• Title/Summary/Keyword: Material Uncertainty

Search Result 338, Processing Time 0.028 seconds

Design of High-precision CTE measurement System for the Structural Materials in Space Applications (우주용 구조 재료의 초정밀 열팽창계수 측정시스템 설계)

  • Kim, Hong-Il;Han, Jae-Hung;Yang, Ho-Soon;Cho, Chang-Rae;Cho, Hyok-Jin;Kim, Hong-Bae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.9
    • /
    • pp.916-922
    • /
    • 2008
  • Structures being used in space environment, should be designed to have minimum CTE(coefficient of thermal expansion) for the dimensional stability. Accurate CTE data of the materials are required to design the space structures consisting of various materials. There are uncertainties in the characteristics of materials even though the same manufacturing processes are applied. Therefore, it is needed to measure the thermal deformation of not only the material specimen but also substructures in simulated space environment, such as high vacuum condition. In this research, therefore, precise CTE measurement system using displacement measuring interferometer and vacuum chamber has been designed with uncertainty analysis of the measurements. This system can be used to measure the CTE of the specimen or thermal expansion of the substructure with varying size up to 50cm in length. To measure the low CTE material, overall uncertainty of this system is expected under 0.01ppm/K.

Shear Wave Velocity Profile Considering Uncertainty Caused by Spatial Variation of Material Property in Core Zone of Fill Dam (필댐 축조재료의 공간 변동성에 의한 불확실성이 고려된 국내 필댐 심벽부 전단파 속도 주상도 모델)

  • Park, Hyung-Choon;Nah, Byung-Chan;Lim, Heui-Dae
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.51-60
    • /
    • 2016
  • In determining a shear wave velocity (Vs) profile model based on field tests for dams, the uncertainties always exist. These uncertainties are caused by spatial variations of material properties in each dam and between dams and should be considered in determining Vs profile model for dams. In this paper, these uncertainties are evaluated and Vs profile model for core zone of fill dam in Korea is proposed using the shear wave velocity profiles determined in seven fill dams. The proposed Vs profile model is compared with Kim's model and Sawada-Takahashi model widely used for evaluation of Vs profile of core zone of fill dam.

Development of Conductivity Standards for Metals using the van der Pauw Method (van der Pauw method를 이용한 금속도전율 표준시편 개발)

  • Kang, Jeon-Hong;Yu, Kwang-Min;Lee, Sang-Hwa
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1617-1620
    • /
    • 2013
  • The widely-used measurement methods for conductivity of non-magnetic metals are van der Pauw method, Two Point Probe method and Eddy Current method. Among them a more simpler and easier method is the Eddy Current method and an instrument using the method is a Conductivity Meter which can measure a conductivity by contacting its probe on a sample surface. However, conductivity standards are essentially needed to confirm the meter's performance or to calibrate it. In this study, six kinds of the standards which are made of Cu, Al-1, Al-2, brass, Zn and SUS-316 are developed and conductivity ranges for the standards are 2.27 %IACS ~ 101.6 %IACS with measurement uncertainty of less than 0.3 %.

Purity assignment of 17α-hydroxyprogesterone by mass balance method to establish traceability in measurement

  • Lee, Hwa Shim;Park, Su Jin
    • Analytical Science and Technology
    • /
    • v.32 no.6
    • /
    • pp.225-232
    • /
    • 2019
  • Traceability establishment in chemical measurements is a like a linkage established through an unbroken chain from the measured results to the international system (SI) of units. The primary process for traceability establishment is the purity assignment of a target material to be measured. In this study, we studied the purity assignment of 17α-hydroxyprogesterone (17-OHP). The presence of 17-OHP is indicative of congenital adrenal hyperplasia (CAH) and it builds up due to the deficiency of 21-hydroxylase and 11β-hydroxylase enzyme in the human blood. The purity assignment of 17-OHP was performed by the mass balance method, in which the impurities are categorized into four classes: total related structural impurities, water, residual organic solvents, and nonvolatiles/inorganics. The total related structural impurities were characterized by HPLC-UV; water content was determined by Karl-Fisher coulometer; and the total residual solvents and nonvolatiles/inorganics were determined by TGA. The purity of 17-OHP from a commercial manufacturer was calculated as 993.30 mg/g, and the expanded uncertainty was 0.58 mg/g. The proposed method was validated by uncertainty evaluation and comparing with the actual value of purity.

Reliability Design using Asymptotic Variance of Inverse Cumulative Distribution Function (분위수의 점근적 분산을 이용한 신뢰성 설계)

  • Cho H.J.;Baek S.H.;Hong S.H.;Cho S.S.;Joo W.S.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1682-1685
    • /
    • 2005
  • System algorithms estimated by deterministic input may occur the error between predicted and actual output. Especially, actual system can't predict the exact outputs due to uncertainty and tolerance of input parameters. A single output to a set of inputs has a limited value without the variation. Hence, we should consider various scatters caused by the load assessment, material characteristics, stress analysis and manufacturing methods in order to perform the robust design or estimate the reliability of structure. The system design with uncertainty should perform the probabilistic structural optimization with the statistical response and the reliability. This method calculated the probability distributions of the characteristics such as stress by combining stress analysis, response surface methodology and Monte-Carlo Method and got the probabilistic sensitivity. The sensitivity of structural response with respect to inconstant design variables was estimated by fracture probability. Therefore, this paper proposed the probabilistic reliability design method for fracture of uncorved freight end beam and the design criteria by fracture probability.

