• Title/Summary/Keyword: Major Construction Company

Search Result 121, Processing Time 0.025 seconds

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.

A Study of FEED Verification process of Small Utility Equipment in Offshore plant (해양플랜트 소형 유틸리티장비의 FEED 검증 프로세스에 대한 연구)

  • Han, Seong-Jong;Park, Beom
    • Plant Journal
    • /
    • v.13 no.2
    • /
    • pp.39-45
    • /
    • 2017
  • This paper is a study on FEED validation model that can be used in the bidding stage of small utility equipment in offshore plant industry using system engineering technique. Currently, domestic marine plant equipment industry companies are faced with the financial risk of project execution as they enter marine plant. The major cause was the insufficient ability to verify the FEED output from the contractor (Engineering or Procurement and Construction) of the equipment manufacturer (COMPANY or EPC). Therefore, we propose FEED design verification method that simplifies the system engineering method that sequentially applies requirements analysis, function, performance analysis and physical architecture building process. Also, we verified the suitability of the developed model by comparing the results of applying the developed FEED verification model and the verification method that depends on the existing experience for the small utility equipment (Air Compressor).

  • PDF

Development of a PMIS Emphasizing On-Site Management Functions (현장 중심의 건설사업 관리시스템의 개발)

  • Shin Seung-Sik;Chun Jin-Yong;Kim Dae-Jin;Woo Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.545-548
    • /
    • 2003
  • In the past, there were problems in managing construction due to the lack of effective communication and sharing information between a constructor and an owner during construction works. To solve those problems, several major construction companies made great efforts to get a higher productivity through the systematic management, cumulating construction know-how. As a result of the endeavor, some of those companies developed the foundation of PMIS(Project Management Information System). However, it is thought that PMIS on the construction site was not effectively used in performing construction. Therefore, through the case of contractor's management system which is being used in 1-4 out field construction site in Incheon International Airport Rail of P construction company, this paper deals with the development of system supporting to the practical work of construction site and it'll provide to be the foundation of making effective PMIS.

  • PDF

Development of Expert system for Plant Construction Project Management (플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발)

  • 김우주;최대우;김정수
    • Journal of Information Technology Application
    • /
    • v.2 no.1
    • /
    • pp.1-24
    • /
    • 2000
  • Project management in the Construction field inherently has more uncertainty and more risks relative to ones from other area. This is the very reason for why project management is recognized as the important task to construction companies. For getting better performance in the project management, we need a system that keeps the consistencies in a automatic or semi-automatic manner through the project management stages like as project definition stage, project planning stage, project design and implementation stage. But since the early stages such as definition and planning stages has many unstructured features and also are dependent to unique expertise or experience of a specific company, we have difficulty providing systematic support for the task of these stages. This kind of problem becomes harder to solve especially in the plant construction domain that is our target domain. Therefore, in this paper, we propose and also implement a systematic approach to resolve the problem mentioned for the early project management stages in the plant construction domain. The results of our approach can be used not only for the purpose of the early project management stages but also can be used automatically as an input to commercial project management tools for the middle project management stages. Because of doing in this way, the construction project can be consistently managed from the definition to implementation stage in a seamless manner. For achieving this purpose, we adopt knowledge based inference, CBR, and neural network as major methodologies and we also applied our approach to two real world cases, power plant and drainage treatment plant cases from a leading construction company in Korea. Since these two application cases showed us very successful results, we can say our approach was validated successfully to the plant construction area. Finally, we believe our approach will contribute to many project management problems from more broader construction area.

  • PDF

A Study on the Development Prospects of Building Construction Productivity through Construction Status Analysis (건설업 실태분석을 통한 건설업생산성의 발전전망에 관한 연구)

  • Park, Hong Tae;Jeon, Jun Tai;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.242-257
    • /
    • 2012
  • Korea's population change trend is the aging and feminization as Reduction in mortality, average life extension. and is further increased Reduction of birth rate and aging population. if Our country concluded FTA(Free Trade Agreement) with the United States, Europe and China etc. labor-intensive industries will be the decline. Then, the construction workers' jobs are continually reduced. This is critical to the nation's economic, social and environmental influences due to Shortage of construction workforce and increasing labor costs. Eventually this is a major factor in reduced construction productivity. Therefore, this study is presented as a construction productivity development prospects on the value-added analysis per Labour productivity employee from Construction market trends, industry-specific productivity index, industry trends Employed, age tiered workforce trends, women's workforce trends, labor time trend, foreign workers, workforce trends, analysis of trends in construction contract, awarded by Company Size trends, construction management analysis index.

