• Title/Summary/Keyword: Maintenance and Repair

Search Result 1,061, Processing Time 0.027 seconds

Optimal Maintenance Scheduling in a Two Identical Component Parallel Redundant System Subject to Exponential Power Hazards

  • El-Damcese, M.A.;Helmy, A.N.
    • International Journal of Reliability and Applications
    • /
    • v.9 no.2
    • /
    • pp.141-152
    • /
    • 2008
  • This paper presents equations, which can be used to evaluate the failure frequency and the failure rate of a two identical component parallel redundant system in which each component can operate in its wear out period, and the failure rate of each component is exponential power distribution. The optimum maintenance interval for a two identical component parallel redundant system can be obtained using these equations. The proposed approach is presented and illustrated using several numerical examples. The optimum maintenance interval for each component in a two identical parallel redundant system will depend on factors such as: failure rate, repair and maintenance times of each component in the parallel redundant systems.

  • PDF

A Study on Performance Evaluation of Infrastructure Safety and Maintenance (시설물 안전 및 유지관리 성과 평가에 관한 연구 - 시설물 안전등급 변화를 중심으로 -)

  • Kang, Sanghyeok;Choi, Seok In;Kim, Hwarang;Lee, Jeongseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.80-89
    • /
    • 2016
  • Recently, the paradigm shift of new construction into efficient operation and maintenance of infrastructure is seen. Also, concerns about infrastructure safety, especially the aged infrastructure, are on the increase. This study evaluates the current status of infrastructure safety and maintenance using data from 1994 to 2014 in Facility Management System operated by Korea Infrastructure Safety Corporation. Also, a quantitative analysis of safety performance of infrastructure is conducted to find out the enhancement of infrastructure safety in Korea. It was found that safety of facilities in Korea have been enhanced for the past decades. Improvement of safety performance of facilities is attributed to periodic safety inspection and repair and reinforcement. The result of the study can be used as a basic material for efficient and effective facility maintenance policies and strategies.

Development of the Preventive Maintenance Template for Static Exciter in the Nuclear Power Plant (원자력발전소 정지형 여자기의 예방정비기준(PMT) 개발)

  • Chin, Soo-Hwan;Park, Jin-Youb;Hong, Young-Hee
    • Journal of Energy Engineering
    • /
    • v.20 no.2
    • /
    • pp.154-162
    • /
    • 2011
  • PMT(Preventive Maintenance Template) is a standardized maintenance program that describes maintenance items & period as operation condition to increase component reliability at the component level. The existing maintenance programs are focused on time based maintenance to inspect and repair component depend on fixed period. But recently, we have developed advanced maintenance program(named PMT) to increase reliability and optimize maintenance program of the plant significant component. This paper presents how to develop the PMT for nuclear power plant's static exciter.

Reliability Estimation of End Beam for Uncorved Freight Car using Damage Summation Method (신뢰성 분석을 이용한 무개화차용 엔드빔의 피로수명 평가와 계획예방정비)

  • Lee, Kyoung-Young;Jeong, Joo-Heon;Baek, Seok-Heum;Cho, Seok-Swoo;Joo, Won-Sik
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.394-399
    • /
    • 2004
  • Increased cumulative running times of railroad vehicle brings out such degradation as wear and fatigue. It don't adapt corrective maintenance which repairs a poor pan after a trouble but use preventive maintenance which fixes a bad part before a trouble. There were a few researches for preventive maintenance such as inspect affairs and facilities management. They couldn't estimate the operation reliability on railroad vehicle. Therefore, this study proposes the preventive maintenance procedure that predict repair period of end beam for uncovered freight car using reliability function and instantaneous failure rate on the basis of fatigue test and load history data.

  • PDF

Efficiency Analysis for Maintenance Management System of Users' Claims in Building (사용자 클레임에 대응하는 건물유지관리체계의 효율성 분석)

  • Kwak, Ro-Yeul;Yim, Dong-Soon
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.820-825
    • /
    • 2006
  • It is necessary to correspond to building users' claims rapidly as much as possible in order to satisfy user's need, because the final tarket of building maintenance service is user of building. This paper investigates the time taken for receiving users' claims and the time taken for the service organization to respond to the claims in the office building; types of claims and service responses are analysed, through which the response characteristics of the maintenance management organization are evaluated with respect to users' claims. Throughout extensive simulation analysis, important performance measures such as mean time to repair and utilization of maintenance personnels have been investigated.

  • PDF

A Study on the Problem and Improvement of Safety and Maintenance Management (국내 안전 및 유지관리의 문제점 및 개선방안에 관한 연구)

  • Kim, Sun Woong;Ahn, Kye Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.101-106
    • /
    • 2009
  • In order to build an effective management system for structures and to propose national policy and vision for advance of safety and maintenance management, 'Fundamental Scheme of Safety and Maintenance Management for Structures' has been established and promoted. As developed countries adopt preventive maintenance management, which is preventive as well as aggressive repair/strengthening for structures, it is needed to introduce life-cycle analysis method for improvement of economical efficiency. Therefore, this paper presents not only analysis of domestic conditions and problems related to system for safety and maintenance management, policies and costs for structures but an improvement plan.

Heuristic Algorithm for the Single-machine Scheduling with Periodic Maintenance (주기정비를 고려한 단일기계 일정계획을 위한 휴리스틱 알고리즘 설계)

  • Lee, Sang-Heon;Lee, In-Gu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.3
    • /
    • pp.318-327
    • /
    • 2008
  • This paper considers a single-machine scheduling problem with availability constraints. In many realistic situations, machines may not be always available due to various reasons such as maintenance, breakdown and repair. However, most literature on scheduling assume that the machines are available at all times. This paper deals with a single-machine scheduling problem with periodic maintenance. If the maintenance decision is made jointly with the job scheduling, the system will be more effective. The objective is to minimize the total completion time of jobs. This problem is proved to be NP-hard in the strong sense. The proposed breaking heuristic(BH) algorithm rule is established by some theorems and conditions. Our computational results show that the BH algorithm is much more efficient than existing heuristic.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF