• Title/Summary/Keyword: Maximum Connected Area

Search Result 80, Processing Time 0.025 seconds

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Finite Element Analysis on the Displacement Behavior Safety of Hollow Shafts with Equivalent Volume (동등체적을 갖는 중공축의 변위거동 안전성에 관한 유한요소해석)

  • Kim, Chung Kyun
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.3
    • /
    • pp.73-77
    • /
    • 2016
  • This paper presents the displacement behavior safety of hollow shafts with an equivalent volume for various cross sectional area using a finite element method. The FEM results indicate that the hollow shafts with X-type or Y-type columns between outer tube, middle tube and inner tube may reduce a maximum displacement at the middle length of hollow shafts. Especially, the load-bearing column of X-type or Y-type hollow shaft is directly connected between outer tube and inner tube without a shift for reducing the vertical displacement. And increased thickness of a load-bearing column is recommended for reducing the vertical displacement and increasing the displacement behavior safety for an equivalent volume of a hollow shaft.

Safety Evaluation of 40m Combined Modular Bridge Super-Structures Based on Transportation Lifting Methods (40m 조합모듈교량 상부구조 이송에 따른 안전성 검토)

  • Park, Sung-Min;Jung, Woo-Young
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.2
    • /
    • pp.77-84
    • /
    • 2015
  • The purpose of this study was the analytical safety evaluation on the super-structure of precast modular bridge using standardized modular members and robotic construction during the transportation routing and lifting conditions. In order to evaluate the safety performance of the bridge system, 3-D full scale Finite Element (FE) of 40 m standardized modular block was developed in ABAQUS, followed by the analytical study to classify the structural system according to steel girder structures: 1) modular bridge block lifting method including the steel girder system; 2) modular bridge block lifting method without the steel girder system. The results from the analytical study revealed that the maximum stress of each modular member was within the maximum allowable stresses during lifting condition. However, the stress concentration at the connected area was more critical in comparison to the behavior of 40 m combined modular blocks during lifting time

Operation Analysis of a Communication-Based DC Micro-Grid Using a Hardware Simulator

  • Lee, Ji-Heon;Kim, Hyun-Jun;Han, Byung-Moon
    • Journal of Power Electronics
    • /
    • v.13 no.2
    • /
    • pp.313-321
    • /
    • 2013
  • This paper describes the operation analysis results of a communication-based DC micro-grid using a hardware simulator developed in the lab. The developed hardware simulator is composed of distributed generation devices such as wind power, photovoltaic power and fuel cells, and energy storage devices such as super-capacitors and batteries. Whole system monitoring and control was implemented using a personal computer. The power management scheme was implemented in a main controller based on a TMS320F28335 chip. The main controller is connected with the local controller in each of the distributed generator and energy storage devices through the communication link based on a CAN or an IEC61850. The operation analysis results using the developed hardware simulator confirm the ability of the DC micro-grid to supply the electric power to end users.

Welcome the Challenges and Imaging the Sky Town

  • Cheng, Jiang Huan
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.271-277
    • /
    • 2017
  • Safety, livability, and efficiency are the three prominent problems of tall buildings, which are also the severe challenges to designers. We proposed the idea of building the sky town to solve these problems, which can be summarized in two sentences, one is tall building multi-storised, and another one is vertical facilities municipal-infrastructurised. The tall building can be horizontally cut into several multi-storey buildings by some large platforms. The platform extends a certain width to block the fire from spreading. Tall buildings are connected together as a group. One of them is a traffic core, which is used for vertical transportation and MEP. It connects to traffic center such as metro, while most of the other tall buildings' cores can be very much released, so as to achieve maximum efficiency of floor usable area and to give good traffic organization. By combining traffic core, platforms, and multi-storey buildings' inner traffic, a transportation network is formed. Finally, we refer to the design of Raffles City Chongqing to make a sketch of sky town.

A Variable Window Method for Three-Dimensional Structure Reconstruction in Stereo Vision (삼차원 구조 복원을 위한 스테레오 비전의 가변윈도우법)

  • 김경범
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.7
    • /
    • pp.138-146
    • /
    • 2003
  • A critical issue in area-based stereo matching lies in selecting a fixed rectangular window size. Previous stereo methods doesn't deal effectively with occluding boundary due to inevitable window-based problems, and so give inaccurate and noisy matching results in areas with steep disparity variations. In this paper, a variable window approach is presented to estimate accurate, detailed and smooth disparities for three-dimensional structure reconstruction. It makes the smoothing of depth discontinuity reduced by evaluating corresponding correlation values and intensity gradient-based similarity in the three-dimensional disparity space. In addition, it investigates maximum connected match candidate points and then devise the novel arbitrarily shaped variable window representative of a same disparity to treat with disparity variations of various structure shapes. We demonstrate the performance of the proposed variable window method with synthetic images, and show how our results improve on those of closely related techniques for accuracy, robustness, matching density and computing speed.

Traffic Test Method for Networked Control System (네트워크 기반 제어시스템의 통신부하 시험방법)

  • Yu, Kwang-Myung;Kim, Jong-An;Ryu, Ho-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.5
    • /
    • pp.688-695
    • /
    • 2013
  • Networked Control Systems(NCS) contain the structure which controllers, actuators and sensors are connected to communication network. And they have been adopted in large and complicated plant area due to the advantages of mitigating computational bottleneck and maintenance. Although this structure provides many benefits, it brings in problems of unpredictable communication delay, data loss and corruption. This phenomena have to be considered in designing NCSs since it affects on overall control system stability. This paper introduces network traffic test method for ethernet based NCSs to find out maximum network usage which guarantee stable control operation. Test results shows this methods can be adopted in various types of NCSs and contributes economical system design and effective system operation.

Traffic Light Recognition Using a Deep Convolutional Neural Network (심층 합성곱 신경망을 이용한 교통신호등 인식)

  • Kim, Min-Ki
    • Journal of Korea Multimedia Society
    • /
    • v.21 no.11
    • /
    • pp.1244-1253
    • /
    • 2018
  • The color of traffic light is sensitive to various illumination conditions. Especially it loses the hue information when oversaturation happens on the lighting area. This paper proposes a traffic light recognition method robust to these illumination variations. The method consists of two steps of traffic light detection and recognition. It just uses the intensity and saturation in the first step of traffic light detection. It delays the use of hue information until it reaches to the second step of recognizing the signal of traffic light. We utilized a deep learning technique in the second step. We designed a deep convolutional neural network(DCNN) which is composed of three convolutional networks and two fully connected networks. 12 video clips were used to evaluate the performance of the proposed method. Experimental results show the performance of traffic light detection reporting the precision of 93.9%, the recall of 91.6%, and the recognition accuracy of 89.4%. Considering that the maximum distance between the camera and traffic lights is 70m, the results shows that the proposed method is effective.

Remote Patient Monitoring System for Diagnostic Pure-tone Audiometry (순음 청력검사를 위한 원격진단 모니터링 시스템)

  • Lee, Kang-Ho;Kwon, Yeong-Eun;Kwon, Ohwon
    • Journal of Sensor Science and Technology
    • /
    • v.28 no.5
    • /
    • pp.289-293
    • /
    • 2019
  • This paper presents a remote patient monitoring system for diagnostic pure-tone audiometry. A pure-tone audiometer was developed for basic hearing screening; its performance was evaluated according to international standards in terms of linearity, accuracy, and total harmonic distortion. Pure-tone audiometry has a maximum hearing level of 104.9 dB HL that is comparable with other commercial products. The audiometer shows satisfactory linearity with a deviation of ${\pm}0.4dB$, an accuracy of ${\pm}0.025%$, and a total harmonic distortion (THD) of 0.21%. The remote patient monitoring systems include remote control devices based on wide area network (WAN) connections and an audiometer connected in series. Through experimentation, we successfully performed real-time diagnostic communication without delay in transferring audiometric data. This system is expected to supply domestic equipment in the audiometric market and to improve the quality of life of patients in non-clinical environments.

Performance Testing of the Permanent Magnet Generator and Grid Inverter (영구자석형 발전기와 계통연계형 인버터의 성능실험)

  • Kim, Hyoung-Gil;Kim, Chul-Ho;Seo, Young-Taek
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.679-680
    • /
    • 2008
  • Most of the small wind turbines are set as the stand alone type in the area where the access to the grid is difficult and compulsorily uses the battery. Depending on the volume of the battery, securing of the space necessary, and has the shortcoming of replacing the battery periodically due to it's limited working life span. Recently, setting up in the vicinity of the city area is increasing and the trend of using the Grid inverter instead of battery is also increasing. This thesis is aiming mainly analyzing the characteristics of the output power of the Prototype Permanent Magnet Generator(PMG) and the Grid-Inverter and to verify through the theoretical study and tests. Tested the characteristics of the output power of the PMG through the stage 1-2 and at the stage 3 connected the output of the PMG to the Inverter and tested the characteristics of the Inverter. And at the stage 4, the maximum output power is confirmed by the continuous running test of the PMG.

  • PDF