• Title/Summary/Keyword: Mega-projects

Search Result 64, Processing Time 0.023 seconds

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

The Selection Criteria of Delivery Method based on Project Characteristics;focused on the Multi-Housing Projects (프로젝트 특성에 따른 발주방식 선정기준;공동주택 건설 사업을 중심으로)

  • Moon, Hyun-Seok;Cho, Kyu-Man;Hyun, Chang-Teak;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.390-395
    • /
    • 2006
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.

  • PDF

Development of Program Management Information Systems for Urban Renewal (도심 재생 종합 사업관리 시스템의 개념 및 개발)

  • Choi, Hye-Mi;Kim, Ju-Hyung;Lee, Sung-Bok
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2010
  • Due to the variety of processes that are mainly influenced by the modification of law and regulations, it is difficult to propose a formal procedure of urban renewal projects. In addition, conflicts among various participants and stake-holders have made urban renewal difficult to manage. Needs for new systems to support management of this type of projects have been raised. This system should enable users to manage program aspects as well as projects given that the urban renewal consists of several projects. According to analysis of current context, the requirements of the system are classified as follows: a method to create flexible systems to cope with various process; functions to provide data on cost and schedule; user-friendly visualized tools enhancing understand of non-experts or less-experienced participants. This paper summarizes the background, requirements, concept and model of the system. Currently, prototype systems have been developed. Regarding outputs presented so far, potential benefits of the system are presented as well.

A Study on the Geometrical Space Composition, Dynamic Visual Perception and Questions of Existence found in the Works of James Turrell - Focusing on 'Wedgework', 'Space Division', 'Skyspace' Projects - (제임스 터렐의 작품에 나타난 기하학적 공간구성, 시지각적 역동성 그리고 존재론적 의미에 관한 연구 - '웨지워크', '스페이스 디비전', '스카이스페이스' 프로젝트를 중심으로 -)

  • Kim, Jong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.145-152
    • /
    • 2012
  • Since 1966 when James Turrell completed his studies on Art, he has been working on the consistent theme of Art. For the 46 years of time, site contexts, scales, methods of light have been changed and they made Turrell's unique 'project series'. Each series has different spatial, visual-perceptual forms and characteristics from other series. The differences were caused by the given situations, but also Turrell intentionally pursued it. However, there are essential theme of art that has not changed in most of Turrell's projects. Target of this paper is to study the unchanged theme as well as the differences. The study starts with three questions: first, what is the geometrical space composition?, second, what is the visual-perceptual phenomenon?, third, what is the hidden consistent theme? This research focuses on three case projects: Wedgework, Space Division Constructions, Skyspaces. These project series are in between the early small object-like installations and the late mega-scale outdoor projects. The study found that geometrical space composition has important role to give visual-perceptual dynamism to the viewer. The phenomenological perception is connected to the questions of relationship between human and space, ultimately human and the world. Although the Merleau-Ponty's philosophy has been related to the work of Turrell in various previous studies, Cartesian 3-dimensional geometry has also crucial role to experiment a viewer's perceptual boundaries. Image of infinity is another aspect of three cases, especially Space Division Constructions and Skyspaces. Through these structure, Turrell's work lead to an ultimate question of meaning for human existence in infinite space. It is hoped that this paper is helpful for Architecture and Interior design field in which light and space are essential.

  • PDF

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF

Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project -Focused on the Establishment of Preparation Committee and Association Committee- (도시 및 주거환경정비사업의 업무분석을 통한 문제점과 개선 사항 -조합설립추진위원회와 조합설립 업무를 중심으로-)

  • Ryu, Han-Guk;Son, Bo-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.39-47
    • /
    • 2010
  • The government has routinely made efforts to improve the living environment and infrastructure of less-developed areas through large area urban remodeling projects, which are in themselves attempts to overcome the disadvantages of piecemeal local area development. Such projects are very complex, and various stakeholders are involved. However, the data on such projects has not been well managed, and has not lent itself to being easily adopted to similar projects. In addition, there are numerous fragmented mega-projects that seem to be performed based on "rules of thumb" To address this issue, the work process of many urban and residence project types should be standardized otherwise the participants will be confused to work properly. In particular, typical residents who lack knowledge about building redevelopment, building remodeling, urban environment improvement projects, and the like think that it is difficult to establish the preparation committees and association committees for the projects. Therefore, we examined previous researches related to the urban and building renovation to solve the prescribed present problems. This paper presents the three necessary research performances: first, we analyzed the administrative work process in the related laws; second, we examined the practical work process of the preparation committee and association committee stages; and finally we deduced the problem and presented the required improvements.

Port Competition and Co-operation as a Strategy of Busan Port

  • Yoon, Mi-Sun;Nam, Ki-Chan
    • Journal of Navigation and Port Research
    • /
    • v.30 no.9
    • /
    • pp.749-754
    • /
    • 2006
  • The maritime logistics environment including seaborne trade, shipping and ports is changing rapidly and continuously. Large containerships, mega carriers and global terminal operators try to achieve economies of scale and economies of scope. As a result of the changing environment, the competition between ports to achieve competitiveness is intensive. Port competition among China, Japan and Korea is becoming fiercer, both directly and indirectly, resulting from the increased trade in northeast Asia. Port development projects within each country stimulate more intensive port competition. As a result, overcapacity, fierce price competition and overlapping hinterland problems will be caused in the future. Co-operation for survival is considered as a strategy in order to solve anticipated problems caused by port competition Busan port, for instance, could co-operate with China and Japan as well as with other ports in Korea Terminal operators' expansion through investments including joint-ventures will make connections between ports smoother. At the port authority level, continuous cooperative interchange between countries is indispensable.

The Development of the East Asian Observatory

  • Ho, Paul
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.2
    • /
    • pp.27.3-27.3
    • /
    • 2015
  • The East Asian Observatory (EAO) was established in 2014 by the East Asian Core Observatories Association (EACOA). The goal of the EAO is to build and operate world-class facilities on behalf of the East Asian regions, as a counterpart to the European Southern Observatory (ESO). Leading astronomical facilities such as ALMA, TMT, GMT, and SKA are mega projects which require enormous economic resources. It is difficult for any observatory or any country to fund such facilities on its own. EAO intends to combine the resources and manpower in our East Asian regions, in order to play a leading role in the next generation frontier instruments. The EACOA institutes: NAOC, NAOJ, KASI, and ASIAA, have authorized the EAO to take on the operations of the James Clerk Maxwell Telescope (JCMT) on Mauna Kea as their first joint venture. In this talk, we will report on the development of EAO, our current operations of JCMT, and our future aspirations.

  • PDF

Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project (철도건설사업의 효율적인 VE수행을 위한 성능측정기법)

  • Lim, Jong-Kwon;Park, Mi-Yun;Park, Heung-Min;Kim, Sung-Hun;Lee, Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF