• Title/Summary/Keyword: Mega Project

Search Result 101, Processing Time 0.022 seconds

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

Current Status and Future Directions of Management of Hazardous Air Pollutants in Korea - Focusing on Ambient Air Monitoring Issues - (우리나라 유해대기오염물질의 관리현황과 개선방향 - 환경대기 모니터링 문제를 중심으로 -)

  • Baek, Sung-Ok;Jeon, Chan-Gon
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.29 no.5
    • /
    • pp.513-527
    • /
    • 2013
  • Recently, hazardous air pollutants (HAPs) have been of great concern in Korea, largely due to public awareness on the importance of their impacts on environmental health. A group of HAPs includes a large number of various chemicals such as VOCs, PAHs, PCBs, dioxines, furans, organochlorinated pesticides, and some heavy metals. These groups of pollutants are generally known to have genetic toxicity and to be persistent in the environment. In addition, most of chemicals belong to the category of HAPs are widely distributed not only in air, but also in water and soil environments, and has therefore undergone considerable scrutiny for the last three decades. In this article, environmental implications and management of HAPs in Korea will be reviewed, with a particular emphasis on the monitoring of HAPs in the ambient air. A number of field studies will be introduced, which were recently conducted in large urban and industrial areas. Based on the filed studies, eight pollutants have been suggested to be intensively managed as higher priority pollutants, which are benzene, 1,3-butadiene, formaldehyde, acrolein, trichloroethylene, benzo(a)pyrene, hexa-valent Cr, and $PM_{2.5}$. Finally, future directions for a mega scale project for comprehensive monitoring of ambient atmosphere in large urban areas will be suggested. Such an innovative project is believed to provide more realistic information on the nature of the population exposure, which can not be simply identified by emission inventories or source investigations. Therefore, any strategy for the management of HAPs should be developed by not only emission-based approaches, but also observation-based approaches.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Development of Program Management Information Systems for Urban Renewal (도심 재생 종합 사업관리 시스템의 개념 및 개발)

  • Choi, Hye-Mi;Kim, Ju-Hyung;Lee, Sung-Bok
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2010
  • Due to the variety of processes that are mainly influenced by the modification of law and regulations, it is difficult to propose a formal procedure of urban renewal projects. In addition, conflicts among various participants and stake-holders have made urban renewal difficult to manage. Needs for new systems to support management of this type of projects have been raised. This system should enable users to manage program aspects as well as projects given that the urban renewal consists of several projects. According to analysis of current context, the requirements of the system are classified as follows: a method to create flexible systems to cope with various process; functions to provide data on cost and schedule; user-friendly visualized tools enhancing understand of non-experts or less-experienced participants. This paper summarizes the background, requirements, concept and model of the system. Currently, prototype systems have been developed. Regarding outputs presented so far, potential benefits of the system are presented as well.

A Study on the Geometrical Space Composition, Dynamic Visual Perception and Questions of Existence found in the Works of James Turrell - Focusing on 'Wedgework', 'Space Division', 'Skyspace' Projects - (제임스 터렐의 작품에 나타난 기하학적 공간구성, 시지각적 역동성 그리고 존재론적 의미에 관한 연구 - '웨지워크', '스페이스 디비전', '스카이스페이스' 프로젝트를 중심으로 -)

  • Kim, Jong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.145-152
    • /
    • 2012
  • Since 1966 when James Turrell completed his studies on Art, he has been working on the consistent theme of Art. For the 46 years of time, site contexts, scales, methods of light have been changed and they made Turrell's unique 'project series'. Each series has different spatial, visual-perceptual forms and characteristics from other series. The differences were caused by the given situations, but also Turrell intentionally pursued it. However, there are essential theme of art that has not changed in most of Turrell's projects. Target of this paper is to study the unchanged theme as well as the differences. The study starts with three questions: first, what is the geometrical space composition?, second, what is the visual-perceptual phenomenon?, third, what is the hidden consistent theme? This research focuses on three case projects: Wedgework, Space Division Constructions, Skyspaces. These project series are in between the early small object-like installations and the late mega-scale outdoor projects. The study found that geometrical space composition has important role to give visual-perceptual dynamism to the viewer. The phenomenological perception is connected to the questions of relationship between human and space, ultimately human and the world. Although the Merleau-Ponty's philosophy has been related to the work of Turrell in various previous studies, Cartesian 3-dimensional geometry has also crucial role to experiment a viewer's perceptual boundaries. Image of infinity is another aspect of three cases, especially Space Division Constructions and Skyspaces. Through these structure, Turrell's work lead to an ultimate question of meaning for human existence in infinite space. It is hoped that this paper is helpful for Architecture and Interior design field in which light and space are essential.

  • PDF

Causal Relationship Between Indian Ports' Originated Container Traffic and Total Transshipments of Port of Colombo: A Granger Causality Analysis

  • Bandara, Sooriya;Ryoo, Dong-Keun;Ahn, Ki-Myung
    • Journal of Navigation and Port Research
    • /
    • v.42 no.5
    • /
    • pp.357-364
    • /
    • 2018
  • Colombo noticeably became the most economical gateway to the Indian subcontinent, in terms of cost as well as time. The Colombo Port Expansion Project (CPEP) started commencement with the purpose of accommodating mega ships, under the long-term strategies of making Colombo the hub of South Asia. In this context, the purpose of this study is to investigate the causal relationship between Indian ports' originated container traffic, and total transshipments of the port of Colombo, and also to identify the nature of the causality between the two variables, evaluating Granger causality test results. It finds unidirectional causality from total transshipments of Colombo to Indian ports' originated transshipments in the port of Colombo. It suggested that ongoing port expansion projects, opening up for new markets and attracting new shipping lines in the port of Colombo, have generated significant impact on Indian ports' container traffic, via the port of Colombo. Findings would be valuable for future forecasting of container traffic in Colombo port and the policy-making process in the port as well.

A Study on the Improvement Direction of RFID Using Satisfaction-Importance Matrix in Construction Fields (만족도-중요도 매트릭스를 이용한 건설현장에서의 RFID 개선 방향에 관한 연구)

  • Jang, Se-Woong;Yu, Hoe-Chan;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.47-54
    • /
    • 2009
  • Integrated construction site management using RFID(Radio Frequency Identification) and facility maintenance introducing USN (Ubiquitous Sensor Network) have been widely used in the mega construction project sites. But, the validation on performance of RFID systems after introducing those has not been carried out. Given that the use of RFID systems have been increased, the construction industry as well as other industries needs the evaluation of the RFID system. By regarding the necessities for evaluation, a research to the satisfaction and importance evaluation of RFID system from the end-users' view point for site management was conducted. Satisfaction-importance matrix of satisfaction standards and importance standards was created (organised) according to the analysis result of a survey, proposed improvement methods and analysis about the items presented by each region like areas of sustainable maintenance, maintenance, progressive improvement and priority improvement. The result would contribute to enhance the utilization of system and its performance.

Mega Project Technique Support : A Case Study of Urban Development and Urban Expand

  • Pricharchon, Ekkarat;Polngam, Supapis
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1000-1001
    • /
    • 2003
  • Like other major cities in the world, Bangkok and some other cities in Thailand are expanding rapidly. The Office of Transports and Traffic Policy and Planning had selected three cities for a study of urban change; namely, Bangkok Metropolis and vicinity ( including Nontha buri, Samut Prakan , Prathum Thani, Samut Sakhon and Nakhon Pathom), Chiang Mai and Nakhon Nayok. The main objective of the study is to monitor urban development and urban extension as well as the change of landuse from farm land to urban area during two periods by using available satellite data. LANDSAT-5 TM and SPOT-HRV panchromatic were used for the first period and LANDSAT-7 ETM+ and IRS-lD panchromatic were used for the second period with a lapsed time of 14 years. I was found that during this period Bangkok Metropolis and vicinity extended 1,222 square kilometer; Chiang Mai 68.3 square kilometer, Nakhon Nayok 5.97 square kilometer. Most landuse categories which had been changed to urban were rice paddy and mixed orchard. Some suggestion for sound urban development based on satellite data was also included.

  • PDF

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF