is the punching method in compliance with coredrill. But, the research continuously is necessary about minimum injection pressure.

Experimental study on the Development of Thin-layer Pavement Method using Hybrid Epoxy for Concrete Bridge Deck Crack Repair (콘크리트 교면포장 균열 보수를 위한 하이브리드 에폭시 박층포장 보수공법 개발에 관한 실험적)

  • Kim, Han-Sol;Jang, Jong-Min;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.79-80
    • /
    • 2022
  • A method for repairing cracks using low-viscosity resins has been proposed as a construction method that can quickly repair roads from deterioration. However, when the viscosity of the epoxy resin is high, there is a limit in that it is difficult for the material to penetrate into microcracks and cracks in the concrete top plate. In this study, an epoxy thin-layer pavement repair method was developed using low-viscosity PMMA (Poly methyl methacrylate) to repair microcracks on the pavement surface and pavement layer and reinforce the pavement surface. Materials necessary for the thin-layer packaging method were developed, and performance was evaluated to meet the epoxy binder quality standards. As a result, all materials met the required performance.

  • PDF

A Study on the Evaluation for Durability Performance of the Repair Method Using Fiber Reinforced Mortar (섬유 보강 모르타르를 사용한 보수공법의 내구성능 평가에 관한 연구)

  • Ryu, Gum-Sung;Koh, Kyung-Taeg;Kim, Bang-Wook;Yoon, Pil-Yong;Kim, Jin-Su
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 한국콘크리트학회 2006년도 춘계 학술발표회 논문집(II)
    • /
    • pp.309-312
    • /
    • 2006
  • In this study, the repair method using PVA fiber reinforced mortar evaluated on durability performance. Test items are compressive strength, flexural strength, carbonation, freezing-thawing. As for the test results, it was found that durability performance of the repair method using PVA fiber mortar showed more better than the existing repair method. Therefore, appling on the repair method using PVA fiber mortar, the repaired concrete structures can be increased to service life.

  • PDF

Determining Major Items of Scheduled Maintenance for Apartment through Case Data: Focused on Improving the Establishment Standard for Long-term Repair Program (사례 데이터 분석을 통한 공동주택 계획수선 주요 항목 도출: 법령 상의 장기수선계획 수립기준 현실화를 중심으로)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • Land and Housing Review
    • /
    • 제7권1호
    • /
    • pp.43-51
    • /
    • 2016
  • The long-term repair program is significant as the execution standard for apartment in repair construction, and provides the basis for effective facility management through appropriation reserve and preventive maintenance. Considering its importance, the government legislates the items, cycle, and ratio for long-term repair. However, the frequent changes, controversies on repair, and difficulties in using appropriation reserve are caused as the items have not been revised on time reflecting up-to-date construction technologies. In order to resolve these problems, it is required to improve the standard by evaluating the appropriateness of repair items throughout the analysis of actual conditions. This study aims to suggest the revision plan for the criteria with the major items based on the status identified by the actual long-term repair programs and historical repair construction data. To do this, the adoption ratios of items to program are reviewed by collecting the real cases of the long-term repair programs. Developing improvement plan was approached in two ways such as "exclusion method" deleting minimum unnecessary items and "selection method" sorting out items with high adoption ratio and evidence of repair in a positive manner. Aa a result, the major items were identified as 118 items and 73 items by exclusion method and selection method respectively from the current 147 items. The outcomes of this study are expected to contribute enhancing the practicality of the standard in that the regulation for long-term repair program should periodically reflect the status of currently applied construction methods and materials.

New optimization method of patch shape to improve the effectiveness of cracked plates repair

  • Bouchiba, Mohamed S.;Serier, Boualem
    • Structural Engineering and Mechanics
    • /
    • 제58권2호
    • /
    • pp.301-326
    • /
    • 2016
  • An optimization method of patch shape was developed in this study, in order to improve repair of cracked plates. It aimed to minimize three objectives: stress intensity factor, patch volume and shear stresses in the adhesive film. The choice of these objectives ensures improving crack repair, gaining mass and enhancing the adhesion durability between the fractured plate and the composite patch. This was a multi-objective optimization combined with Finite elements calculations to find out the best distribution of patch height with respect to its width. The implementation of the method identified families of optimal shapes with specific geometric features around the crack tip and at the horizontal end of the patch. Considerable mass gain was achieved while improving the repair efficiency and keeping the adhesive shear stress at low levels.

Antifuse Circuits and Their Applicatoins to Post-Package of DRAMs

  • Wee, Jae-Kyung;Kook, Jeong-Hoon;Kim, Se-Jun;Hong, Sang-Hoon;Ahn, Jin-Hong
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제1권4호
    • /
    • pp.216-231
    • /
    • 2001
  • Several methods for improving device yields and characteristics have been studied by IC manufacturers, as the options for programming components become diversified through the introduction of novel processes. Especially, the sequential repair steps on wafer level and package level are essentially required in DRAMs to improve the yield. Several repair methods for DRAMs are reviewed in this paper. They include the optical methods (laser-fuse, laser-antifuse) and the electrical methods (electrical-fuse, ONO-antifuse). Theses methods can also be categorized into the wafer-level(on wafer) and the package-level(post-package) repair methods. Although the wafer-level laser-fuse repair method is the most widely used up to now, the package-level antifuse repair method is becoming an essential auxiliary technique for its advantage in terms of cost and design efficiency. The advantages of the package-level antifuse method are discussed in this paper with the measured data of manufactured devices. With devices based on several processes, it was verified that the antifuse repair method can improve the net yield by more than 2%~3%. Finally, as an illustration of the usefulness of the package-level antifuse repair method, the repair method was applied to the replica delay circuit of DLL to get the decrease of clock skew from 55ps to 9ps.

  • PDF

Comparative Cost Analysis of Repair Method according to Bridge Superstructure Type (교량 상부구조 형식에 따른 보수공법 비용 비교분석)

  • Lee, Changjun;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2023
  • The need for maintenance of bridge infrastructure is increasing due to aging, and the cost of maintaining the infrastructure must be calculated for effective budget distribution. Therefore, in this study, representative defects according to bridge superstructure type are derived to calculate the cost for each repair method. First of all, the representative bridges, PSCI girder bridge, Rahmen bridge, Steel box girder bridge, and RC slab bridge, were selected as superstructures using BMS data, and repair methods for defects were presented. In addition, the cost of the repair method by superstructure type was compared. This result is expected to predict total maintenance costs in consideration of the maintenance cycle.

  • PDF

Effect analysis by time passage after Repair & Reinforcement of Fill Dams (필댐 보수보강후 시간경과에 따른 효과 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Im, En-sang;Hong, Won-Pho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF