Proceedings of the Safety Management and Science Conference
/
2004.11a
/
pp.131-141
/
2004
This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.12
/
pp.1712-1720
/
2017
In South Korea, minimum reserve rate, which is to satisfy reliability standard, has been determined by simulation result using WASP. But, it is still controversial whether the level of minimum reserve rate is adequate. Thus, in this study, various analyses of minimum reserve rate are being conducted. WASP uses the probabilistic simulation technique to evaluate whether reliability standard is satisfied. In this process, forced outage rate and maintenance periods of each generator play important roles. Especially, the long-term plan can be varied depending on how maintenance periods deal with. In order to model maintenance periods in the probabilistic simulation technique, WASP uses derating method. However, broad analyses have to be conducted because there are various ways including derating method to model maintenance periods which result in different results. Therefore, in this paper, 3 different maintenance outage rate modeling methods are applied to arbitrarily modeled system based on the basic plan for long-term electricity supply and demand of South Korea. Results show impact of each modeling method on minimum reserve rate.
With growing demand for zero defects, predicting reliability of software systems is gaining importance. Software reliability models are used to estimate the reliability or the number of latent defects in a software product. Most reliability models to estimate the reliability of software in the literature are based on the development lifecycle stages. However, in the maintenance phase, the software needs to be corrected for errors and to be enhanced for the requests from users. These decrease the reliability of software. Software Reliability Growth Models (SRGMs) have been applied successfully to model software reliability in development phase. The software reliability in maintenance phase exhibits many types of systematic or irregular behaviors. These may include cyclic behavior as well as long-term evolutionary trends. The cyclic behavior may involve multiple periodicities and may be asymmetric in nature. In this paper, SGRM has been adapted to develop a reliability prediction model for the software in maintenance phase. The model is established using maintenance data from a commercial shop floor control system. The model is accepted to be used for resource planning and assuring the quality of the maintenance work to the user.
International conference on construction engineering and project management
/
2009.05a
/
pp.856-863
/
2009
The problem of urban decay in Hong Kong has drawn much attention of both practitioners and academics. Poorly managed buildings not just give a negative image to the Pearl of the Orient in the region, but also pose potential risk hazards to the health and safety of the general public. While it is necessary to devise a comprehensive plan on redevelopment and urban planning, preserving the existing buildings to maintain their conditions for habitation can be a short-term option to safeguard quality standard. With the increasing number of ageing buildings in Hong Kong, a lot of research efforts have been devoted to managing repair and maintenance projects properly (for example those initiated and funded by the Construction Industry Institute, Hong Kong; and the current study financially supported by The Hong Kong Polytechnic University). Given the short duration and more diversified nature of work, building repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. This paper aims to provide a comprehensive analysis on the problems of running building maintenance projects. An extensive review of contemporary literature was firstly conducted, which forms a solid basis for developing an empirical study on the problems and difficulties of running building maintenance projects from the viewpoints of industrial practitioners with a view to formulating effective strategies for managing maintenance projects successfully.
The statistical analyzing of environmental-friendly planning elements is getting important because it is getting concerned with the change of residential types and environmental friendly housing. However, in terms of the high-rise residential complex, paper about green building rating system and research about residential satisfaction to residents are lack. Therefore, this paper is analyzing of impotentness and satisfaction about housing subdivision, inside of building, facility, and maintenance. In addition, residential satisfaction(satisfaction, loyalty, preference) and impact relationship of environmental-friendly planning elements are analyzed by PLS structural equation. To sum up, first, improving of green building rating system in housing subdivision is impacted on loyalty if satisfaction was fulfilled. Second, increasing of environmental-friendly planning elements in inside of building is impacted on loyalty if both satisfaction and preference were fulfilled. Third, providing of green building rating system in facility and maintenance is analyzed as preference, but satisfaction hypotheses is not valued.
Proceedings of the Safety Management and Science Conference
/
2010.04a
/
pp.219-230
/
2010
Remarkably improvements have occurred recently in the maintenance management of physical assets and productive systems, so that less wastages of energy and resources occur. The technology of maintenance is about finding and applying cost-effective ways of avoiding or overcoming performance deterioration. Maintenance is thus a vital support function in business, especially as increasingly large investments are being required in physical assets. TPM(Total Productive Maintenance) focuses on optimizing planning scheduling. Availability, performance and quality rate are other factors that affect productivity. Especially there are some losses that affect the overall equipment effectiveness(OEE). These losses lead to low values of OEE, which provides an indication of how effective the production precess is. This study explores the ways in which Korean small and medium manufacturing industries can improve OEE.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.11
/
pp.1892-1902
/
2007
This paper presents a new generating unit maintenance scheduling algorithm considering regional reserve margin and transfer capability. Existing researches focused on reliability of the overall power systems have some problems that adequate reliability criteria cannot be guaranteed in supply shortage regions. Therefore specific constraints which can treat regional reserve ratio have to be added to conventional approaches. The objective function considered in this paper is the variance (second-order momentum) of operating reserve margin to levelize reliability during a planning horizon. This paper focuses on significances of considering regional reliability criteria and an advanced hybrid optimization method based on PSO algorithm. The proposed method has been applied to IEEE reliability test system(1996) with 32-generators and a real-world large scale power system with 291 generators. The results are compared with those of the classical central maintenance scheduling approaches and conventional PSO algorithm to verify the effectiveness of the algorithm proposed in this paper.
Journal of Korean Society of Industrial and Systems Engineering
/
v.18
no.36
/
pp.265-273
/
1995
This paper is to analyze and provide some managerial requirements for the successful implementation of total productive maintenance system. It tries to identify determining factors for success and reasons for the failures of TPM, based on the research of a survey and an empirical study through the years in Korea. The findings are such that many companies have not been engaged in planning and control the maintenance cost and their maintenance activities are not organized systematically. However, many indicators show that the number of finns which try to introduce and implement TPM is getting increased. The successful implementation of TPM depends largely on how top management perceives TPM and how the firm responds In the changes of organization and of the role of workers to adapt this new concept of work. It is required that TPM is perceived as a means to achieve the firm's business objectives. It is recommended that each company constructs and develops its own model and procedures to drive the effort for TPM implementation.
Journal of Korean Institute of Industrial Engineers
/
v.22
no.4
/
pp.619-631
/
1996
This paper describes an approach for the incorporation of maintenance times into a hierarchical scheduling for a failure prone flexible manufacturing system. The maintenance should not be performed too often because of the resulting reduction of capacity. Most manufacturing systems are large and complex. It is natural to divide the control into a hierarchy consisting of a number of different levels. Each level is characterized by the length of the planning horizon and the kind of data required for the decision making process. The goal of the analysis reported here is to calculate the production requirements while the machines fail and are repaired at random times. The machine failure and preventive maintenance are considered simultaneously.
The purpose of this study is to produce basic planning criteria required in ecological restoration and improvement works of streams in rural area through the application of stream assessment methods (water quality, soil environment, and ecological function assessment) at 6 study sites of Han River basin. The investigation results were as followings; 1) There were the evaluation items like a manure use, salt degree, river peripheral tree, which did not fitted to apply to domestic streams, in the SVAP (Stream Visual Assessment Protocol) and NRCS Riparian Assessment that were evaluation models developed in USDA. The area inhabitants with a little knowledge and education personally seems to utilize the evaluation methods through improvement partly with an aspect that evaluation is slightly easy. 2) From the stream assessment results, the construction of diverse pools, large woody debris and isolated backwater pool are needed to improve a few of problems observed at the mostly study sites. The result of NRCS Riparian Assessment showed that the improvement of stream bank vegetative communities is needed by planting tree with deep-binding root masses, and managing of noxious weeds and exotic undesirable plants. 3) Summing up, the assessment results showed that the assessment scores were higher at upstream than downstream, the stream with totally maintenance than that with partly maintenance, the stream with slope bank than that with vertical bank, and the stream with a flood plain than that without a flood plain. So, the direction of stream maintenance projects must be set by consideration of those results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.