1 |
Kim Chang Eun, Lee Weon Geun & Yoon San Ha(2002), "A Study on The Development of Safety Esimation Program for Tower Crane.", K. Korea Saf, Manag. Sci., 4(2):43-56.
|
2 |
Korea industry Safety(2015), A Case Study and Safety of Tower Crane Incidents.
|
3 |
Kwon, Oh-man(2015), Deduction of Incident Cause for Tower-crane using FMEA Method.
|
4 |
Kyu-hyung Shim, Dong-ho Rie(2010), "A Quantitative Risk Analysis of Related to Tower Crane Using the FMEA.", Journal of the KOSOS, 25(6):34-39.
|
5 |
Lee, Hae-Suk(2014), A Study on the Control and Analysis for Cause of Tower Crane Incident, Master Thesis, Seoul National University of Science & Technology.
|
6 |
Myeoung-Gu Lee, Min-Lae Ru(2001), "Structural Analysis for the Collapse Accident of Tower Crane.", Journal of the KIIS, 16(4):147-152.
|
7 |
Son, K. S. & Eun, N. K.(2013), "Weighting Factors of Consciousness between Main and Sub Contractor for Establishing and Effective Risk Management in Construct Industry.", Journal of the Korean Society of Safety, 28(4):72-80.
DOI
|
8 |
Seo-Yeon Choi, Kee-Hong Cho, Dong-Hyun Park, Byung-Gil Choi(2015), "A study on the work environment and incident exposure status of Tower Crane workers.", K. Korea Saf, Manag. Sci, 71(3):115-123.
|
9 |
Yoon In Soo, Kang Kyung Sik(2007), "A Study on the Safety Inspection System Model of the Tower Crane a Construction Site in Korea.", 9(1):37-49.
|