• Title/Summary/Keyword: Master Model

Search Result 640, Processing Time 0.022 seconds

A Study on the Application of the Tourist Attraction System Model and the Tourism Destination Region Design Model to Analyzing the Eastern Pusan Resort Master Plan (관광매력물시스템모형과 관광목적지역디자인모형을 응용한 동부산권관광단지개발계획안 분석에 관한 연구)

  • 양위주
    • Journal of Korean Port Research
    • /
    • v.14 no.3
    • /
    • pp.279-290
    • /
    • 2000
  • The purpose of this study is to suggest the analytical framework for a spatial structure of a tourism destination master plan by the two types of the tourism development models: Tourist attraction System Model and Tourism Destination Region Design Model. The resort development plan is introduced as a planning tool for regenerating the eastern Pusan regions, but the economic and environmental impacts and the sociocultural dilemma accompanied by the development should be fully considered before launching the business. The development plan announced currently is traced and examined in comparison with the upper-leveled and related plans. The Tourist Attraction System Model based on the systems theory is applied to the designated regions. The Tourism Destination Region Design Model then is applied for analyzing the components of each region on the master plan. The results of the findings suggest that the tourism destination plan is basically different from a general master plan on the physical comprehensive plan, the destination is recognized as a subsystem of the whole tourism system, and thus tourism destination plan is considered as a spatial arrangement of tourism facilities and the inter- and intra-circulation.

  • PDF

MARS/MASTER Solution to OECD Main Steam Line Break Benchmark Exercise III

  • Jeong, Jae-Jun;Joo, Han-Gyu;Chung, Bub-Dong;Ha, Kwi-Seok;Lee, Won-Jae;Cho, Byung-Oh;Zee, Sung-Quun
    • Nuclear Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.214-226
    • /
    • 2000
  • In an effort to assess the performance of KAERI's coupled 3D kinetics - system T/H code, MARS/MASTER, Exercise III of the OECD main steam line break benchmark is solved. The analysis model of the reference plant, TMI-1 - a 2772 MWth B&W plant, consists of three major components: a core neutronics model involving 241$\times$28 neutronic nodes, a vessel 3D T/H model consisting of 374 hydrodynamic volumes, and a 1D system T/H model containing 157 hydrodynamic volumes. The results show that there is a significant amount of flow mixing occurring in the upper and lower plenum regions and the core power distribution evolves to a highly localized shape due to the presence of a stuck rod, as well as the asymmetric flow distribution. It is judged that MARS/MASTER properly captures these drastic 3-dimensional effects. Comparisons with other results submitted to OECD confirm the accuracy of the MARS/MASTER solution.

  • PDF

Comparison of the accuracy of digital models made from white light scanner by scanning method (스캐닝 방법에 따른 백색광 스캐너 기반으로 채득된 디지털 모형의 정확성 비교)

  • Kim, Ki-Baek;Lee, Gyeong-Tak;Kim, Jae-Hong
    • Journal of Korean society of Dental Hygiene
    • /
    • v.12 no.6
    • /
    • pp.1082-1089
    • /
    • 2012
  • Objectives : The aim of this study was to determine the accuracy of digitized stone models, impression materials compared to the master model and the reliability of the computer aided analysis. Methods : A master model(500B-1, Nissin dental product, Japan) with the prepared lower full arch tooth was used. Ten vinyl polysiloxane impressions(Examix$^{(R)}$, GC Industrial Corp, Japan) of master model were taken and type IV stone(aesthetic-base gold$^{(R)}$, Dentona, Germany) were poured in stone models. The linear distance between the reference points were measured and analyzed on the Delcam Copycad$^{(R)}$(Delcam plc, UK). The t-student test for paired samples was used for statistical analysis. Results : The mean differences to master model for stone model and impression material were 0.11~0.19mm, and 0.19~0.29mm, respectively. There were statistical differences in dimensional accuracy for full arch impression between master model and stone model/impressions(p<.05). Conclusions : Two different scanning methods showed clinically acceptable accuracy of full arch digital impression produced by them. These results will have to be confirmed in further clinical studies.

Predictive Control of Bilateral Teleoperation with Short Time Delay (시간 지연이 있는 양방향 원격제어 시스템의 예측 제어)

  • Im, Heung-Jae;Chung, Wan-Kyun;Suh, Il-Hong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.6 no.4
    • /
    • pp.295-304
    • /
    • 2000
  • In the teleoperation system, force and velocity signals are communicated between a master and a slave robot. The addition of force feedback to a teleoperation system benefits the operator by providing more information to perform given tasks especially for tasks requiring contact with environment. When the master and slave arms are located in different places, time delay is unavoidable and it is well known that the system can become unstable when even a small time delay exists in the communication channel. The control scheme proposed in this paper is based on the estimator with virtual master model. Delayed signal from the master robot can be replaced by the estimated signal with the virtual master model. This control scheme makes the teleoperation system stable for the given time delay while the conventional scheme is not. This new control scheme is verified through numerical simulations and an experiments using the dual axis testbed of the teleoperation system.

  • PDF

Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule (대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션)

  • Kim, Kwang-Sik;Hwang, Ho-Jin;Lee, Jang-Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.111-122
    • /
    • 2012
  • Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule.

