• 제목/요약/키워드: Manufacturing Cycle Time

검색결과 264건 처리시간 0.026초

기존 CIM을 활용한 제조업체에서의 CALS 구축 방안 (Building CALS System using CIM in Manufacturing Company)

  • 이영해;최영하;전성진
    • 한국전자거래학회지
    • /
    • 제1권2호
    • /
    • pp.27-47
    • /
    • 1996
  • Manufacturing companies must have close relationships with cooperative companies and customers under dynamic market surroundings. Not only product life cycle, but also the allowed period between development of product and sale becomes shorter. In spite of these situations, most manufacturing companies have insufficient capabilities of the information technology and data exchange formats between companies are so different. Thus, there exists a limit on the efficient management of companies. These problems in manufacturing companies could be solved by CALS. Through CALS the company responses quickly to customer demand, transfers this information to manufacturing systems automatically, and distributes products at appropriate time In short, CALS is a strategy to distribute products satisfying with quality, cost and delivery. And up to now, most manufacturing companies have proceeded CIM systems. In this paper, an approach for the efficient building CALS system through extension of CIM in the manufacturing companies is proposed.

  • PDF

공정평균의 변화율이 정규분포인 제조공정의 최적 목표값 (Optimum target values for manufacturing processes when drifting rate in the process mean is normally distributed)

  • 이재훈;박태호;권혁무;홍성훈;이민구
    • 품질경영학회지
    • /
    • 제38권4호
    • /
    • pp.540-548
    • /
    • 2010
  • We consider the problem of selecting the most profitable initial process mean and length of production cycle for manufacturing processes subject to a constant linear trend during the same cycle that varies after resetting the processes. Assuming that the quality characteristic of interest is normally distributed, the optimum initial process mean and the length of production cycle are jointly obtained by minimizing the expected loss per unit time. We assume that the quality loss function due to the deviation from the target value is quadratic and resetting loss is constant. We consider both cases of symmetric and asymmetric quality loss function. An illustrative example is given and sensitivity analysis performed.

다중회귀분석을 활용한 국내 기업의 공급체인관리 성과지표와 기업 시장가치와의 상관관계 분석 : 재고와 현금화주기를 중심으로 (The Relationship between Supply Chain Management Performance Metrics and Corporate Value for Firms in Korea by Using Multiple Linear Regression Analysis : Focused on Inventory and Cash-To-Cash Cycle Time)

  • 장금주;양재환
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.241-254
    • /
    • 2012
  • This paper studies the relationship between SCM(Supply Chain Management) metrics and corporate value (Tobin's Q) for manufacturing and wholesale/retail firms in Korea. Specifically, the multiple regression analysis is used to investigate the relationships 1) between inventory level, inventory turns, and days of inventory and Tobin's Q and 2) between cash-to-cash (C2C) cycle time including its components such as days of inventory, days sales outstanding, and days payable outstanding and Tobin's Q. The results indicate that there exist statistically significant negative relationships between inventory levels and days of inventory (DOI) and Tobin's Q. Also, we found that there exist commonly known negative correlations between days of raw materials inventory and days of work in process (WIP) inventory and Tobin's Q. For the C2C cycle time, we found that there -exists a statistically significant negative relationship between the C2C cycle time and Tobin's Q. Also, we found that there exist commonly known correlations between the two components of C2C cycle time and Tobin's Q such as the negative for DOI and days sales outstanding. This study clearly shows the negative relationship in general between inventory levels and corporate value and between C2C time and corporate value, and this kind of result has not been found by previous studies in Korea.

동기화 생산을 위한 조달물류 개선에 관한 연구 (A Study on the improvement of procurement logistics for synchronous manufacturing)

  • 유성희;장정환;장청윤;이창호
    • 대한안전경영과학회지
    • /
    • 제15권4호
    • /
    • pp.261-267
    • /
    • 2013
  • In automobile company it is needed to establish the collaborative relationship between the assembly company and the part manufacturing company. In this paper we established the improvement for the procurement logistics and logistics in assembly company and thus we derived the near optimal procurement cycle through the simple EXCEL simulation and the improved inventory management method for H automobile company in CHINA. At this time we adopted the pull manufacturing process instead of push manufacturing process. We resulted that the manufacturing activity of both companies was stabilized and the usage of storage area in assembly company was reduced by 50%, especially it was reduced by 100% in the case of directly delivering the parts to assembly line through the third party logistics company.

반도체 설비의 효율성 제고를 위한 설비 할당 스케줄링 규칙에 관한 연구 (A Study on Deterministic Utilization of Facilities for Allocation in the Semiconductor Manufacturing)

  • 김정우
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.153-161
    • /
    • 2016
  • Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.