  • PDF

Reliability-Based Shape Optimization Under the Displacement Constraints (변위 제한 조건하에서의 신뢰성 기반 형상 최적화)

  • Oh, Young-Kyu;Park, Jae-Yong;Im, Min-Gyu;Park, Jae-Yong;Han, Seog-Young
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.5
    • /
    • pp.589-595
    • /
    • 2010
  • This paper presents a reliability-based shape optimization (RBSO) using the evolutionary structural optimization (ESO). An actual design involves uncertain conditions such as material property, operational load, poisson's ratio and dimensional variation. The deterministic optimization (DO) is obtained without considering of uncertainties related to the uncertainty parameters. However, the RBSO can consider the uncertainty variables because it has the probabilistic constraints. In order to determine whether the probabilistic constraint is satisfied or not, simulation techniques and approximation methods are developed. In this paper, the reliability-based shape design optimization method is proposed by utilization the reliability index approach (RIA), performance measure approach (PMA), single-loop single-vector (SLSV), adaptive-loop (ADL) are adopted to evaluate the probabilistic constraint. In order to apply the ESO method to the RBSO, a sensitivity number is defined as the change of strain energy in the displacement constraint. Numerical examples are presented to compare the DO with the RBSO. The results of design example show that the RBSO model is more reliable than deterministic optimization.

Capacity of a transmission tower under downburst wind loading

  • Mara, T.G.;Hong, H.P.;Lee, C.S.;Ho, T.C.E.
    • Wind and Structures
    • /
    • v.22 no.1
    • /
    • pp.65-87
    • /
    • 2016
  • The wind velocity profile over the height of a structure in high intensity wind (HIW) events, such as downbursts, differs from that associated with atmospheric boundary layer (ABL) winds. Current design codes for lattice transmission structures contain only limited advice on the treatment of HIW effects, and structural design is carried out using wind load profiles and response factors derived for ABL winds. The present study assesses the load-deformation curve (capacity curve) of a transmission tower under modeled downburst wind loading, and compares it with that obtained for an ABL wind loading profile. The analysis considers nonlinear inelastic response under simulated downburst wind fields. The capacity curve is represented using the relationship between the base shear and the maximum tip displacement. The results indicate that the capacity curve remains relatively consistent between different downburst scenarios and an ABL loading profile. The use of the capacity curve avoids the difficulty associated with defining a reference wind speed and corresponding wind profile that are adequate and applicable for downburst and ABL winds, thereby allowing a direct comparison of response under synoptic and downburst events. Uncertainty propagation analysis is carried out to evaluate the tower capacity by considering the uncertainty in material properties and geometric variables. The results indicated the coefficient of variation of the tower capacity is small compared to those associated with extreme wind speeds.

Reliability-Based Topology Optimization for Structures with Stiffness Constraints (강성구속 조건을 갖는 구조물의 신뢰성기반 위상최적설계)

  • Kim, Sang-Rak;Park, Jae-Yong;Lee, Won-Goo;Yu, Jin-Shik;Han, Seog-Young
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.17 no.6
    • /
    • pp.77-82
    • /
    • 2008
  • This paper presents a Reliability-Based Topology Optimization(RBTO) using the Evolutionary Structural Optimization(ESO). An actual design involves some uncertain conditions such as material property, operational load and dimensional variation. The Deterministic Topology Optimization(DTO) is obtained without considering the uncertainties related to the uncertainty parameters. However, the RBTO can consider the uncertainty variables because it has the probabilistic constraints. In order to determine whether the probabilistic constraints are satisfied or not, simulation techniques and approximation methods are developed. In this paper, the reliability index approach(RIA) is adopted to evaluate the probabilistic constraints. In order to apply the ESO method to the RBTO, sensitivity number is defined as the change in the reliability index due to the removal of the ith element. Numerical examples are presented to compare the DTO with the RBTO.

The Research of Velocity Estimation Method in Pipe Pumping for Slurry Transportation (슬러리 이송을 위한 관내 유속 추정 방법 연구)

  • Kwon, Seunghee;Jeong, Soonyong;Kim, Yuseung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.3
    • /
    • pp.21-32
    • /
    • 2014
  • This Research have suggested the new estimation method using parameter estimation algorithm to substitute established velocity and friction factor calculation equation. Established calculation equation has some difficulties for estimation and reflecting exactly flow specification cause parameter uncertainty and material uncertainty governed real phenomenon, so this research has used system modeling method for flow specification estimation and suggested estimation method.

Data complement algorithm of a complex sewerage pipe system for urban inundation modeling

  • Lee, Seungsoo;An, Hyunuk;Kim, Yeonsu;Hur, Young-Teck;Lee, Daeeop
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.3
    • /
    • pp.509-517
    • /
    • 2020
  • Geographic information system (GIS) sewer network data are a fundamental input material for urban inundation modeling, which is important to reduce the increasing damages from urban inundation due to climate change. However, the essential attributes of the data built by a local government are often missing because the purpose of building the data is the maintenance of the sewer system. Inconsistent simplification and supplementation of the sewer network data made by individual researchers may increase the uncertainty of flood simulations and influence the inundation analysis results. Therefore, it is necessary to develop a basic algorithm to convert the GIS-based sewage network data into input data that can be used for inundation simulations in consistent way. In this study, the format of GIS-based sewer network data for a watershed near the Sadang Station in Seoul and the Oncheon River Basin in Busan was investigated, and a missing data supplementing algorithm was developed. The missing data such as diameter, location, elevation of pipes and manholes were assumed following a consistent rule, which was developed referring to government documents, previous studies, and average data. The developed algorithm will contribute to minimizing the uncertainty of sewer network data in an urban inundation analysis by excluding the subjective judgment of individual researchers.