Developing the Optimized Method of Reliability-Growth Target Setting for Complex and Repairable Products from Business View

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.15 no.4
    • /
    • pp.248-255
    • /
    • 2015
  • Purpose : The purpose of this research is to develop the optimized method and process in the reliability-growth target setting, especially for complex and repairable system (or products) such as vehicle and airplane, construction equipment. Method : A reliability-growth test plan specifies a scenario to achieve the planned reliability value (or reliability target). The major elements in test planning are reliability-growth starting time and reliability level at that time, reliability-growth rate and reliability-growth target. All of them except a reliability target can be referred to the previous development data and reference researches. The reliability target level is directly influencing to test period (or time) which is related to test and warranty cost together. There are a few researches about the reliability target setting method and but showing the limitations to consider the views of engineering, business and customer together. There is no research how to handle the target setting process in detail. Result : We develop the optimized method and systematic process in reliability target setting with considering such views. This research also establish the new concept as production capability which means company (or supplier) capability to product its products. Conclusion : In this research result, we apply the new method to a few projects and can set the reasonable test planning. The developing results is showing the good balance between the developing cost and warranty cost at market.

A Study on education program for human resource development on concentrating the enterprise participation (참여기업 중심형 인력양성 교육 프로그램에 관한 연구)

  • Chae, Myeong-Suk
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.337-342
    • /
    • 2015
  • The company of 4 core materials that are needed for photovoltaic generation is located in area around this university in Gunsan, Saemangeum. And also, it was almost completed the value chain about the production of Polysilicon, Ingot, Wafer, modules and the design, construction of generation system. The industry-academy-government has understood that because of the relative companies' production and investment, it leads to a supply and demand of manpower and thus will have field centered manpower education. This program will help the problem of lack of manpower in relative companies by establishing competitive major agreement like vocational education system. Also, the university and the participating company in joint have pushed ahead field business education to make the least of industrial-education's mismatch, the training of professional manpower connected with related industries to make the universities chemical characteristics, companies securing excellent manpower and contributed to the revitalization of the regional economy. In this paper, are aware that photovoltaic industry is a future strategic industry for the country, so we will train the immediately site adapting manpower for the area of photovoltaic material and system as our goal. This is shown results of education operation for 4 years.

A Case Study of Quality Management System Computerization with SAP QM Module & Mobile Office Construction (품질경영 성과 향상을 위한 ERP QM모듈 및 모바일 오피스 기반의 품질경영시스템 구축에 관한 연구 - A사(社) 사례(事例)를 중심(中心)으로-)

  • Kwon, Oh-Hyun;Park, Yong-Tae
    • The Journal of Information Systems
    • /
    • v.23 no.2
    • /
    • pp.49-66
    • /
    • 2014
  • In today's competitive business environment it is a necessary condition for a company to produce high-quality product for its survival and growth. That is the case in the auto-part industry as well where the international standards, ISO/TS 16949 certification, are required by customers to adopt mandatory. This study presents a successful implementation of quality management system(QMS) in a major auto-part manufacturer in Korea, utilizing SAP's QM(qualaity management) module and a mobile office system. The QMS brought the company "A" a variety of benefits such as real-time availability of product-inspection data, speedy decision-making, reduction in time required for defect-handling, ease of vertical integration of business partners in supply chain, and ease of business process standardization between headquarters and overseas subsidiaries. It is expected that the findings of this study can be used as a useful guideline for companies to consider implementing ERP-based quality management systems successfully.

A plan for the development of high skilled manpower in the plant construction industry (플랜트 건설산업의 경쟁력 향상을 위한 전문 인력양성 방안)

  • Lee, Kkoch-Nim;Jun, Young-Joon;Noh, Jae-Yoon;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.699-703
    • /
    • 2007
  • The recent plant order of oversea in domestic engineering and Construction Companies have been growing since 2003. In 2006, the total order came out 2.54 billion dollar. And in a quarter of 2007, the Ministry of Commerce announced that total order already came out 900 million dollar. They expect that the plant industry in the global market will be grown more in near future. However, even though there is growing plant businesses in oversea specially focused on the Middle East area, the domestic large engineering and Construction Company now face up the shortage of specialty manpower. Moreover, the domestic small and medium enterprises have same problems as large companies have. The plant construction industry is expanding rapidly, but the supply of specialty manpower can not follow its growing business. Also, most new supplied manpower is the person who graduated recently and received the degree in the different civil engineering track other than the plant major track, they are required to be re-educated. So, it is unable to deploy in short time. Also, there is shortage of manpower in the Construction Management financing division. Consequently, this project will study the efficient method of training for specialty manpower, provide the solutions.

  • PDF