• Title/Summary/Keyword: Maintenance Simulation

Search Result 807, Processing Time 0.022 seconds

The Generator Maintenance Scheduling using Fuzzy Multi-criteria (퍼지다목적함수를 이용한 발전기보수유지계획의 수립)

  • 최재석;도대호;이태인
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1995.10b
    • /
    • pp.131-138
    • /
    • 1995
  • A new technique using integer programming based on fuzzy multi-criteria function is proposed for generator maintenance scheduling. Minimization maintenance delay cost and maximization reserve power are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria integer programming is used. In the maintenance scheduling, a characteristic feature of the presented approach is that the crisp constraints with uncertainty can be taken into account by using fuzzy set theory and so more flexible solution can be obtained. The effectiveness of the proposed approach is demonstrated by the simulation results.

  • PDF

Scheduling of Preventive Maintenance for Generating Unit Considering Condition of System (시스템의 상태를 고려한 발전설비의 예방 유지보수 계획 수립)

  • Shin, Jun-Seok;Byeon, Yoong-Tae;Kim, Jin-O;Kim, Hyung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1305-1310
    • /
    • 2008
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

Assessment of the CO2 Emission Considering the Generator Maintenance Scheduling (발전기보수유지계획을 고려한 CO2배출량의 추정)

  • Jeon, Dong-Hoon;Park, Jeong-Je;Oh, Tae-Gon;Cho, Kyeong-Hee;Choi, Jae-Seok;Baek, Ung-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1507-1513
    • /
    • 2010
  • The $CO_2$ emission can be decreased due to freedom of generator maintenance scheduling(GMS). This paper proposes assessment of $CO_2$ emission considering generator maintenance scheduling(GMS) and evaluates effect of the GMS on $CO_2$ emission. And also, this paper assesses the $CO_2$ emission and the probabilistic production cost simulation of nuclear and thermal power generators considering operation of hydro and pumped generator. The minimum reliability criterion level satisfied production cost minimization function model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system in Korea in 2010.

The Optimal Inventory Level of the Maintenance Float to Achieve a Target Operational Availability of Korean-Made Helicopter (한국형 헬기의 목표 운용가용도 달성을 위한 정비대충장비 최적 재고수준 결정)

  • Lee, Sang-Jin;Kim, Seong-Won
    • Korean Management Science Review
    • /
    • v.24 no.2
    • /
    • pp.81-93
    • /
    • 2007
  • Achieving a target operational availability is more economical and efficient than having many quantities of the weapon system, since the cost of weapon system becomes expensive. The intent of this study is twofold; first, we develop the simulation model to determine the optimal inventory level of the maintenance float while achieving a target operational availability of the Korean-made helicopter. The quantity decision model considers following factors such as a reliability. a turn around time(TAT). a protection level for inventory, and so on. Second, we analyze whether the existence of a lateral transshipment among bases and the reduction of TAT relate to an inventory level and the operational availability. The research result shows that both TAT and lateral transshipment have an effect on reducing the inventory level of the maintenance float and improving an operational availability.

A Study on the Automatic Assembly/Disassembly Procedure for Generating Maintenance Guideline (정비절차 생성을 위한 자동 분해/조립절차 연구)

  • Heo, Gilhwan;Lee, Won;Kwon, Kisang
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.18 no.5
    • /
    • pp.594-601
    • /
    • 2015
  • The purpose of this research is to propose a maintenance support system for deciding assembly sequence of the product and appropriate tools that are used to assembly and disassembly of parts in the product when geometric properties of the product. The digital maintenance system (DMS) is developed to generate the maintenance guideline and the initial experiment is conducted especially for an underwater weapon system with cylindrical structure. DMS considers four factors to find the efficient assembly and disassembly procedure automatically: (1) assembly tree, (2) properties of each part, (3) distance from the center of the product, and (4) volume. Based on the factors, DMS simulate the movement of each tool virtually and the properties of tools are investigated to find an appropriate tool for using assembly and disassembly of each part in the product. The proposed approach integrates modeling, simulation, data configuration, and virtual reality to allow a development of preliminary maintenance guidance.

A Study on the Efficient Operation of Automated Teller Machine(ATM) Maintenance Using Simulation (시뮬레이션을 이용한 금융 ATM기 유지보수의 효율적 운영에 관한 연구)

  • Yu, Hyeung-Keun;Lee, Kang-Won
    • Korean Management Science Review
    • /
    • v.28 no.1
    • /
    • pp.107-116
    • /
    • 2011
  • The automated teller machine (ATM) is developed as a system to provide customers with an easy deposit and withdrawal of their money without time restriction and be served for 24 hours. Today, ATM is come up to the level of an unmanned branch. The automatic financing system is developed as an essential one for dealing with the rationalization of management and the globalization of financing in order to improve the efficiency of financial management work and increase the customer service quality. With reducing the operational cost of financial organizations through the efficient maintenance operation of ATM and increasing the service quality through the maximization of its processing efficiency, this study is to draw the scheme to ensure the competitiveness among the finance companies. The importance of ATM is highly recognized as the utilization of ATM is increased and the processing function is extended, but ATM is quite vulnerable to the malfunction occurred during the nighttime after banking hours. The ATM maintenance is done through consignment to the specialized maintenance company. The efficient operation of ATM maintenance work is important to the satisfaction of customer using ATM in the nighttime.

Visualization and Analysis of Remote Operation involved in Advanced Conditioning Process

  • Yoon, Ji-Sup;Kim, Sung-Hyun;Song, Tai-Gil
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.205-219
    • /
    • 2004
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance technology needs to be developed along with the design of the process concepts. To develop such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the graphic simulator, not in the real environment. The graphic simulator will substantially reduce the cost of the development of the remote handling and maintenance procedure as well as the process equipment, while at the same time developing a remote maintenance concept that is more reliable, easier to implement, and easier to understand.

  • PDF

Comparative Study for the Validation of TPNSim++ and its Applicability to Military Simulation (TPNSim++의 검증 및 군사 시뮬레이션 분야의 활용성)

  • 최상영;김대운
    • Journal of the military operations research society of Korea
    • /
    • v.23 no.2
    • /
    • pp.1-14
    • /
    • 1997
  • TPNSim++ is the object-oriented framework for the discrete event simulation of military systems, developed by authors. The simulation world view of TPNSim++ is on the basis of activity scanning. TPNSim++ is implemented as C++ class library under Windows 95/NT. It uses the extended timed Petri nets which are called TPNSim nets for simulation modeling tool. The aim of this study is to conduct a comparative study of TPNSim++ and SLAM II in the simulation of military maintenance systems for the validation and the applicability of TPNSim++. From this study, TPNSim++ and SLAMII have given the same results under the equivalent assumption. Thus we can get the validation of TPNSim++ and its applicability to the simulation of maintenance systems.

  • PDF

Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies (M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정)

  • Ahn, Jae-Kyoung;Choi, Bong-Wan;Lee, Yong-Kyu
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.

Establishment of Preventive Maintenance Planning for Generation Facility Considering Cost (비용을 고려한 발전설비의 예방유지보수 계획 수립)

  • Kim, Hung-Jun;Shin, Jun-Seok;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.328-333
    • /
    • 2007
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for tm based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM In this paper, a Markov state model much can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

  • PDF