• Title/Summary/Keyword: Management risk factors

Search Result 2,553, Processing Time 0.025 seconds

A study on risk factors having effect on perception of tower crane incident risk (타워크레인 사고 위험 지각에 영향을 미치는 위험 요인에 관한 연구(타워크레인 업무유형의 조절효과를 중심으로))

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • Construction sites have gradually become bigger and bigger according to Korea economic growth. Also use of tower crane and other heavy equipment has been increased. The increased use of heavy equipment like tower crane is leading to fatality incident. This study will verify hazards to influence tower crane incident through structural and positive verification and find which hazard influence incident risk. The result of this study is as follows. First, while there is a significant difference between safety managers and tower crane operators for working environment, safety management, personal manage among risk factors, we can not find any evidence on the difference in perception of tower crane incident risk between them. Second, task manage risk and personal manage risk has a significant positive effect on perception of tower crane incident risk. Third, while site environment risk has a significant positive moderating effect of task type between risk factors and perception of tower crane incident risk, personal environment risk has a significant negative moderating effect between them.

The Impact of BCMS Risk Assessment on Business Performance (BCMS의 위험평가가 경영성과에 미치는 영향)

  • Jang, Geun-Young;Kim, Deok-ho;Cheung, Chong-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.81-96
    • /
    • 2021
  • Purpose: Based on the preceding studies in supply chain management, factors were analyzed to verify the effect of risk assessment and risk management factors of the business continuity management system (BCMS) on management performance. The purpose of this study is to establish a systematic risk management plan by deriving the risk factors of BCMS and evaluating unpredictable risks, and at the same time, contributing to a company's competitive advantage without interruption of work. Method: The structural relationship between risk assessment, risk management and management performance of BCMS was derived. To this end, a questionnaire survey was conducted of 124 managers and managers in Korean companies. Frequency analysis, validity analysis, reliability analysis, correlation analysis, and simple regression analysis were performed. Result: First, risk assessment had a positive (+) effect on risk management. Second, risk management had a positive (+) effect on management performance. Finally, risk assessment had a positive (+) effect on management performance. Conclusion: BCMS's risk assessment and risk management capabilities should be managed through financial performance, and risk management activities should be managed through non-financial performance.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

A Case Study of Risk Management factors in Web Design Project (웹 디자인 프로젝트에서 리스크 매니지먼트 요인에 대한 사례 연구)

  • 박은영
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.69-78
    • /
    • 2003
  • Risk Management is one of the most important factors in web design project management. The purpose of risk management is to identify reasons of risk to avoid risky situation and successfully achieve final goal of the project. This paper first describes concept of the web design project management and its processes. Secondly this study presents planning principles for systematic risk management process. Also it suggests a model of risk management. Finally this paper demonstrates utility of the risk management model through case studies based on the suggested risk management model.

  • PDF

The Effects of IT Project Risk Management Factors on Project Performance (IT 프로젝트 위험관리요인이 프로젝트 성과에 미치는 영향)

  • Jang, Sung-Bong;Kwahk, Kee-Young
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.31-51
    • /
    • 2011
  • Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

Risk Factor Classification and Weight Estimation for Urban Regeneration Project (도시재생사업의 리스크요인 분류 및 중요도 산정)

  • Cho, Jae-Kyung;Hyun, Chang-Taek;Yoon, You-Sang;Jin, Run-Zhi;Cha, Yong-Woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.89-99
    • /
    • 2012
  • Urban regeneration projects tingeing the shape of mixed-use development, due to the nature of the business, involve risk factors such as protracted business conflict among participations, subjects, complex approval and permission procedure, frequent policy changes, etc. Therefore, systematic risk management is needed to effectively manage the numerous risk factors that may occur during the process course of project. However, risk management of large and complex development projects such as urban regeneration projects is in the introduction stage yet and somewhat one time risk management plan has been established. Therefore, in this study, in order to systematic risk management of urban regeneration projects inhered numerous risk factors, risk factors for urban regeneration projects through preceding studies and case studies were presented. Also risk factors are classified in accordance with business propulsion phase, by estimating the importance for these, step by step emphasis on managed subjects of risk management was proposed.

A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction (측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로-)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.901-904
    • /
    • 2008
  • The purpose of this study is to identify the risk factors, analyze the risk factors and make a risk check list of survey in road construction. Generally. the risk management is consisted of 3 steps: risk identification, Risk analysis, Risk hedge. This study is focused on the identification of risk and analysis of risk. To identify the risk factors of survey, we used the specifications of road construction, law of survey, and check list of road construction. This study provides the risk check list of survey for road construction. This research was undertaken to analyze risk factors being determine by the FGI(Focus Group Interview) method with survey specialists.

  • PDF

Investigation and Empirical Validation of Industry Uncertainty Risk Factors Impacting on Bankruptcy Risk of the Firm (기업부도위험에 영향을 미치는 산업 불확실성 위험요인의 탐색과 실증 분석)

  • Han, Hyun-Soo;Park, Keun-Young
    • Korean Management Science Review
    • /
    • v.33 no.3
    • /
    • pp.105-117
    • /
    • 2016
  • In this paper, we present empirical testing result to examine the validity of inbound supply and outbound demand risk factors in the sense of early predicting the firm's bankruptcy risk level. The risk factors are drawn from industry uncertainty attributes categorized as uncertainties of input market (inbound supply), and product market (outbound demand). On the basis of input-output table, industry level inbound and outbound sectors are identified to formalize supply chain structures, relevant inbound and outbound uncertainty attributes and corresponding risk factors. Subsequently, publicly available macro-economic indicators are used to appropriately quantify these risk factors. Total 68 industry level bankruptcy risk forecasting results are presented with the average R-square scores of between 53.4% and 37.1% with varying time lag. The findings offers useful insights to incorporate supply chain risk to the body of firm's bankruptcy risk level prediction literature.

A Study on the Risk Evaluation of Construction Management Based on Risk Identification (위험도 기반 건설경영 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Lee, Gun;Yeo, Sang-Ku;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.83-91
    • /
    • 2009
  • Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.