• Title/Summary/Keyword: Maintenance and Restoration

Search Result 298, Processing Time 0.03 seconds

Importance-Satisfaction Analysis of Users of Gochang Jayeonmadang Project (고창 자연마당 조성사업 이용자의 중요도·만족도 분석)

  • Jin Pyo Hong;Yun Jin Shim;Jung Won Sung;Kyeong Cheol Lee;Hyeong keun Kweon;Hui Jae Yun
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.25 no.1
    • /
    • pp.5-13
    • /
    • 2023
  • This study was conducted to identify items that should be considered in order to increase user satisfaction in the Jayeonmadang project by analyzing the importance and satisfaction targeting Gochang Jayeonmadang users. As a result of analysis on the importance and satisfaction of Gochang Jayeonmadang users focusing on 20 items in 6 fields, Overall, it was analyzed that they were not satisfied as they were important. In order to increase user satisfaction of Gochang Jayeonmadang, maintenance such as 'cleanliness and hygiene', 'water quality', 'vegetation growth', and 'facility management' should be carefully reflected from the planning and design stage, and careful attention should be paid even after the project. In addition, emphasis should be placed on enhancing the user convenience, such as 'accessibility', 'space layout and utilization efficiency', and 'convenience of route'. And, when promoting the Jayeonmadang project, the purpose of the project should be actively promoted to local residents to raise the residents' awareness of the importance of biodiversity in the city.

An Esthetic Restoration of the Missing Maxillary Anterior Teeth with the Rotational Path RPD: A Case Report (회전삽입로 국소의치를 이용한 심미적 상악 전치부 수복 증례)

  • Lee, Ji-Hye;Lim, So-Min;Jung, Hye-Eun;Park, Chan-Jin;Cho, Lee-Ra;Kim, Dae-Gon
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.27 no.2
    • /
    • pp.209-222
    • /
    • 2011
  • Missing anterior teeth can be replaced using any of a number of methods. Patients may choose to replace missing teeth with a prosthesis that is either removable, fixed, or retained with implants. For patients faced with financial, anatomical, and/or esthetic limitations, the edentulous region can be restored successfully and esthetically with a properly designed and fabricated rotational path RPD. The rotational path RPD is a partial removable dental prosthesis that incorporates a curved, arcuate, or variable path of placement allowing one or more of the rigid components of the framework to gain access to and engage an undercut area. The rigid retainer must gain access to the infrabulge portion of the tooth by rotating into place. Either a minor connector or proximal plate provides retention through its intimate contact with a proximal tooth surface. A specially designed dovetails or asymmetric rest seats provides support and embracing effects. Correctly designed and fabricated rotational path RPD can provide improved esthetics, cleanliness, and retention. But rotational path RPDs are technique sensitive since the rotational path RPD has little margin of laboratory error that rigid retainers cannot be adjusted like conventional clasps can, RPD framework must be remade once the retention is lost. The sufficient understanding of the concept for the rotational path RPD is required for clinically successful treatment. This clinical report describes in detail the theoretical, laboratory considerations and the treatment of a patient with an anterior maxillary edentulous area treated by an AP path rotational RPD that had a difficulty in long term maintenance and describes another clinical case in which more reasonable treatment procedures were approached after analyzing the former case.

Elicitation of Ecological Wetland's Creating & Maintaining Conditions through GIS & AHP Analysis (GIS와 AHP분석에 의한 생태습지의 생성 및 유지조건 도출)

  • Um, Dae Yong;Shim, Mi Young;Shin, Ke Jong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.29-40
    • /
    • 2013
  • The object of this research is to elicit the ecological wetland's creating and maintaining conditions through GIS and AHP(Analytic Hierarchy Process) on common characteristics of wetland, by exploring the function of the long-standing and naturally created wetlands in South Han-river basin. Geomorphological, geologic, hydraulic & hydrological, pedological, environmental & ecological approaches of five categorizations were made based on the documents and precedent studies in order to perform the research object. Elicitation of the common creating and maintaining conditions on the objected wetlands through analysis of satisfactory conditions was conducted by performing an overlay analysis from the gathered information in each category and linking its result to each wetland. Also, elicitation of highly believable qualified analysis result was made by calculating the each factor's weight through application of AHP analysis method on each factor. The research result is expected to be applied effectively in suitability selection for creation of an artificial wetland and restoration and maintenance for naturally created wetlands when introducing the No Net Loss of Wetlands. In addition, with a new understanding on wetland and beyond the value of its conservativeness, this research result can be considered as a solution for Eco-Wetland's maintainable development.

Trail Deterioration and Distribution Characteristics of South-North Green Corridor in Incheon, Korea - A Case Study of Mountainous Type Urban Natural Parks - (인천시 남북녹지축 탐방로의 분포와 훼손특성 -산지형 도시자연공원을 사례로-)

  • Cho Woo;Oh Kang-Im;Bae Joong-Nam
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.4
    • /
    • pp.359-368
    • /
    • 2004
  • The purpose of this study is to examine distribution and damages of the trails of inquiry of urban natural parks. Those parks were located at south-north green corridor at Incheon being mountainous type of urban natural parks that were core area of urban ecosystem preservation to of urban natural parks that citizens recently made use of them as nature experience type of leisure and recreation place from time to time, and to supply basic material deciding on the ways to improve the trails of nature preservation type. The survey sites included Geyang Park, Baekma Park, Yaksa Park, Munhak Park and Cheongryang Park. The number of main trails was 42 at Geyang Park, 43 at Baekma Park, 9 at Yaksa Park, 28 at Munhak Park, and 22 at Cheongryang Park, and it was excessively more than optimum needed: The number of branch trails of the parks seemed to increase. The bared trail width in average of the roads was 3.5m, while maximum depth in average was 21.3cm. The trails were thought to be deteriorated rapidly without systematic maintenance. The 5th and 6th grade of the impact rating class that required restoration because of serious deterioration occupied 19.6∼78.0%. Based on the findings, the study suggested ways to improve and manage the trails of inquiry of urban natural parks that were placed at south-north green corridor at Incheon.

Implant assisted removable partial denture using a few remaining maxillary teeth and locator bar system: A case report (소수 잔존치를 가진 상악에 Bar와 Locator®를 이용한 임플란트 융합 국소의치 치료 증례)

  • Kim, Seong-Jung;Bae, Eun-Bin;Jeon, Young-Chan;Jeong, Chang-Mo;Yun, Mi-Jung;Lee, So-Hyoun;Huh, Jung-Bo
    • The Journal of the Korean dental association
    • /
    • v.55 no.8
    • /
    • pp.528-536
    • /
    • 2017
  • Treatment with removable partial denture is effective for partially edentulous patients who are unable to obtain sufficient retention and stability for functional and esthetic restoration. There are several cases reporting the improvement of retention and stability of the partial denture using a small number of implants. However, there are limited studies on the implant-assisted removable partial denture using a small number of remaining teeth and the bar locator system. The bar locator system has an advantage in that it could compensate the angle of insertion of removable prosthesis on implant with inconsistent placement angle due to anatomical constraints compared to when using the locator only. This case report describes the patient with $Parkinson^{\circ}$Øs disease who was treated with the Locator bar system using two previously placed implants and two remaining teeth on maxilla. No additional implants could be placed because of the medical and economic condition of the patients, and the angle of one of two implants could not be matched with the direction of the removable partial denture insertion. Considering the angle of the implants, the patient was treated with implant-assisted RPD using the Locator bar system and had satisfactory results in the aspect of esthetics, masticatory function, and oral hygiene maintenance.

  • PDF

3D Wetlands Classification Mapping of Eulsukdo Area Using LiDAR Data (LiDAR 자료를 이용한 을숙도 지역 3차원 습지 구분도 제작)

  • Lee, Jae-One;Yi, Gi-Chul;Kim, Yong-Suk;We, Kwang-Jae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.6
    • /
    • pp.639-647
    • /
    • 2009
  • In line with the rapid settlement of information society, the demand for geospatial information and its applications are dramatically increasing. The Project of National Geographic Information System(NGIS) is actively on going to meet up-to-dateness and accuracy of geospatial data. It is fact that the public interest in environmental issues is increasing than ever in accordance with the restoration of the four major rivers, core project of Green New Deal Policy, and the event of the Ramsar General Meeting. Because the Nakdong River Estuary is a place of great importance in both aspects of wetland and environment conservation, a variety of researches related to this area are progressing. Although artificial developments and natural phenomena are rapidly changing the topography and ecosystem of this area, the effort to build topographic DB for change monitoring is very slow. This study describes a Lidar surveying project over the restored wetland Eulsukdo, the southermost part of the Nakdong River, to establish precise topographic DB throughout producing 3D topographical maps and wetland classification maps. The results of this study will make a large contribution to the systematic maintenance and management for the restored Eulsukdo wetland.

Conversion of implant overdenture to an implant assisted removable partial denture in maxilla: case report (상악 임플란트 피개의치에서 임플란트 보조 국소의치로의 전환: 증례보고)

  • Seong-Soo Cho;Min-Gyu Song;Yoon-Hyuk Huh;Chan-Jin Park;Lee-Ra Cho;Kyung-Ho Ko
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.62 no.1
    • /
    • pp.54-63
    • /
    • 2024
  • The long-term use of an implant overdenture shows problems, such as wear of attachment, concentrated occlusal forces on the anterior teeth, fracture of artificial teeth and rotation of denture. By transitioning to an Implant-assisted removable partial denture (IARPD) using additional implant placement, the problems can be solved. In this case report, a transition was made from implant overdenture to IARPD utilizing surveyed crowns to distribute occlusal forces concentrated on anterior teeth and to prevent denture rotation in a skeletal Class III patient. Design of definitive prosthesis with appropriate function and aesthetics was determined through several stages of provisional restorations. In this case, appropriate posterior occlusion and maintenance of peri-implant bone level of definitive prosthesis were observed.

Improvement study of river-crossing structures in geyongnam prefecture (경남의 지방하천에 설치된 하천횡단구조물의 현황과 개선방안)

  • Kim, Ki-Heung;Lee, Hyeong-Rae;Jung, Hea-Reyn
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.10
    • /
    • pp.809-821
    • /
    • 2016
  • The study area is local river of 671 (total length 3,741 km) in Gyeongnam prefecture, the results are as follows. Total number of river-crossing structures was investigated as 7,730, and it was found that structures were installed in 2.1 sites per 1 km (river length) on average. Diversion weirs for agriculture were 4006 (51.82%) and drop structures for channel bed maintenance were 3670 (47.48%), but the rest (riverbed road etc.) were 54 (0.70%). The number of high structures (height > 1.0 m) that affect many impact in upstream and downstream was investigated as 3,897 (51%), and the number of low structures (height < 0.5 m) that affect negligibly was 1109 (14%). Fish ladders have been installed on 640 (8%) structures in 153 (23%) rivers. In flood control and environment conservation, river-crossing structures brought about various impact that flood water level is raises and the eco-corridor is intercept. In order to improve these problems, we proposed a few engineering measures that can be realize with respect to river-crossing structures.

An experimental study on vortex formation in groyne fields according to groyne spacing and installed angles (수제간격과 설치각에 따른 수제역내 와형성에 대한 실험 연구)

  • Kang, Joongu;Kim, Sungjoong
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.1
    • /
    • pp.35-48
    • /
    • 2018
  • Groynes are installed generally to protect the riverside or the river bank from the erosion caused by water flows by controlling the flow direction and velocity in rivers. In the past, groynes were used to secure enough depth of water in canals. As there has been a growing interest in river restoration and the natural river maintenance since 2000, groynes are proposed as a major environmental hydraulic structure because the flow control and various river bed conditions around the groyne can contribute to habitat functions. Groynes are typically installed in a series. In designing groyne series, groyne spacing is an important factor because the flow changes in the main canal and the flow inside the groyne area occurs variably depending on the groyne spacing. This study provide information to determine the groyne spacing suitable for the purpose of the groyne by examining the flows that variably changes according to the groyne spacing and angle in the recirculation zone of the groyne field. In particular, the formation of vortex, the location of vortex core and the water flow near the river bank, all of which occur in the recirculation zone inside the groyne area, were mainly analyzed to examine the flow characteristics near the river bank that influences the safety of the river bank area. The results of the experiment will serve as important basic data to examine changes in the river bed inside the groyne area as well as the safety of river banks following the installation of groyne series.

Fault Location Estimation Algorithm in the Railway High Voltage Distribution Lines Using Flow Technique (반복계산법을 이용한 철도고압배전계통의 고장점표정 알고리즘)

  • Park, Kye-In;Chang, Sang-Hoon;Choi, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • High voltage distribution lines in the electric railway system placed according track with communication lines and signal equipments. Case of the over head lines is occurrence the many fault because lightning, rainstorm, damage from the sea wind and so on. According this fault caused protection device to wrong operation. One line ground fault that occurs most frequently in railway high voltage distribution lines and sort of faults is line short, three line ground breaking of a wire, and so on. For this reason we need precise maintenance for prevent of the faults. The most important is early detection and fast restoration in time of fault for a safety transit. In order to develop an advanced fault location device for 22.9[kV] distribution power network in electric railway system this paper deals with new fault locating algorithm using flow technique which enable to determine the location of the fault accurately. To demonstrate its superiorities, the case studies with the algorithm and the fault analysis using PSCAD/EMTDC (Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) were carried out with the models of direct-grounded 22.9[kV] distribution network which is supposed to be the grounding method for electric railway system in Korea.