NC 공작기계의 운동정도 측정에 관한 연구(제1보) - NC 선반의 직선 사이클 위치결정정도 측정에 관하여 - (A Study on Measuring of Motion Accuracy of NC Machine Tools(No.1) -about Measuring of Linear Cycle Positioning Accuracy of NC Lathe)

    • 한국생산제조학회지
    • /
    • 제7권1호
    • /
    • pp.82-88
    • /
    • 1998
  • It is very important to test linear cycle positioning accuracy of NC lathes as it affect all other machines machined by them in industries. For example, if the linear positioning accuracy of x or z-axis directions is bad, the size of works will be wrong and the change-ability will be bad in the assembly of machine parts. In this paper , measuring systems are organized to measure linear displacement of ATC(Automatic tool changer) of NC lathe using laser interferometer, magnescale and tick pulses coming out from computer in order to get data at constant time intervals from the sensors, And each set of data gotten from test is expressed to a plots by computer treatment and the results of linear positioning error motion is estimated to numerics by statistical treatments.

  • PDF

냉간 인발된 쾌삭강의 칩절단특성 (Chip Breaking Characteristics of Cold-Drawn Free Machining Steel)

  • 최원식
    • 한국생산제조학회지
    • /
    • 제8권4호
    • /
    • pp.45-51
    • /
    • 1999
  • In this study to assess chip breaking characteristics of cold-drawn free machining steels a newly developed non-dimensional parameter chip breaking index CB has been adopted. And for comparison with free machining steels chip breaking characteristics of conventional carbon steels were investigated. Properly controlled chips were produced with the CB value of 0.05-0.2 regardless of steel types. In case of cold-drawn free machining steels however cycle times of chip breaking are relatively shorter than those of conventional steels. And properly controlled chips were obtained from wider range of feed rate.

  • PDF

프로세스 재설계에 대한 가치평가모형: 제조업체 사례연구 (Evaluation Model of the Value of Process Redesign: A Case Study of Manufacturing Company)

  • 이상재
    • 한국경영과학회지
    • /
    • 제24권4호
    • /
    • pp.81-94
    • /
    • 1999
  • Organization change projects such as Business Process Redesign(BPR) have been implemented by many firms for enhancing their organizational performance. However, management is reluctant to initiate these projects due to enterprise-wide impact and steeper project cost than the traditional system development projects. Thus, there emerges a need to accurately assess the value of the redesigned organizational process for the successful implementation of BPR projects. The purpose of this study is to assess the value of process redesign in the point of resource utilization and allocation, and cycle time and cost reduction. The candidate process and the design alternatives are identified from organizational requirements analysis. The variables and their relations are defined to perform task activity analysis, bottleneck analysis, cycle cost analysis, and resource utilization analysis. A Case study of a manufacturing company indicates that the assessments method proposed in this study is a promising approach to identify the business alternative process that lead to the highest organizational performance.

  • PDF

금속 절삭가공 공정의 최적 절삭 조건 및 가공주기 결정 방안 연구 (A study on a machining cycle and optimal cutting conditions on multi-satations)

  • 황홍석;황규완
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.104-107
    • /
    • 1996
  • This paper focuses on a automation selection of optimal cutting conditions and cycle time for multi-spindle metal cutting machines based on machining parameters and tool change schemes which are the two most common terms used in the metal cutting. In this research we used two step generative approach, step 1 is mathematical modeling for the selection fo optimal cutting conditions and the other is GMDH-Type modeling to estimate the system performance evaluation. We developed computer programs for these models and the fitting manufacturing examples are applied to this model and it was shown that the proposed approach has a good potential and offers a valuable tools to analyse the metal cutting system.

  • PDF

CNC 만능 원통연삭기의 CAD/CAM 시스템 개발 (Development of the CAD/CAM System for CNC Universal Cylindrical Grinding Machines)

  • 조재완;김석일
    • 한국CDE학회논문집
    • /
    • 제5권4호
    • /
    • pp.312-318
    • /
    • 2000
  • In this study, an exclusive CAD/CAM system is developed for enhancing the effectiveness and productivity of CNC universal cylindrical grinding machines on which the external/facing/internal grinding cycles and the wheel dressing cycles are integratively carried out. The CAD/CAM system can manage the various processes such as geometry design, NC code generation, NC code verification, DNC operation, and so on. Especially, the feature-based modeling concept is introduced to improve the geometry design efficiency. And the NC code verification is realized by virtual manufacturing technique based on the real-time analysis of NC codes and the boolean operation between workpiece and wheel.

  • PDF