Application of Modified Ramberg-Osgood Model for Master Curve of Asphalt Concrete (아스팔트 콘크리트 메스터 극선에 대한 수정 Ramberg-Osgood 모델 적용)

  • Kweon, Gi-Chul
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.31-40
    • /
    • 2008
  • The dynamic moduli of asphalt concrete are very important for the analysis and the design of asphalt pavement systems. The dynamic modulus master curve is usually represented by a sigmoidal function. The Ramberg-Osgood model was widely used for fitting of normalized modulus reduction curves with strain of soils in soil dynamic fields. The master curves were obtained by both sigmoidal functions and modified Ramberg-Osgood model for the same dynamic modulus data set, the fitting abilities of both methods were excellent. The coefficients in sigmoidal function are coupled. Therefore, it is not possible to separate the characteristics of the master curve with absolute value and shape. However, the each fitting coefficient in the Ramberg-Osgood model has a unique effect on the master curve, and the coefficients are not coupled with each other.

  • PDF

Teleoperatoin System Control using a Robust State Estimation in Networked Environment (네트웍 환경에서의 강건상태추정을 이용한 원격조작시스템 제어)

  • Jin, Tae-Seok;Kim, Hyun-Sik
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.18 no.6
    • /
    • pp.746-753
    • /
    • 2008
  • In this paper, we introduce the improved control method are communicated between a master and a slave robot in the teleoperation systems. When the master and slave robots are located in different places, time delay is unavoidable under the network environment and it is well known that the system can become unstable when even a small time delay exists in the communication channel. The time delay may cause instability in teleoperation systems especially if those systems include haptic feedback. This paper presents a control scheme based on the estimator with virtual master model in teleoperation systems over the network. As the behavior of virtual model is tracking the one of master model, the operator can control real master robot by manipulating the virtual robot. And LQG/LTR scheme was adopted for the compensation of un-modeled dynamics. The approach is based on virtual master model, which has been implemented on a robot over the network. Its performance is verified by the computer simulation and the experiment.

Surface Temperature Retrieval from MASTER Mid-wave Infrared Single Channel Data Using Radiative Transfer Model

  • Kim, Yongseung;Malakar, Nabin;Hulley, Glynn;Hook, Simon
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.1
    • /
    • pp.151-162
    • /
    • 2019
  • Surface temperature has been derived from the MODIS/ASTER airborne simulator (MASTER) mid-wave infrared single channel data using the MODerate resolution atmospheric TRANsmission (MODTRAN) radiative transfer model with input data including the University of Wisconsin (UW) emissivity, the National Centers for Environmental Prediction (NCEP) atmospheric profiles, and solar and line-of-sight geometry. We have selected the study area that covers some surface types such as water, sand, agricultural (vegetated) land, and clouds. Results of the current study show the reasonable geographical distribution of surface temperature over land and water similar to the pattern of the MASTER L2 surface temperature. The thorough quantitative validation of surface temperature retrieved from this study is somehow limited due to the lack of in-situ measurements. One point comparison at the Salton Sea buoy shows that the present estimate is 1.8 K higher than the field data. Further comparison with the MASTER L2 surface temperature over the study area reveals statistically good agreement with mean differences of 4.6 K between two estimates. We further analyze the surface temperature differences between two estimates and find primary factors to be emissivity and atmospheric correction.

Assessment Model of Student's Satisfaction in IT Master Programs based on Employment-Contract (IT분야 채용조건형 계약학과의 학생 만족도 평가모형 개발에 관한 연구)

  • Park, Sang-Min;Kim, Tae-Sung;Kwon, Sun-Dong
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.83-95
    • /
    • 2013
  • This study aims to analyze factors that affect satisfaction of students in employment-contract information technology master programs, and suggest policy implications to improve management of employment-contract master programs. A survey of students supported by Software master program of National IT Industry Promotion Agency (NIPA) and Knowledge Information Security master program of Korea Internet and Security Agency (KISA) indicates that department administration, department vision, scholarship, adviser, and lecturer affect satisfaction of students in employment-contract master programs in listed order.

Accuracy of full arch digital model obtained from rendering-based intraoral scanner(IOS) : An example of CS-3600 system (동영상 촬영방식의 구강스캐너로 채득된 전악치열 디지털모형의 정확도 분석 : CS-3600 시스템을 중심으로)

  • Kim, Jae-Hong
    • Journal of Technologic Dentistry
    • /
    • v.42 no.1
    • /
    • pp.17-25
    • /
    • 2020
  • Purpose: The purpose of this study was to evaluate and compare the accuracy of definitive casts that are fabricated from digital intraoral impression and conventional impression technique. Methods: A master model(ANNA-4, Frasaco GmbH, Tettnang, Germany) with the prepared upper full arch tooth was used. Conventional impression and then stone model(n=10) were produced from this master model, and on the other hands, digital impressions were made with the CS-3600 intraoral scanner(n=10). Six linear measurements were recorded between landmarks, directly on each of the stone models on two occasions by a single examiner. Measurements were made with a digital caliper to the nearest 0.01mm from manual models and with the software(Delcam PowerSHAPE) from the virtual models. The t-student test for paired samples and intraclass correlation coefficient(ICC) were used for statistical analysis. Results: The measurement of two methods showed good reliability. The ICC of the two models were 0.88~0.91(stone model) and 0.94~0.99(digital model). The mean differences to master model for stone model and digital model were 0.10~0.14mm, and 0.14~0.20mm, respectively. Conclusion: The definitive casts obtained with digital intraoral technique model had significantly larger dimensions as compared to those of the stone model. However, the differences to the master model detected appear to provide enough accuracy and reliability for clinical application.